Summary
Overview
Work History
Education
Skills
Timeline
Generic

Eric Martin

Elkmont,AL

Summary

Secure a position that can utilize extensive experience, and training in the Electrical field and to make a significant contribution towards the success of employer,18 years of electrical experience, 9 of those years in management, Managed projects for Pharmaceutical Plant, Nuclear Plants projects from 1.5 million to 84 million-dollar projects, help provide overall supervision, coordination, and performance of project trade disciplines in accordance with each subcontractor's and vendor's contractual requirements. Daily responsibilities include project design and constructability coordination, safety management, scheduling, managing/ expediting material, and equipment deliveries, and providing quality control assurance. Proven skills in leading, overseeing and maintaining reliable, cost-effective, and safe biomass plant operations. Knowledgeable about regulatory requirements governing power generation and strategies for improving output and efficiency. Effective at developing and implementing policies, procedures and plans to strengthen facility operations. Outstanding blueprint and design interpretation and comprehension abilities with excellent communication, budgeting and project management talents. Extensive knowledge of all construction sub-trades, construction materials and supplies.

Overview

14
14
years of professional experience

Work History

I&E Construction Superintendent

Daikin America
11.2021 - Current
  • Scheduled subcontractors, consultants and vendors to coordinate completion of jobs and tasks.
  • Currently managing 8-10 projects
  • Supervised field crews to maximize quality and work efficiency.
  • Coordinated required inspections with local jurisdictions to identify and quickly resolve any code concerns.
  • Identified and reviewed proposed change order requests.
  • Drove project objectives on day-to-day operational level by working closely with clients, decision-makers and vendors.
  • Complied with safety protocols in plan coordination, eliminating potential risks.

Construction Management (I&E Superintendent)

BE&K Building Management Group
08.2020 - 10.2021
  • Weekly management update meetings with Client
  • Managed 5 to 7 subcontractors for E&I along with other projects
  • Provide Oversight for Electrical and Instrumentation
  • Oversight for BAS (Building Automation System) Fire Management System
  • Oversight/ Commissioning with Communication, Security Systems
  • Overseen various subcontractors during shutdown and responded to any emergent work
  • Scheduling/ Oversight Shutdown for permanent power.
  • Inspected and reviewed projects to monitor compliance with building and safety codes
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers
  • Monitored construction sites for compliance with safety regulations and adherence to standards

Fill Finish Project Seqirus Pharmaceutical Plant

11.2019 - 08.2020
  • Weekly management update meetings
  • Provide Oversight for Electrical and Instrumentation
  • Oversight for BAS system, Fire Management System
  • Oversight/Commissioning with Communication, Security Systems, Door controls
  • Oversight of new PLC's, VFD's.

Construction Superintendent

Harris Nuclear Plant
02.2016 - 08.2019
  • Provide oversight for facilities, HVAC, and Mods (projects)
  • Attend scheduling meetings, along with safety team meetings with Project managers
  • Provide estimates for upcoming mods (projects) and help with schedule layouts
  • Provide oversight for 20+ workers during online and 75+ during outage
  • Participated in Root Cause Analysis (RCA) stemming from failures from Pumps, Motors, assets, etc.
  • Used IR scans to prolong equipment longevity along with Ultrasonic and vibration analysis equipment
  • Gathered quotes and coordinate contactors to complete upgrades and repairs
  • Trained and assisted employees in use of personal protective equipment and communicated safety requirements for various phases of construction, promoting safe, clean work environment.

Electrical Superintendent

Brunswick Power Plant
05.2012 - 02.2015
  • Spent Fuel Level Indicator Project & AOT Diesel Project, Estimates, Scheduling Mod projects EC Reviews with Engineers and IM's Portal J access and knowledge Emergency Diesel Generator Project Electrical Supervisor Work closure with planners, engineers, and construction managers Work order planning for MOD work Clearance Holder Work order reviews before closing going into vault Performed work order reviews before final approval 04/09/12- 05/18/12-Harris Power Plant I&C Technician MST's, Calibrations on 7300 loop Control Mods, Control Switches, Passport computer skills Agastat relays- testing and calibrating, installation
  • Completed Oil Analysis of assets gathering viscosity, location, pump type and OEM recommendation
  • Estimated materials and labor requirements to complete jobs within budgetary and timeline requirements
  • Implementing Cost Saving Projects (i.e
  • Led upgrades with photo eyes from Fluorescent bulbs, Heating building Automations for a constant temperature, and recording and keeping record on asset downtime.

Robinson Power Plant I&C Technician

01.2012 - 03.2012
  • Hagon Room, Auxiliary room, Calibrations on Isolators, Comparators, Simulators, also wide Range Pressurized heater back up breaker Control Modifications Maintenance Surveillance Testing (MST's) 01/28/10- 10/7/12-Surry Nuclear Power Plant.

I&C Test Technician

H.B. Robinson Nuclear Generating Station
05.2010 - 06.2010
  • Work packages pertaining to CAS (Central Alarm Station) relocation
  • Testing of System Integrity, Point to Point cabling, Procedures and Specs Relay testing, E-Field, Microwaves, IR upgrades, Defense Position towers, Distribution Grouping Panels, Door Controllers, Hand Geometry, Card Readers
  • 06/28/10 - 12/17/10- North Anna Nuclear Power Plant Security Modification Installation of Power and Fiber optic lines Various Nantel Training, Fire Burn-Out Projects Removal of 4160 switchgear Replace damaged control cable in cable tray Install 5kv cable, installation of stress cones and splices Cable resistance testing including volt and amp meter testing.

Education

Electrical Apprenticeship -

Nashville Tech Community College

Diploma -

McMinn County High School

Skills

  • ARC Flash trained
  • LOTO Qualified (NFPA 70E)
  • BIM 360/ Primavera P6
  • Safety- OSHA 30
  • Scheduling/ Budgets
  • Upgrades
  • Report preparation
  • Safety oversight
  • Team leadership
  • Operations management
  • Job status reports
  • Project Budgeting
  • Cost Analysis
  • Construction Management

Timeline

I&E Construction Superintendent

Daikin America
11.2021 - Current

Construction Management (I&E Superintendent)

BE&K Building Management Group
08.2020 - 10.2021

Fill Finish Project Seqirus Pharmaceutical Plant

11.2019 - 08.2020

Construction Superintendent

Harris Nuclear Plant
02.2016 - 08.2019

Electrical Superintendent

Brunswick Power Plant
05.2012 - 02.2015

Robinson Power Plant I&C Technician

01.2012 - 03.2012

I&C Test Technician

H.B. Robinson Nuclear Generating Station
05.2010 - 06.2010

Electrical Apprenticeship -

Nashville Tech Community College

Diploma -

McMinn County High School
Eric Martin