Summary
Overview
Work History
Education
Skills
PERSONEL INFORMATIONS
Languages
References
Timeline
Generic

Eren Ege

Williamsville,ny

Summary

Proactive Site Manager offers 10 years of cultivating productive and safe working environments. Well-versed in resource allocation, project management and site safety inspections. Successful career coordinating crews.

Overview

11
11
years of professional experience

Work History

Site Manager (Moglice HEPP)

GES ALBANIA Sh.p.k.
Gramsh, ALBANIA
09.2017 - 12.2020

Customer: Devol Hydropower (Statkraft)
Contractor: Comelex Albania (GE Renewable Energy)
Subcontractor: GES Albania Sh.p.k.
Scope of the Contract: Erection of Devol Moglice HEPP(2x104,5 MVA) Electromechanical Package consists of

  • Two Vertical Generators
  • Two Vertical Francis Turbines,
  • Two Inlet Valves,
  • Related BOP & eBOP

Job Description

  • Controlling and ensuring technical safety rules and establishing HSE culture within the site team
  • Supervised work processes and adherence to project schedule
  • Developed team communications and information for daily meetings
  • Provided general office administration, including correspondence, filing and spreadsheet development
  • Interviewed, hired and trained new workers.
  • Assumed responsibility for personnel deployed to work site.
  • Created weekly reports and presentation for management team ( with progress data and plots)

Goals

  • Completed project on time.
  • Maintained zero site accidents and lost work days
  • Succeeded with good results on EHS Audits

QA/QC ENGINEER & TEST PACK COORDINATOR

Ayson Geotechnical And Marine Construction
İzmir, Turkey
12.2016 - 08.2017

Customer: SOCAR

Contractor: TSGI

Subcontractor: Doğuş-ES

Scope of the Contract: Star Refinery Marine Works (Marine Civil Works, Under deck piping, Marine mechanical equipment installations)

Job Description

  • Ensured Quality Control Plan on site activities
  • Notified to contractor for each site ans shop inspections
  • Ensured NDE coverages
  • Documentation of quality activities
  • Ensured quality standards and procedures to minimize deviations and maximize customer satisfaction.

Goal

  • Prepared test packs in accordance with site application without causing delay, obtaining engineering and quality approvals.

TURBINE SITE ENGINEER (BANJA HEPP 70,4 MW)

Enbi Power. Sh.p.k.
Elbasan, ALBANIA
05.2015 - 11.2016

Customer: Devol Hydropower (Statkraft)

Contractor: GE Renewable Energy

Subcontractor: EnBi Power Sh.p.k.

Scope of the Contract: Erection of Devol Banja HEPP(63,4 + 7 MW) Electromechanical Package consists of

  • Two Vertical Generators, one Horizontal Generator
  • Two Vertical Francis Turbines, one horizontal Francis Turbine
  • Three Inlet Valves,
  • Related BOP & eBOP

Job Description:

  • Prepared accurate specifications for purchase of consumables and erection tools for purchasing department
  • Documentation(Welders certification, welding book, Method statement)
  • Supervise to site erection teams
  • Manpower planning
  • Daily, weekly and monthly bases planning,
  • Delivered necessary technical documents to the site erection teams in advance
  • Plans, coordinates, and directs erection activities with the daily operation of the power plant
  • Implements site safety program

Goals:

  • Completed project on the time

SITE MANAGER (ASLASPAN II HEPP 280 MW)

GES Genel Elektrik Sistemleri A.Ş.
Muş, TURKEY
09.2014 - 04.2015

Customer: Enerjisa

Contractor: Alstom&GES Consortium

Subcontractor: GES Genel Elektrik Sistemleri

Scope of the Contract: Erection and commisioning of Alpaslan II HEPP (2x116,73 MW 2x31,33 MW) Electromechanical Package consists of

  • Four Vertical Generators
  • Four Vertical Francis Turbines,
  • Four Inlet Valves,
  • Related BOP & eBOP

Job Description:

  • General coordination of Power Plant site erection activities,
  • Created safe work environment by complying with safety, health and security requirements.
  • Developed team communications and information for daily meetings
  • Prepared accurate specifications for purchase of consumables and erection tools for purchasing department
  • Due to suspension of the project by client, site is earlier demobilized

Goal:

  • Maintained zero site accidents and lost work days
  • Improved operations through consistent hard work and dedication.

SITE MANAGER (ARKUN HEPP 245 MW)

GES Genel Elektrik Sistemleri A.Ş.
Artvin, TURKEY
03.2012 - 08.2014

Customer: Enerjisa

Contractor: Alstom&GES Consortium

Scope of the Contract: Erection and commissioning of Enerjisa Arkun HEPP (3x78 MW + 2x6 MW) Electromechanical Package consists of:

  • Three Vertical Generators (fully assembled at site),
  • two Horizontal Generators (packed units)
  • Three Vertical Francis Turbines (fully assembled at site),
  • two Horizontal Francis Turbines (packed units)
  • Five Inlet Valves,
  • Related BOP & eBOP

Job Description:

  • General coordination of Power Plant site erection activities,
  • Controlling and ensuring technical safety rules and establishing HSE culture within the site team
  • Developed team communications and information for daily meetings
  • Assumed responsibility for personnel deployed to work site.
  • Used coordination and planning skills to achieve results according to schedule.
  • Improved operations through consistent hard work and dedication.

