A dedicated and detail-oriented bilingual professional with a proven track record in developing, designing, engineering, together with managing the construction of complex power distribution, as well as fiber optic telecommunications networks nationwide. Seeking to leverage 10 years of experience, innovation, integrity, and hard work contributing to infrastructure improvement projects, including renewable energy integration, smart grid builds, storm hardening, rural utilities progression and modernization.

Overview

19
19
years of professional experience

Work History

Grid Modernization / Power Distribution / Telecommunications

ECM Enterprises
Nationwide
01.2013 - Current
  • Supported federally funded multi-million-dollar infrastructure improvement projects nationwide
  • Collaborated in the rollout of fiber optic telecommunications, power distribution and alternative energy innovations from inception to completion in many markets
  • Designed and engineered new power and telecommunications outside plant for large utility companies, including attachments
  • Conducted extensive field data collections, pole ownership investigations, GIS mapping, and assessments for third-party attachments
  • Performing Make-Ready Engineering designs for public electric utilities and telecommunication companies
  • Oversaw outside plant construction activities for overhead and underground Power and Telecommunications facilities
  • Presided over quality control & field inspections, assured that contractors, vendors, tradesmen, and excavators completed work orders to client specifications with safety being top priority
  • Created bore-logs during underground facility construction and guaranteed conduit proofing
  • Approved and signed off on punch list walkouts
  • Evaluated work order designs and made change recommendations when needed for cost/time effectiveness
  • Organized and executed Maintenance of Traffic setups, and safe work areas for workers
  • Arranged safety meetings daily
  • Attested that public or privately- owned properties, right of way and easements were restored satisfactorily after construction
  • Visually Inspected poles for readiness to attach & ensured that pole transfers and pole replacements have been completed.
  • Assisted in the design and installation of new systems, incorporating cutting-edge technology for improved reliability and efficiency.
  • Collaborated with engineering teams to develop innovative solutions for power distribution challenges.
  • Facilitated cross-functional collaboration among departments, promoting a cohesive working environment that fostered innovation and maximized results.
  • Conducted regular risk assessments as part of a proactive approach to mitigating potential issues before they escalated into costly problems.
  • Established robust contingency plans, ensuring seamless continuity of power supply under varying conditions and external challenges.
  • Implemented safety protocols, reducing workplace accidents and improving overall employee wellbeing.
  • Coordinated with regulatory agencies to ensure adherence to industry standards and best practices.
  • Evaluated existing infrastructure for potential upgrades or replacement opportunities, optimizing asset utilization throughout their lifecycles.
  • Oversaw multiple simultaneous projects, balancing resources efficiently while meeting deadlines consistently.
  • Managed budgets effectively, ensuring timely completion of projects without compromising on quality or safety standards.
  • Delivered comprehensive progress reports to senior management regularly outlining key performance metrics along with recommendations for continuous improvement.
  • Maintained fully compliant operations in line with standards, established requirements and safety procedures.
  • Calculated load estimates and equipment requirements to determine required control settings.
  • Assigned tasks to team members based upon individual strengths and experience, realizing productivity and workflow improvements.
  • Mentored junior staff members, fostering professional development and enhancing team capabilities.
  • Analyzed customer feedback to identify areas for improvement in service delivery and satisfaction levels.
  • Developed strong relationships with suppliers, securing high-quality materials at competitive prices.

