30+ year career highlighted by rapid advancement and consistent achievement in the construction field. Skilled in directing small to multi-million dollar construction projects from initial planning throughout the construction cycle, to facilities start-up. Knowledgeable in all areas of construction, engineering and installation of industrial as well as commercial projects. Areas of strengths include mechanical, piping, civil/structural as well as electrical. Ability to identify and implement strategies to improve and stream-line construction activities. Well-respected in the construction industry with the outstanding ability to oversee site staff, multiple disciplines of construction activities, contractors and projects.

Overview

38
38
years of professional experience
1
1
Certification

Work History

Fabrication Shop Manager / Owner

Ozark Metalworks
05.2021 - Current
  • Oversaw daily operations of fabrication shop, ensuring safety and quality standards were consistently met.
  • Managed workflow schedules to optimize production efficiency and reduce downtime.
  • Trained and mentored team members on fabrication techniques and safety protocols.
  • Implemented process improvements that enhanced productivity and reduced material waste.

Construction Site Manager

Cargill
01.2019 - 04.2021

Construction Site Manager, contract to Cargill on several projects during this time period.

Expansion of their export tank farm terminal in Reserve, LA. Project was plagued with high water and ground water. The original design could never be built in the conditions we faced. I proposed a different method to the engineering firm that they accepted with minor changes so that we could complete the construction of the bulk oil tanks.


Cargill had a fire at their Houston, TX export terminal that halted all exports. I went in and managed the rebuild which included equipment changeout, steel replacement and electrical repair. We were able to get them back up and running quicker that was expected.


Cargill had a dock renovation and new loaders install at there New Orleans Westbank location. Coordination of construction activities while the facility maintained operational status of the facility.

Site Manager

Burns & McDonnell
06.2017 - 12.2018
  • Contract Position for Burns & McDonnell in Salina, KS for Schwan’s foods. Managing multiple facility projects in an operating environment.

Senior Construction Manager

Bunge North America
03.2012 - 11.2017
  • Direct hire employee to Bunge North America as their Senior Construction Manager at the Bunge North America Corporate Headquarters in St Louis, MO. Managed the day to day activities, safety program, and the execution of the major capital projects at numerous locations. In charge of the schedule, project cost and safety of the projects along with proposed change order reviews. Reported project issues as well as status to the Project Manager. Held pre-bid meetings, bid award meetings, project kick off meetings as well as site orientations and safety meetings with the contractors.
  • Constructed 3 concrete slip pour silos for meal storage as well as installation of the distribution conveyors and equipment in Destrehan, LA. $15 mil
  • Managed major outages and installations in the soybean crush facilities. Piping and equipment installation in a very compressed timetable and footprint of real estate in Destrehan, LA. $7 mil
  • Managed 2 simultaneous River dock replacement and river belt upgrade projects. Included control and power upgrades in Helena, AR and Mayersville, MS $45 mil
  • Managed completion, check-out and start-up of Canadian Canola Crush facility in Altona, Manitoba, Canada. $285 mil
  • Managed installation, check-out and start-up of bulk grain ship loading facility. This included a complete upgrade to the plant 13-8 high voltage distribution system in Destrehan, LA. $230 mil

Construction Manager

Didion Milling
11.2017 - 05.2017
  • Direct Hire Employee of Didion Milling managing the construction of a $40 mil Corn Mill Facility in Cambria, WI. Also managed onsite Didion Construction and Millwright crew of 20.

Construction Manager

Belcan Technical Services
05.2006 - 10.2011
  • Contract to Monsanto, Site Construction Manager at the Monsanto Corporate Headquarters in St Louis, MO. Managed the day to day activities, safety program, and the execution of the major capital projects on the Monsanto site. In charge of the schedule, project cost and safety of the projects along with proposed change order reviews. Reported project issues as well as status to the Project Manager. Held pre-bid meetings, bid award meetings, project kick off meetings as well as site orientations and safety meetings with the contractors.
  • Projects Included:
  • 40,000sf state of the art Data Center that is the hub for all of the Monsanto network and IT communications and data storage. $30 mil
  • Two 60,000sf total gut renovations of office buildings. $28 mil
  • Installation of a new 20,000sf administration building for the Jerseyville Facility, including a seed handling facility. $5 mil
  • Complete replacement of the high voltage feeder and duct bank system with minimal down time for the research facilities in Creve Coeur. $6 mil
  • 15,000sf Regulatory complex erected in Creve Coeur, including a seed grinding and disposal system. $6 mil
  • Managed the installation of the fire sprinkler system in a 200,000sf occupied office building with minimal disruption to daily activities. $5 mil
  • Numerous smaller projects that required precise coordination to minimize any affects on day to day activities.

