Summary
Overview
Work History
Skills
Timeline
Generic

Derek Welch

Sumas,WA

Summary

Skilled construction supervisor and carpenter with 20+ years of experience in siding, framing, and finish work. Coordinated crews, subcontractors, and deliveries to keep projects on schedule. Strong in measuring, cutting, and using power tools for accurate, clean results.

Overview

8
8
years of professional experience

Work History

Pipe Layer

Boss Construction
Bellingham, WA
06.2024 - Current
  • Installed sewer pipe and storm drainage lines to ensure effective water management for Boss Construction projects.
  • Prepared trench bottoms and graded bedding to provide stable support for pipe placement.
  • Measured pipe sections and verified alignment before backfill.
  • Connected pipe fittings and sealed joints for utility system support.
  • Operated heavy equipment for site work and efficient material handling during construction activities.

Siding Supervisor

Topside Construction
Bellingham, Washington
01.2023 - 03.2024
  • Coordinated daily crew operations at topside construction job sites, ensuring efficient workflow.
  • Facilitated subcontractor deliveries and coordinated work schedules to optimize project timelines.
  • Installed siding panels on residential and commercial exterior walls.
  • Measured and cut materials for openings and corners.
  • Removed damaged siding and prepared surfaces for installation.
  • Used levels, saws, and nailers for accurate placement.
  • Applied house wrap, flashing, and trim around exterior features.

Carpenter

Gonzalez Construction
Bellingham , WA
03.2019 - 01.2023
  • Assembled framing, partitions, and support structures for residential and commercial spaces.
  • Installed doors, windows, cabinets, and finish hardware on job sites.
  • Performed rough carpentry and finish carpentry tasks on various projects.
  • Measured and cut lumber to support framing, trim, and custom installations.
  • Used saws, drills, nailers, and other carpentry tools safely.
  • Coordinated with subcontractors and crews to streamline daily construction tasks.
  • Ensured safety and organization by maintaining cleanliness of work areas during projects. and organized across Gonzalez Construction projects.

Skills

  • Pipe installation
  • Pipe fitting
  • Drainage system installation
  • Utility installation
  • Site excavation
  • Trench preparation
  • Heavy equipment operation
  • Material handling
  • Power tool operation
  • Equipment and tools
  • Problem solving
  • Detail orientation

Timeline

Pipe Layer

Boss Construction
06.2024 - Current

Siding Supervisor

Topside Construction
01.2023 - 03.2024

Carpenter

Gonzalez Construction
03.2019 - 01.2023
Derek Welch