Achieved enhanced instrument performance through diligent maintenance and calibration efforts.,Realized personal growth by actively seeking knowledge and training opportunities.,Facilitated team learning experiences to boost overall technical competence.
Work History
Instrument Technician
1 Year
Zachery Industrial | 08.2025 - Current
Calibrated and maintained instrumentation systems to ensure optimal performance and compliance with industry standards.
Diagnosed and resolved instrumentation issues, improving system reliability and minimizing downtime.
Conducted routine inspections of control systems, identifying areas for improvement and ensuring accurate readings.
Developed documentation for maintenance procedures, streamlining training and knowledge sharing among team members.
Troubleshot complex electrical circuits used in industrial automation environments, restoring functionality promptly.
Instrument Technician
7 Months
Scale And Change | 01.2025 - 08.2025
Read and understand new project packages, such as directions, electrical drawings, detail drawings, loops sheets, specification sheets, demo drawings.
Shoot loops with the smart communicator and commission new systems.
Bench Testing, Pressure Switches, Valves and Transmitters.
Transmitter Calibrations (Honeywell and Rosemount).
Troubleshooting discrete and analog signals using loop drawings
Read and understand new project packages, such as directions, P&IDS, Instrumentation drawings, detailed drawings, loop sheets, specification sheets, one line diagram, demo drawings.
Instrument Technician
4 Months
Burrow Global | 09.2024 - 01.2025
Diagnose and repair 4-20 mA loop issues, including signal instability, grounding, and input/output faults.
Troubleshoot and resolve issues with positioners (Flowserve D3, RS100, P30A) ensuring proper valve operation and fail-safe configuration.
Configured, calibrated, and troubleshot wireless transmitters to ensure correct process data transmission
Commissioned and maintained Scheiner Wireless instruments for remote monitoring and control.
Electrical Top Helper
5 Months
Traid Electric & Control | 04.2024 - 09.2024
Fabricate and install tubing, conduit, cable tray.
Pull wire through cable tray and conduit with the use of man lifts, and scissors lifts.
Assisted Journeyman electrician by performing various tasks, such as operating drill, threader, saws
Electrical Apprentice
4 Months
Bayou Electric | 11.2023 - 03.2024
Operated hand bender and electric bender to shape materials accurately.
Completed rough-in termination and underground installations efficiently.
Fabricated and installed conduit and cable tray to specifications.
Assisted in pulling wire through conduit utilizing man lifts and scissors lifts.
Worked with Plasti-Bond pipe for various installations.
Installed underground PBC pipe as part of infrastructure development.
Electrical Apprentice
10 Months
K&S | 01.2023 - 11.2023
Fabricate and install tubing, conduit, cable tray.
Through cable tray and conduit with the use of man lifts, and scissors lifts.
Assisted Journeyman electrician by performing various tasks, such as operating drill, threader, saws
Demo old conduit and wiring and re-route as shown in the drawings. Measured, cut, threaded and installed new conduit