Summary
Overview
Work History
Education
Skills
Extracurricular Activities
Timeline
Generic

John Lee

Cordova,TN

Summary

  • I specialize in designing, implementing, and troubleshooting electrical systems for a wide range of projects. My expertise includes managing electrical installations, ensuring compliance with safety standards, and optimizing system performance. I excel in problem-solving, using advanced tools to diagnose issues and implement efficient solutions. With strong communication skills, I collaborate effectively with multidisciplinary teams to ensure project success, minimize costs, and meet deadlines. I am dedicated to driving innovation and delivering high-quality, reliable electrical solutions.

Overview

6
6
years of professional experience

Work History

Project Controls Engineer

Wooshin North America
04.2024 - Current
  • I am one of the team leaders of Wooshin at BOSK, TN, managing a bilingual team of 5 members. We specialize in facilitating communication across the field and resolving conflicts quickly.
  • I proactively track and address issues causing delays in the installation process, and ensuring timely progress using Excel.
  • I create daily reports to monitor installation progression and identify areas for optimization.
  • I review CAD drawings, identify design errors, and work to resolve them to ensure project accuracy and efficiency.
  • I also work diligently to minimize costs, specifically aiming to reduce the charges Wooshin needs to pay. I made reports

Wafer Fabrication Intern

Myongji Lab
08.2023 - 12.2023
  • Had an experience of wafer production. Implementing wafer dissection and using a transmission electron microscope (TEM) to observe its cross-section directly for errors
  • Gained hands-on experience by assisting Senior Engineers in handling and developing 4-inch wafers through photolithography, etching, and deposition
  • Collaborated with cross-sectional teams in test verification of wafers to diagnose process anomalies and deploy corrective measures
  • Fabricated inductor devices utilizing MEMs (Microelectromechanical Systems Technology)

Factory Supply Chain Engineer

DongSung Chemistry Co.
06.2019 - 09.2020
  • Implemented supply chain improvements by optimizing supply chain data flow & quality control to support the efficient operation of the factory
  • Enhanced the efficiency of TPU and Urethane material flow to align with the operational requirements of the factory
  • Managed relationships with key suppliers to ensure seamless procurement of critical materials, fostering a proactive approach to upper management and maintaining consistent production schedules

Education

Bachelor of Science - Applied Physics - Emphasis in Electronics Engineering

University of California, Davis
01.2024

Skills

  • Semiconductor Fabrication
  • Wafer Design
  • Circuit Design
  • Electrical Troubleshooting
  • EV battery manufacture installation
  • Mitsubishi PLC control
  • proficient in PowerPoint, Excel
  • Fluent Korean, and English Speaker

Extracurricular Activities

Institute of Electrical Engineers (IEEE), Davis, CA, 09/01/22, Present

Timeline

Project Controls Engineer

Wooshin North America
04.2024 - Current

Wafer Fabrication Intern

Myongji Lab
08.2023 - 12.2023

Factory Supply Chain Engineer

DongSung Chemistry Co.
06.2019 - 09.2020

Bachelor of Science - Applied Physics - Emphasis in Electronics Engineering

University of California, Davis
John Lee