Senior Infrastructure Engineer

Bechtel Corporation
Frederick, MD
01.2015 - 12.2016
  • Designed fiber networks from central office to end-user, including feeder and distribution fibers for Google’s FTTP project
  • Analyzed residential and business units to determine the required size of new fiber hubs and cables
  • Selected fiber cable routes and locations for fiber hubs and terminals, initiated work authorization requests, and managed approval processes.
  • Collaborated with cross-functional teams to design, develop, and deploy scalable infrastructure solutions.
  • Developed comprehensive documentation on infrastructure architecture, processes, and procedures for easy reference by colleagues and stakeholders.
  • Managed vendor relationships to ensure timely delivery of services and products necessary for infrastructure projects.
  • Conducted thorough risk assessments on proposed infrastructure changes, mitigating potential negative impacts before implementation.
  • Designed cost-effective solutions by researching options and selecting the most appropriate components for each project''s specific requirements.
  • Established positive relationships with vendors and suppliers, negotiating favorable contracts that supported business objectives.
  • Managed complex projects involving multiple stakeholders, ensuring successful deployment of telecommunications infrastructure.
  • Interpreted electrical schematics and design documents for system installation and build-out.
  • Mentored junior engineers, fostering a culture of continuous learning and professional development within the team.
  • Performed network modeling and analysis.
  • Maintained documentation for telecommunication systems, equipment inventory and floor plans.
  • Optimized network capacity by conducting thorough analyses and identifying opportunities for improvement.
  • Spearheaded quality assurance initiatives to identify areas requiring attention, implement corrective measures promptly.
  • Conducted comprehensive site surveys, resulting in accurate documentation and planning for future installations.
  • Followed standards and procedures to maintain safe work environment.
  • Developed cost estimates for system and component implementation and operation.
  • Used software to prepare and evaluate network diagrams, floor plans and site configurations for both new and existing facilities.

Verizon Fiber Construction Project RJE, Lewisberry

03.2012 - Current
  • Survey and collected pole owner data, and equipment’s conditions, made attachment recommendations based on fielding data
  • Measured poles, attachments, and mid-span heights, identifying all utilities attached.

Atlantic Engineering, Kansas City

12.2010 - Current
  • Conducted feasibility studies, route engineering, and fielding
  • Measured and surveyed poles, created GIS-based pole profiles, and interfaced with utility companies.

One Community Fiber LLC, Columbus

02.2010 - Current
  • Performed site surveying, utility verifications, and feasibility studies for an aerial and underground fiber optic cable route project
  • Monitored construction activities as a quality inspector
  • Directed and organized multiple contactors and vendors.

AT&T Dark Fiber Expansion, Pennsylvania

02.2008 - Current
  • Supported the construction of a 1900-mile OSP long haul fiber optic backbone across the state of Pennsylvania
  • Inspected conduit line construction, and documented construction activities
  • Developed detailed construction and permit drawings, site acquisition and site design, and drawings packages to meet aggressive schedules.

ELM Locating, Florida

10.2005 - Current
  • Helped save millions of dollars for utility owners from damages due to excavations
  • Located and identified buried utilities using ground-penetrating radar and radio detection equipment
  • Responded to 811 locate requests and ensured accurate marking and documentation to prevent utility damage.

Education

Bachelor of Arts -

Cumberland County College
Vineland, NJ

Skills

  • Project Management
  • Construction Oversight
  • Leadership and Administration
  • Interpersonal Communications
  • Cost Estimating and Budgeting
  • Transmission & Distribution
  • Telecommunications
  • Fiber Optic Networks
  • Electrical Engineering
  • Smart Grid Solutions
  • Planning & Feasibility Studies
  • Pole & Wind Loading Evaluation
  • Renewable Energy Integrations
  • Field Engineering & Operations
  • Storm Hardening
  • Electrical System Design
  • Asset Management
  • Fault analysis
  • Stakeholder Communication
  • Energy management systems
  • Workforce Supervision
  • Power distribution planning
  • Safety Procedures
  • System monitoring
  • Job Planning
  • Electrical Systems
  • Equipment Inspection
  • Performance Analysis
  • Regulatory Requirements
  • Customer service skills
  • Troubleshooting skills
  • Equipment Operation
  • Customer Relations
  • Data Documentation
  • Order Preparation
  • Equipment monitoring
  • Workforce Management
  • Data Tracking
  • Wiring diagrams
  • Electrical diagrams
  • Routine Maintenance
  • Power Quality Analysis

Languages

Spanish
Native or Bilingual

Timeline

Senior Infrastructure Engineer

Bechtel Corporation
01.2015 - 12.2016

Grid Modernization / Power Distribution / Telecommunications

ECM Enterprises
01.2013 - Current

Verizon Fiber Construction Project RJE, Lewisberry

03.2012 - Current

Atlantic Engineering, Kansas City

12.2010 - Current

One Community Fiber LLC, Columbus

02.2010 - Current

AT&T Dark Fiber Expansion, Pennsylvania

02.2008 - Current

ELM Locating, Florida

10.2005 - Current

Bachelor of Arts -

Cumberland County College
Emilio Mujica