A dedicated design professional with 14+ years of design and construction experience, adept at leading others and achieving results under stressful conditions and committed to improving processes in order to attain high quality work with maximum efficiency.
Overview
14
14
years of professional experience
1
1
Certification
Work History
Quality Assurance Lead
Scenario Global
08.2023 - Current
Led on-site quality assurance for scenic installation of Mario Kart at Epic Universe, ensuring strict adherence to creative vision, technical specifications, and engineering standards
Provided comprehensive design and engineering support for fabrication and installation, ensuring seamless integration of scenic elements with ride and show components
Collaborated with multidisciplinary teams to troubleshoot site issues, develop in-field solutions, and maintain project timelines and budgets
Oversaw vendor performance, ensuring consistent adherence to project requirements throughout production and installation
Led close out efforts for as installed design and engineering drawings and calculations, O&M manuals, and QA documentation
Technical Director
Scenario Global
01.2021 - 08.2023
Directed design and coordination of all show-related elements for Epic Universe's Mario Kart, balancing creative intent with guest experience, local building codes, and safety standards
Optimized internal Show Set design and BIM workflows, enhancing coordination with facility teams and streamlining project execution
Led cross-disciplinary collaboration with Show Set Design and Engineering, Facility Architecture & Engineering, and Project Management to deliver projects on schedule and within budget
Supervised design leads and BIM team to ensure timely delivery of project deliverables and maintaining high-quality design outcomes
Managed external vendors, ensuring design development, documentation, and integration aligned with project goals and Universal standards
Senior Technical Designer
Scenario Global
01.2020 - 03.2021
Led the development of detailed, integrated, and constructible design drawings for theme park attractions and museum projects, from concept through fabrication and installation
Directed internal and external design resources, ensuring alignment with creative vision, technical requirements, and project timelines
Managed scenic design budgets and schedules, coordinating with vendors to maintain cost-effective and timely project execution
Conducted comprehensive design reviews, ensuring technical accuracy, feasibility, and integration of scenic and show elements
Designer & General Contractor
Three Hope, LLC
01.2014 - 01.2019
Created architectural designs and permit sets for multi-family projects, integrating historical and modern styles while ensuring regulatory compliance
Managed construction projects from conception to completion, overseeing budgeting, scheduling, subcontractor coordination, and quality control
Ensured seamless communication with stakeholders, maintaining project timelines and adherence to design specifications
Senior Technical Designer
Solomon Group Productions
01.2017 - 01.2018
Developed modular, scalable design solutions for permanent museum exhibits, leading prototyping efforts to optimize production efficiency and quality
Conducted product and application testing, documenting results to inform design decisions and improve constructability
Established database for materials and hardware to enhance the design decision-making and processes
Led design teams in creating comprehensive drawing packages and submittals, ensuring accuracy and alignment with creative and technical requirements
Technical Designer
Solomon Group Productions
01.2015 - 01.2017
Designed scenic elements for museums, theme parks, zoos, theatrical productions, and live events, collaborating with creative directors and engineering teams
Produced detailed renderings, construction drawings, CNC files, BOMs, and 3D models using AutoCAD, Adobe Creative Suite, and Rhino
Ensured compliance with creative intent, technical specifications, and project schedules through meticulous design documentation
Project Administrator
The Tobler Company, LLC
01.2011 - 01.2015
Participated in multidisciplinary BIM coordination meetings for Tulane Stadium, contributing to clash detection and constructability analysis
Reviewed design and contractor change proposals and VE options, advocating for owner interests and ensuring alignment with project goals
Conducted daily site inspections at the Mercedes-Benz Superdome, monitoring contractor performance and compliance with design specifications
Developed and presented a digital drawing database to SMG executives, improving construction management for capital projects at LSED facilities by facilitating rapid access to as built data on site