With over 26 years of experience as a project engineer and project manager, specializing in process design and construction of municipal and industrial water & wastewater treatment facilities, as well as retooling automotive assembly systems. Excels in preparing basis of design, plans, and specifications, overseeing bid letting, managing construction, administering contracts, and ensuring successful commissioning. Expertise also extends to troubleshooting and process optimization. Highly skilled in efficiently managing project timelines, resources, and stakeholder communications. Tackles project challenges head-on to ensure smooth execution by implementing project management best practices, consistently delivering high-quality outcomes.

Overview

2025
2025
years of professional experience

Work History

Project Coordinator

Ford-Essex Engine Plant
  • As Project Coordinator for the mechanical services, OEM equipment installations, electrical duct-bus feed, on the FEEP Blockline project which includes oil separation, flushing systems, mist diffusers
  • Equipment installation and service connections for Gehring bore honing, CNC, gantry’s, bridge cranes
  • Deliverables included product approvals, equipment coordination, layout drawings, PFDs, P&IDs, instrument lists, valve lists, and BIM modelling

Lead Project Coordinator

Herb Gray Parkway Lift Stations
  • Company Overview: Ontario Ministry of Transportation
  • Lead Project Coordinator for mechanical and electrical installations at five 10MG Storm Water Lift Stations
  • Each site included four 300-400hp submersible pumps, motor control center, SCADA, switchgear and stand-by generators
  • Ontario Ministry of Transportation

Project Coordinator

Fiat-Chrysler Automobile
  • Over 16 week continuous period as Project Coordinator for mechanical service connections and retooling of the assembly line, Edward was responsible to update and report daily progress and coordinate manpower, as well as integrate with other trades on a daily basis to meet strict launch milestones for validation testing and assembly commissioning

Site Project Engineer

City of Ann Arbor
  • As Site Project Engineer was responsible to support integrated construction phases with Plant Operations and commissioning of the Solids Handling Building Rehabilitation, including new process equipment such as belt presses, clarifiers, centrifuges, conveyors, hoppers, solids truck loading building and UV disinfection

Process Engineer

City of Detroit (DWSD)
  • As Process Engineer consulting DWSD, Edward supported the preparation and oversight for Design-Build Contracts at two Water Treatment Plants for the addition of new 12MG and 8MG Residual Handling Facilities at Lake Huron WTP and Southwest WTP respectively
  • Residual Treatment processes included equalization tanks, chain and flight sludge collectors, inclined plate separators, centrifuges, chemical dosing systems, conveyors, hoppers, truck loading areas
  • Along with supporting MDEQ permit applications, the Lake Huron WTP project required a three-mile 60-inch diameter outfall

Project Manager

VW-Scout
- Current
  • Currently as UPI Project Manager within the process engineering group and construction team from design through commissioning for the industrial wastewater treatment plant located at the new Scout Paint Shop
  • The new processes include Batch Tanks, Incline Plate Clarifier, Filter Press and Chemical Dosing systems

UPI Project Manager

GM-Lake Orion
- Current
  • As the UPI Project Manager for procurement, installation and commissioning of chemical dosing systems, filter bag equipment, clarifier drive rehabilitation, grit transfer pumps, filter press equipment

UPI Project Manager

GM-Spring Hill
- Current
  • As the UPI Project Manager for customized rigging and installation of 3300Ton Carrier Chiller

UPI Project Manager

GM-Spring Hill
- Current
  • As the UPI Project Manager for procurement and installation of chemical feed systems
  • Oversee installation of filter presses

UPI Project Manager

GM-Ramos-Arizpe
- Current
  • As UPI Project Manager within the process engineering group and construction team from design through commissioning for civil, structural, mechanical and electrical upgrades at the industrial wastewater treatment plant located at GM-Ramos-Arizpe Assembly Plant
  • The new processes at the facility include Ultrafiltration, 4000 m3 Equalization Systems, Clarifier, Membrane Bioreactors, Reverse Osmosis, Filter Press and Chemical Dosing systems

Education

B.S. - Civil Engineering

Lawrence Technological University
01.1998

Skills

  • Analytical Problem-Solving
  • Project Management
  • Strong Deadline Adherence
  • Strong Detail Orientation

Industry

Water and Wastewater Treatment Design & Construction

Membershipsandcertificates

  • AWWA-Michigan
  • Construction Specifiers Inst- Contract Administration
  • Ontario Infrastructures H&S Association
  • OSHA Safety Awareness MUST Program

Legalname

Edward Callegari, CCA

Fax

[Fax]

Yearsofexperience

26

Timeline

Project Coordinator

Ford-Essex Engine Plant

Lead Project Coordinator

Herb Gray Parkway Lift Stations

Project Coordinator

Fiat-Chrysler Automobile

Site Project Engineer

City of Ann Arbor

Process Engineer

City of Detroit (DWSD)

Project Manager

VW-Scout
- Current

UPI Project Manager

GM-Lake Orion
- Current

UPI Project Manager

GM-Spring Hill
- Current

UPI Project Manager

GM-Spring Hill
- Current

UPI Project Manager

GM-Ramos-Arizpe
- Current

B.S. - Civil Engineering

Lawrence Technological University
Edward Callegari