30+ year career highlighted by rapid advancement and consistent achievement in the construction field. Skilled in directing small to multi-million dollar construction projects from initial planning throughout the construction cycle, to facilities start-up. Knowledgeable in all areas of construction, engineering and installation of industrial as well as commercial projects. Areas of strengths include mechanical, piping, civil/structural as well as electrical. Ability to identify and implement strategies to improve and stream-line construction activities. Well-respected in the construction industry with the outstanding ability to oversee site staff, multiple disciplines of construction activities, contractors and projects.
Construction Site Manager, contract to Cargill on several projects during this time period.
Expansion of their export tank farm terminal in Reserve, LA. Project was plagued with high water and ground water. The original design could never be built in the conditions we faced. I proposed a different method to the engineering firm that they accepted with minor changes so that we could complete the construction of the bulk oil tanks.
Cargill had a fire at their Houston, TX export terminal that halted all exports. I went in and managed the rebuild which included equipment changeout, steel replacement and electrical repair. We were able to get them back up and running quicker that was expected.
Cargill had a dock renovation and new loaders install at there New Orleans Westbank location. Coordination of construction activities while the facility maintained operational status of the facility.