PROFESSIONAL SUMMARY
Overview
Work History
Education
Skills
Certification
LANGUAGES
Timeline

ENDER JOSE CHIRINOS SANCHEZ

TechnipFMC
Midland,TX
2
Languages
1
Certification
8
years of professional experience

Field Service Technician with 5+ years of oilfield experience installing, testing, troubleshooting, and repairing wellhead and related equipment at rig and well locations, backed by a hands-on electrical and control-systems background. Safety-focused, works independently with minimal supervision, and communicates directly with customers. Bilingual in English and Spanish.

Work History

Field Service Technician II

2 Years 9 Months
TechnipFMC | 02.2024 - Current
  • Install, test, and repair new and reworked equipment and tooling in onshore and offshore field environments with limited supervision
  • Operate a company vehicle and maintain truck inventory of tools, equipment, spare parts, and materials, verifying function-fit and readiness before every job
  • Communicated with customer representatives to clarify procedures and equipment requirements, ensuring alignment with safety standards and timely project completion
  • Troubleshot equipment issues in the field, documenting quality and procedural defects for Service Management to facilitate continuous improvement
  • Recorded technical data (dimensions, weights, pressures, temperatures, flow rates) and completed field documentation to maintain accurate project records and compliance
  • Prepare safety documentation and follow HSE procedures in demanding field conditions with extended hours and travel

Field Service Technician I (Wellhead)

2 Years 7 Months
Cameron International | 01.2021 - 08.2023
  • Installed, tested, troubleshot, and repaired wellheads and valves per equipment specifications at rig and well locations
  • Installed wellhead systems, X-Trees, and manifolds, including casing heads, tubing heads, and 9 5/8" and 5 1/2" hangers and pack-offs
  • Inspected and assessed conventional wellheads and gate valves, ensuring compliance with quality and safety standards
  • Operated dry rod, side door lubricator, and HYTORC equipment to facilitate efficient wellhead service operations
  • Guided customers through repair and replacement decisions to ensure optimal equipment performance. on repair and replacement options and costs for standard products
  • Communicated problems and issues to the job site leader and stayed current on HSE requirements for Cameron and its customers

Electrician's Assistant

3 Months
Amteck, LLC | 10.2020 - 01.2021
  • Ran EMT and conduit (1/2", 3/4", 1", 1-1/4") and installed and connected switches and receptacles
  • Pulled wire, installed panels, and ran low and high voltage cable from electrical boards to boxes
  • Assisted with mounting fixtures, outlets, switches, and electrical components according to specifications.
  • Measured, cut, and assembled wire, cable, and conduit using hand and power tools.

Electrician's Assistant

1 Year 7 Months
Penco | 03.2019 - 10.2020
  • Installed low and high voltage cable from electrical boards to boxes, ensuring reliable connection for emergency and standard electrical fixtures
  • Installed and connected EMT and conduit (1/2", 3/4", 1", 1-1/4") for switches and receptacles, facilitating efficient electrical distribution
  • Inspected work for alignment, cleanliness, and installation accuracy before final turnover.
  • Maintained safe work practices by following lockout, PPE, and site safety procedures.

Electrician's Assistant

2 Months
Penco | 01.2019 - 03.2019
  • Installed EPS switches and emergency/standard lighting, receptacles, switches, and motion sensors to enhance light control and safety
  • Bent and installed EMT and conduit (1/2", 3/4", 1", 1-1/4") for efficient electrical routing in various projects
  • Supported electricians with conduit installation, wire pulls, and panel preparations on commercial job sites.
  • Organized tools, materials, and supplies to keep work areas stocked and production-ready.

Control Electrician

2 Months
Carolina Power | 11.2018 - 01.2019
  • Wired, connected, and loop-tested control panels for freezer, chiller, and A/C equipment to ensure optimal performance and reliability
  • Commissioned temperature controls for two ammonia pumps and automated controls for compressor room gates, enhancing operational efficiency
  • Installed temperature controls for piping in water plant and maintained steam tank level control loop transmitter, supporting system regulation and safety

Education

Bachelor of Mechanical Engineering - Mechanical Engineer (Ingeniero Mecánico)

UNERMB | Venezuela | 2026

High School Diploma - Bachiller

Instituto Simón Bolívar | Venezuela | 09.2015

Skills

Field operations
Wellhead installation
testing and repair
Troubleshooting
Electrical systems and control loops
Low and high voltage wiring
HSE compliance
PPE compliance
Customer communication
Truck inventory management
Hand and power tools
HYTORC
Dry rod
Side door lubricator
Casing head and tubing head installation
Hanger and pack-off installation
Maintenance and repair

Certification

  • H2S Awareness
  • Confined Space Entry
  • Rig Pass
  • SafeLand USA

LANGUAGES

English (professional working proficiency)
Spanish (native)

Timeline

Field Service Technician II

TechnipFMC
02.2024 - CurrentRead More

Field Service Technician I (Wellhead)

Cameron International
01.2021 - 08.2023Read More

Electrician's Assistant

Amteck, LLC
10.2020 - 01.2021Read More

Electrician's Assistant

Penco
03.2019 - 10.2020Read More

Electrician's Assistant

Penco
01.2019 - 03.2019Read More

Control Electrician

Carolina Power
11.2018 - 01.2019Read More

Instituto Simón Bolívar

High School Diploma from Bachiller
Read More

UNERMB

Bachelor of Mechanical Engineering from Mechanical Engineer (Ingeniero Mecánico)
Read More
ENDER JOSE CHIRINOS SANCHEZ