Seeking a position of journeyman lineman with twenty five years of Class A CDL driving experience and five years of overhead and URD experience. Started with PEPCO as secondary qualified to journeyman lineman.
Have worked in
Construction: set new poles, Out-rigged old conductors, installed rollers and jet-line, ran tension machine & pulling machine to install new conductor wire.
Maintenance: Replaced struck & rotten poles, cross arms and equipment such as regulators, capacitor banks, gang switches, vipers, single transformers, bank of transformers, single phase cable poles, 3 phase cable poles. Made up pot-heads, built 150E poles, built 40K poles.
URD: Locate and repair primary and secondary faults using a thumper, load scale, and spitfire. Installed service saver. Replaced bad sub-service with single phase transformer. Replaced 3-phase high voltage pads. Made primary elbows, extended secondary leads
Have worked on energized 13KV, 4KV, 120/240, 120/208. 277/480.
Have worked on 34KV, 69KV (de-energized & grounded) to replace insulators and arms.
Overview
26
26
years of professional experience
1
1
Certification
Work History
Journeyman Lineman
Pepco Holdings
03.2020 - Current
Restored power to thousands of customers following severe weather events, ensuring minimal downtime for affected areas.
Constructed new power lines, contributing to the expansion and improvement of the electrical grid.
Collaborated with other linemen to complete complex projects efficiently and within specified timeframes.
Assisted in the training of apprentice linemen, sharing knowledge and expertise to develop future industry professionals.
Supported ongoing infrastructure upgrades by replacing outdated poles, wires, insulators, transformers as part of planned initiatives.
Worked on both dead and energized lines.
Performed skilled aerial work using bucket trucks and climbing gear for efficient access to high-voltage equipment.
Improved safety measures by conducting regular inspections of transmission and distribution systems.
Removed old poles and hardware and replaced with new equipment.
Contributed to positive team dynamics through clear communication, collaboration, and mutual support among fellow linemen.
Installed transformers, switches, and other components to optimize system performance and minimize disruptions.
Performed maintenance and reconducting work in varied weather conditions.
Conducted thorough assessments of storm-damaged systems for prompt repair or replacement recommendations.
Managed multiple tasks simultaneously under challenging conditions while maintaining accuracy and attention to detail in all work performed.
Prioritized safety by participating in regular team meetings, addressing potential hazards, and adhering to established procedures.
Maintained up-to-date knowledge of industry standards, regulations, and safety protocols, ensuring compliance at all times.
Ensured timely completion of assigned tasks through effective time management skills.
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Demonstrated commitment to customer satisfaction by addressing and resolving service-related issues promptly and professionally.
Streamlined workflow processes by organizing tools and materials effectively before commencing each project or task.
Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
Proved successful working within tight deadlines and a fast-paced environment.
Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
Inspected power lines for any damage or irregularities and replaced components.
Followed all safety protocols and regulations while working at height and with live electricity.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Assisted with constructing new power lines by using appropriate tools and equipment.
Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
Foreman Heavy Equipment Operator
FAM Construction
01.2019 - 12.2019
Supervise crew in a heavy highway/construction environment
Manage fuel service for heavy equipment
Lead Foreman - Concrete Pump Operator
Miller & Long Concrete Construction
01.2012 - 01.2019
Operated and ran piping system off 32, 39, and 45 Meter pumps while also performing mechanical maintenance and replacing parts, as necessary
Complied with strict safety standards issued by multiple regulatory agencies and signed procedural documentation reflecting an understanding of such standards
Trained new employees in all aspects of equipment handling, safety issues, regulatory requirements, mechanical workings and procedures, two-way radio usage, as well as mentoring post-training
Ensured safe operation of equipment
Responsible for time management of each project to insure successful completion
Communicated with contractors, homeowners and other personal to insure proper instructions and orders
Responsible for repairs and maintenance of equipment operated
Interact with contractor, foreman, inspector, cement truck driver and clients in a professional manner
Accountable for resolving unexpected issues that arise during a project
Responsible for maintaining the equipment and cleanup of each jobsite
Made calculations regarding pressure, flow, height delivered, and amount of concrete necessary for job
Monitored all hose and pump connections to check for safety and quality control
Coordinated product movement activities with other workers to ensure continuous flow of product
Recorded operating data, such as products and quantities pumped, storage tank used, gauge readings and operating time
Coordinated with subcontractors and vendors for seamless integration of materials and services into projects.
Negotiated contracts with suppliers to secure favorable terms while minimizing costs associated with materials procurement.
Performed troubleshooting procedures to diagnose malfunctions.
Conducted thorough quality control inspections to identify issues early on, preventing costly rework or delays later in the project timeline.
Residential Construction Foreman
Mars Restoration
01.2016 - 12.2018
Read blueprints, manage multi man crew & multiple jobsites