Construction Coordinator

Belcan Technical Services
03.2005 - 05.2006
  • Contract to Anheuser-Busch, assisted in the construction management of the site construction activities in the installation of two new state of the art bottling lines in the Bevmo Building as well as a new co2 facility.

Planner/Scheduler

Ambitech Engineering
03.2004 - 03.2005
  • Produced and maintained numerous small project schedules for the implementation of the Hartford Integration project as well as long range planning schedules for the ConocoPhillips Roxanna Facility's future capital projects. Planned and scheduled several outages for existing facility upgrades.

Construction Lead Coordinator

Belcan Technical Services
02.1994 - 03.2004
  • Contract to Monsanto, directed and organized construction projects; effectively communicated with contractors, handled pre-bids, bid awards, change orders, monitored all construction activities and coordinated activities to ensure smooth completion of entire project. Quickly advanced from field construction coordinator to project lead due to strong ability to manage personnel, organize projects, and complete jobs safely and economically. Carried projects from constructability reviews through completion, commissioning and turnover to site management.
  • Projects Included:
  • G&H GI lines process facility $35 mil
  • GI Bulk process and rail loading facility $12 mil
  • Two Conventional Tech Round-up facilities $76 mil each
  • Waste water treating facility $19 mil
  • PCL3 de-bottlenecking and expansion projects $23 mil
  • Packaging expansion projects $1.5 mil
  • DSIDA expansion projects $60 mil
  • Numerous de-bottlenecking and facility enhancement projects
  • GIX The first super GI facility that Monsanto built. $70 mil
  • Package boiler installation and facility modernization. $27 mil

Piping/Boilermaker Supervisor

Fluor Daniel
03.1992 - 02.1994
  • Employed as a Supervisor and craftsman on numerous projects and turnarounds in the petro-chem and power generation industry. Projects Included:
  • Boiler outage and re-tube, Entergy, Sterlington, LA
  • Coker Rebuild Chevron, Pascagoula, MS
  • Heater Rebuild Chevron, Pascagoula, MS
  • Coker Rebuild Exxon, Baton Rouge, LA
  • Boiler outage and re-tube,Entergy Greenville, MS

Piping Supervisor

HB Zachry
03.1990 - 01.1992
  • Piping Supervisor on numerous projects in the Chemical and Pulp and Paper industries. Projects Included:
  • Night shift GF of 4 pipe crews on the piping change out on a paper machine gut and rebuild, International Paper, Pinebluff, AR
  • Piping Foreman on a major turnaround on a ethanol furnace, Vista Chemical, Sulphur, LA
  • Piping Foreman on several upgrade projects in the bleach plant and pulp mill, Mansfield Paper, West Monroe, LA

Journeyman Pipefitter / Foreman

BE&K Construction
02.1988 - 02.1990
  • Journeyman Pipefitter and eventual Foreman on a maintenance contract with International Paper in Bastrop, LA:
  • Performed numerous upgrade and modernization projects throughout the facility.
  • Promoted to Powerhouse Foreman where I was in charge of all internal piping of existing Boiler house to tie into the new boiler house built by another contractor.

Education

Engineering

LA Tech University
Ruston, Louisiana

Mechanical Engineering

University of New Orleans
New Orleans, Louisiana

Skills

  • Project Planning & Management
  • Budgeting & Cost Estimating
  • Purchasing & Materials Management
  • Personnel Management
  • Job Tracking & Management
  • Scheduling & Planning
  • Problem Identification & Resolution
  • Safety & Compliance Management
  • Industrial Piping/Equipment Installation and Check-out
  • Structural Steel Erection
  • Site Prep & Concrete Placement
  • Facility Check-out & Commissioning
  • Team Player

Certification

  • Trenching & Excavation Competent Person
  • Scaffolding Competent Person
  • 30 Hour OSHA
  • Primavera/Suretrak/P3
  • Microsoft Project/Word/Excel/Powerpoint
  • Project Management Certification
  • First Aid and CPR Certifications

Timeline

Fabrication Shop Manager / Owner

Ozark Metalworks
05.2021 - Current

Construction Site Manager

Cargill
01.2019 - 04.2021

Construction Manager

Didion Milling
11.2017 - 05.2017

Site Manager

Burns & McDonnell
06.2017 - 12.2018

Senior Construction Manager

Bunge North America
03.2012 - 11.2017

Construction Manager

Belcan Technical Services
05.2006 - 10.2011

Construction Coordinator

Belcan Technical Services
03.2005 - 05.2006

Planner/Scheduler

Ambitech Engineering
03.2004 - 03.2005

Construction Lead Coordinator

Belcan Technical Services
02.1994 - 03.2004

Piping/Boilermaker Supervisor

Fluor Daniel
03.1992 - 02.1994

Piping Supervisor

HB Zachry
03.1990 - 01.1992

Journeyman Pipefitter / Foreman

BE&K Construction