Summary
Overview
Work History
Education
Skills
Timeline
BusinessDevelopmentManager
David Craddock

David Craddock

Painter/Sprayman
Gastonia,NC

Summary

Flexible hard worker ready to learn and contribute to team success.

Reliable Foreman with more than 20 years of construction site experience. Superb project oversight, team management, and blueprint interpretation skills. Bilingual and successful in meeting tight job deadlines.

Detailed Foreman skilled in planning, assigning and directing work tasks. Team-oriented professional with strong commitment to maintaining safe, clean job sites. Dedicated to quality and clear communication.

Proficient Sprayman with good problem-solving and group management skills. Successful at keeping employees on-task and achieving quality objectives.

Trustworthy professional offering over 12 years as Foreman. Focused and skilled in coordinating personnel, materials and equipment. Decisive when responding to urgent issues and resolving problems.

Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

18
18
years of professional experience

Work History

Foreman/Sprayman

Platinum Coating's
Charlotte , NC
2019.01 - 2023.06
  • Inspected tools, materials, and equipment to ensure quality standards were met.
  • Conferred with senior management, owners, contractors, and design professionals to discuss project goals and problem solve.
  • Delegated work to staff, setting priorities and goals.
  • Prepared and planned worksites to help jobs run smoothly.
  • Coordinated with other departments to ensure project deadlines were met.
  • Planned and managed manpower and resource requirements to support project activities.

Painter/Sprayman

Aldridge Painting
Mt. Holly, NC
2017.02 - 2019.01
  • Ensured proper ventilation while using solvents or oil-based paints.
  • Filled cracks, holes or joints using caulking guns or putty knives.
  • Prepared sheetrock, metal and wood surfaces for painting.
  • Performed minor plaster repair, blending newly renovated wall surfaces with existing plaster.
  • Consulted with clients regarding colors and finishes.
  • Used power and hand tools safely and effectively.
  • Wore protective clothing such as masks, respirators and gloves.
  • Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
  • Operated airless spray equipment and motorized lifts.
  • Chose correct brushes and materials for jobs and purchased from vendors.
  • Sprayed prepared surfaces with specified amounts of primers and finish coatings.
  • Applied paint with brushes, rollers, spray guns, or other equipment.
  • Mixed and applied paints, varnishes and sealants to promote lasting finish.
  • Constructed scaffolding and supports to complete work above ground-level.
  • Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
  • Applied primers and sealers to prepare new surfaces for painting.

Line Loader/Picker Packer

Champion Powder Coating
Gastonia, NC
2016.01 - 2016.11
  • Stacked goods on shelves, racks or pallets in an orderly manner as directed by supervisors.
  • Labeled products correctly before placing them in designated areas of the warehouse.
  • Contributed to team-based environment to maintain line productivity and meet expected deadlines.
  • Recognized defective material and reported issues to management.
  • Maintained a safe working environment by adhering to all safety protocols, including wearing protective equipment such as gloves, glasses and steel-toed boots.
  • Checked merchandise for damages or shortages, accurately completed paperwork and reported discrepancies to supervisor.
  • Inspected finished parts and components to enforce QA standards and uncover defects prior to packaging.
  • Boxed, labeled and moved items to keep production lines moving swiftly.
  • Cleaned work area regularly throughout shift to ensure safety compliance regulations were met.
  • Operated large vehicles, forklifts and pallet jacks to transport multiple freight loads.
  • Understood and followed oral and written directions.
  • Protected items by wrapping in cling film, padded moving blankets and tape.
  • Stored and organized items in tool or supply rooms, allowing for easy retrieval.
  • Picked up heavy objects using proper lifting techniques to avoid personal injuries.
  • Trained new employees regarding warehouse procedures and standards.

Foreman/Sprayman

Platinum Coating's
Charlotte , NC
2012.04 - 2016.01
  • Demonstrated leadership skills in managing projects from concept to completion.
  • Developed and maintained courteous and effective working relationships.
  • Passionate about learning and committed to continual improvement.
  • Acted as a team leader in group projects, delegating tasks and providing feedback.
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Skilled at working independently and collaboratively in a team environment.

Painter/Sprayman

Woods Painting
Belmont , NC
2005.01 - 2012.01
  • Skilled at working independently and collaboratively in a team environment.
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Cultivated interpersonal skills by building positive relationships with others.
  • Passionate about learning and committed to continual improvement.

Education

GED -

Walter State Community College
Jefferson City, TN
2004-07

Skills

  • Construction Management
  • Site Inspection
  • Teamwork and Collaboration
  • Worksite Safety
  • OSHA Compliance
  • Daily Reporting
  • Crew Leadership
  • Workplace Safety
  • Materials Management
  • Heavy Lifting
  • Commercial Construction Experience
  • Technical Knowledge
  • Quality Control
  • Scaffolding Set up

Timeline

Foreman/Sprayman

Platinum Coating's
2019.01 - 2023.06

Painter/Sprayman

Aldridge Painting
2017.02 - 2019.01

Line Loader/Picker Packer

Champion Powder Coating
2016.01 - 2016.11

Foreman/Sprayman

Platinum Coating's
2012.04 - 2016.01

Painter/Sprayman

Woods Painting
2005.01 - 2012.01

GED -

Walter State Community College
David CraddockPainter/Sprayman