Goals:

  • An early completed project and has been awarded a bonus payment from the client

SITE MANAGER (MENGE HEPP 89,4 MW)

GES Genel Elektrik Sistemleri
Adana, TURKEY
06.2010 - 03.2012

Customer: Enerjisa

Contractor: Alstom&GES Consortium

Scope of the Contract: Erection and commissioning of Enerjisa Menge HEPP (2x47,22 MVA) Electromechanical Package consists of:

  • Two Vertical Generators (fully assembled at site),
  • Two Vertical Francis Turbines (distributor assembled at workshop),
  • Two Inlet Valves,
  • Related BOP & eBOP

Job Description

  • Worked closely with Alstom Site Manager to maintain optimum levels of communication to effectively and efficiently complete projects. Reporting each site activities to the management
  • Monitored safety of all construction activities, making on-site personnel safety top priority
  • Led and managed resolution of all issues during project construction and commissioning phases
  • Prepared accurate specifications for purchase of erection tools and consumables
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Developed team communications and information for meetings.

Goals

  • Completed project on the time.

SITE ENGINEER (Yedigöze HEPP 2x158,5 MW)

GES Genel Elektrik Sistemleri A.Ş.
Adana, TURKEY
04.2010 - 06.2010

Customer: Sanko

Contractor: Alstom

Scope of the Contract: Electro-mechanical installation of Yedigöze HEPP

  • Two Vertical Generators (fully assembled at site),
  • Two Vertical Francis Turbines (fully assembled at site),
  • Two Inlet Valves,
  • Related BOP & eBOP

Job Description

  • Recorded daily events and activities in site logbook to evaluate process and improve productivity
  • Material transport organizations to powerhouse from warehouse.
  • Open box control in advance, organized materials, tools and equipment to supply team members
  • Bottom ring, runner, head cover, operating ring, wicket gates, shaft, governor, cooling system installations.
  • Read and understood plans and technical documentation for each job.
  • Enhanced team efficiency and multitasking abilities by effectively using hand tools, power tools and equipment.
  • Supervised work of contracted employees to keep on task for timely completion.

SITE ENGINEER (Menge HEPP 89,4 MW)

GES Genel Elektrik Sistemleri A.Ş.
Adana, TURKEY
01.2010 - 03.2010

Adana, TURKEY 12/2009 - 03/2010
Customer: Enerjisa
Contractor: Alstom&GES Consortium
Scope of the Work: Turbine embedded parts installation

Work Descriptions:

  • Organized materials, tools and equipment to supply team members.
  • Embedded part installation planning and execution on parallel of civil works.
  • Hydro testing of embedded pipes.
  • Closely monitored coworkers, lifting tasks and construction areas to minimize safety accidents and maximize productivity.
  • Recorded daily events and activities in site logbook to evaluate process and improve productivity.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.

SITE ENGINEER (Seyrantepe HEPP)

GES Genel Elektrik Sistemleri A.Ş
Elazığ, TURKEY
12.2009 - 01.2010

Customer: Limak-Bilgin Energy
Contractor: Alstom Renewable

Scope of the Work: Maintenance of turbine mechanical parts and revision on the turbine servomotor

Work Description

  • Reinforced turbine servomotor housing on the operating ring
  • Manufactured pipes with new route.

PRODUCTION ENGINEER

SIMECO
İZMİR, TURKEY
09.2008 - 05.2009

Work Description

  • Assembling premium quality built-in cooking appliances
  • Supplied raw material according to MRP results and planning to produce semi-finished material
  • Providing solutions with quick response times in flexible production line
  • Determining the need of semi-finished materials required for assembly on time and providing the necessary supply

Education

Bachelor of Science - Welding Engineering

GSI SLV München
TURKEY
10.2009

Bachelor of Science - Mechanical Engineering

9 September Universty
TURKEY
02.2007

Skills

  • Construction management
  • Knowledgeable in construction safety
  • Staff Management
  • On-site inspections
  • Technical Knowledge
  • Able To Travel
  • Leadership Experience

PERSONEL INFORMATIONS

Nationality: Albanian & Turkish

Place of Birth: Ankara
Date of Birth: 20/07/1984
Sex: Male
Status: Married
Hobbies: Cycling

Languages

Turkish: Native

English: fluently

German: intermediate (Goethe B1 Zertifikate: 09.07.2021)

Albanian: Beginner

References

Ali Onat

System Integrator/Ge

Canada

+1 (514) 210-5692

Timeline

Site Manager (Moglice HEPP)

GES ALBANIA Sh.p.k.
09.2017 - 12.2020

QA/QC ENGINEER & TEST PACK COORDINATOR

Ayson Geotechnical And Marine Construction
12.2016 - 08.2017

TURBINE SITE ENGINEER (BANJA HEPP 70,4 MW)

Enbi Power. Sh.p.k.
05.2015 - 11.2016

SITE MANAGER (ASLASPAN II HEPP 280 MW)

GES Genel Elektrik Sistemleri A.Ş.
09.2014 - 04.2015

SITE MANAGER (ARKUN HEPP 245 MW)

GES Genel Elektrik Sistemleri A.Ş.
03.2012 - 08.2014

SITE MANAGER (MENGE HEPP 89,4 MW)

GES Genel Elektrik Sistemleri
06.2010 - 03.2012

SITE ENGINEER (Yedigöze HEPP 2x158,5 MW)

GES Genel Elektrik Sistemleri A.Ş.
04.2010 - 06.2010

SITE ENGINEER (Menge HEPP 89,4 MW)

GES Genel Elektrik Sistemleri A.Ş.
01.2010 - 03.2010

SITE ENGINEER (Seyrantepe HEPP)

GES Genel Elektrik Sistemleri A.Ş
12.2009 - 01.2010

PRODUCTION ENGINEER

SIMECO
09.2008 - 05.2009

Bachelor of Science - Welding Engineering

GSI SLV München

Bachelor of Science - Mechanical Engineering

9 September Universty
Eren Ege