Summary
Overview
Work History
Education
Skills
Timeline
Generic

Donte Addison

Crystal River,Florida

Summary

Hardworking Pipe Layer with safety-driven mentality in hazardous and benign environments. Personable employee with over 4 years of assembling pipes and laying out pipe routes. Skilled applying general rules to identify and solve problems. Efficient Pipelayer with over 6 years of experience. Skilled in digging trenches by hand and operating heavy machinery such as backhoes. Frequently acknowledged for productive employee training.

Overview

2
2
years of professional experience

Work History

Lead Man

PC Construction
06.2023 - 09.2023
  • Trained and mentored new employees to enable safe and efficient job performance.
  • Followed applicable safety and health policies and procedures to promote crew safety and minimize accidents.
  • Checked equipment to determine if maintenance was required.
  • Performed safety and environmental health observations and notified management of non-compliance issues to promote safe working conditions.
  • Confirmed that finished products met internal and external requirements to promote uniform quality standard.
  • Managed work site operations to facilitate adherence to predetermined production schedules.

Laborer

Gardners Concrete
09.2022 - 03.2023
  • Worked alongside team to accomplish work goals according to schedule.
  • Understood and followed verbal and written instructions to complete work correctly.
  • Maintained organized and clean work areas at all times on job sites.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Prepared job sites by removing debris and setting up materials and tools.
  • Organized materials, tools, and equipment to supply team members.
  • Utilized construction tools and machinery to effectively complete job site projects.
  • Followed proper equipment operation and maintenance procedures to keep equipment in good working condition.
  • Used measuring tools such as gauges and tape measure to identify conforming parts during production.
  • Identified and reported hazards on job sites to prevent accidents and injuries.
  • Observed site safety rules to maximize protections for team members and equipment.
  • Dug trenches, ditches and holes to allow for utility, water and sewer installation and proper foundation for structures.
  • Assembled and disassembled formwork to facilitate correct shaping and pouring of concrete.
  • Operated bulldozers, excavators and cranes to facilitate precise excavation and grading.
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials onto trucks and trailers.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Cleaned and maintained tools, equipment and worksites.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.

Pipe Layer

GWP Construction
11.2021 - 08.2022
  • Assembled and installed underground pipe, fittings and valves of various sizes.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Checked and tested underground gas lines and pipes to verify proper functionality.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Read and understood drawings, written instructions and blueprints to plan work and layout pipe.
  • Graded or leveled trench bases using tamping machines or hand tools.
  • Followed plans to locate existing utilities prior to digging and flagged locations for operators.
  • Carried out day-day-day duties accurately and efficiently.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Worked flexible hours; night, weekend, and holiday shifts.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Performed duties in accordance with applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Assembled and installed underground pipe, fittings and valves of various sizes
  • Observed all safety measures and company equipment policies to prevent job site accidents
  • Used equipment such as rollers, dump trucks and front-end loaders to move important supplies
  • Covered completed pipes with earth or materials and prepared sites for grading
  • Proven ability to learn quickly and adapt to new situations
  • Self-motivated, with a strong sense of personal responsibility
  • Worked well in a team setting, providing support and guidance
  • Managed time efficiently in order to complete all tasks within deadlines
  • Demonstrated respect, friendliness and willingness to help wherever needed
  • Excellent communication skills, both verbal and written
  • Passionate about learning and committed to continual improvement
  • Proved successful working within tight deadlines and a fast-paced environment
  • Strengthened communication skills through regular interactions with others
  • Organized and detail-oriented with a strong work ethic
  • Adaptable and proficient in learning new concepts quickly and efficiently
  • Used critical thinking to break down problems, evaluate solutions and make decisions
  • Paid attention to detail while completing assignments
  • Worked flexible hours across night, weekend and holiday shifts

Education

Brandon High School
Brandon, FL

Skills

  • Water and Sewer Piping
  • Training Junior Team Members
  • Joint Sealing
  • Drain Cleaning
  • Safe Work Practices
  • Pipe Measuring and Cutting
  • Accurate Measurements
  • Commercial Projects
  • Construction Operations
  • Digging Trenches
  • Maintaining Clean Work Areas
  • Backhoe Operation
  • Pipefitting

Timeline

Lead Man

PC Construction
06.2023 - 09.2023

Laborer

Gardners Concrete
09.2022 - 03.2023

Pipe Layer

GWP Construction
11.2021 - 08.2022

Brandon High School
Donte Addison