Enthusiastic Pipefitter offering 14 years of experience in fabricating and installing plumbing systems. Sharp and highly trained with a desire to work within the industrial sector.
Overview
14
14
years of professional experience
Work History
Pipe Layer Helper
G.K Real Estate Development LLC
Foley, AL
06.2023 - 05.2024
Assisted pipe layer with the installation of underground pipes and conduits.
Helped to measure, cut, thread and assemble piping components.
Loaded and unloaded materials from trucks using a forklift.
Maintained tools in good working condition by cleaning and lubricating them regularly.
Assisted in the excavation process for trenching activities.
Provided support to pipe layers as needed during installation or maintenance operations.
Performed general labor duties such as shoveling dirt, lifting heavy objects and carrying supplies to job sites.
Operated power equipment such as trenchers, saws, drills and other related machinery when necessary.
Marked locations on the ground where pipelines were to be laid out according to blueprints or diagrams provided by supervisors.
Used hand tools such as hammers, pliers, wrenches to secure pipes into place while ensuring that they are properly connected and sealed off.
Inspected trenches before backfilling them with soil to ensure that all connections are secure and free from leaks or damage.
Ensured proper safety procedures were followed at all times when performing tasks involving hazardous substances or dangerous situations.
Communicated effectively with co-workers regarding progress updates or changes in plans for pipeline installations.
Reported any issues encountered during work shifts promptly to supervisors for proper resolution.
Maintained clean worksites throughout the duration of projects by removing debris and disposing it appropriately.
Followed instructions given by foreman and supervisor closely while adhering strictly to company policies and regulations.
Collaborated with team members in order to complete tasks efficiently within set deadlines.
Stayed up-to-date on industry standards pertaining to pipeline construction techniques.
Monitored pipeline pressure levels daily using specialized instruments like gauges or meters.
Tested newly installed pipelines for functionality prior to connecting them with other systems.
Measured and marked pipes for cutting and threading and demonstrated knowledge and skills in safe rigging practices.
Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
Used and maintained fusion equipment and pipefitting hand tools.
Threaded pipes using specified machinery.
Recognized various materials used in piping systems and displayed working knowledge of material handling techniques.
Managed movement of materials and equipment to different job sites.
Bent, fitted and brazed pipes according to specifications.
Fabricated and positioned screw pipe, socket weld pipe and stainless steel tubing.
Assembled and secured pipes, tubes and fittings according to specifications and welded, soldered and threaded joints.
Used welding and soldering equipment to join sheet metal components following blueprints and job specifications.
Cut diverse pipe sizes and lengths to prepare for installation.
Performed pipe fabrication, installation and fitting according to proper specifications.
Cut openings in walls and floors to accommodate pipe and pipe fittings.
Cut and beveled piping using cutting torches, saws and threading machines.
Identified and located required tools prior to starting each project.
Inspected installations to repair leaks and make adjustments to pipes.
Filled piping systems with water and air to test for leaks.
Verified and gathered measurements to determine proper piping sizes.
Inspected and tested installed systems to isolate and identify faults.
Modified piping systems with task-specific tools to complete preventive maintenance.
Operated backhoe to dig trenches for water and sewer pipe.
Assisted craft workers from other trades and shops on variety of projects.
Inspected worksites to determine presence of obstructions, unsafe conditions and crew errors.
Assisted [Job Title] by inspecting pipes and piping systems to assess quality and condition.
Set alignment and grade using laser.
Filled pipes with sand or resin to prevent distortion for proper installation.
Pipe Layer Helper
Blake Land Development
Saint Cloud, FL
01.2018 - 12.2022
Assisted pipe layer with the installation of underground pipes and conduits.
Helped to measure, cut, thread and assemble piping components.
Loaded and unloaded materials from trucks using a forklift.
Maintained tools in good working condition by cleaning and lubricating them regularly.
Assisted in the excavation process for trenching activities.
Provided support to pipe layers as needed during installation or maintenance operations.
Performed general labor duties such as shoveling dirt, lifting heavy objects and carrying supplies to job sites.
Operated power equipment such as trenchers, saws, drills and other related machinery when necessary.
Marked locations on the ground where pipelines were to be laid out according to blueprints or diagrams provided by supervisors.
Used hand tools such as hammers, pliers, wrenches to secure pipes into place while ensuring that they are properly connected and sealed off.
Inspected trenches before backfilling them with soil to ensure that all connections are secure and free from leaks or damage.
Ensured proper safety procedures were followed at all times when performing tasks involving hazardous substances or dangerous situations.
Communicated effectively with co-workers regarding progress updates or changes in plans for pipeline installations.
Maintained clean worksites throughout the duration of projects by removing debris and disposing it appropriately.
Followed instructions given by foreman and supervisor closely while adhering strictly to company policies and regulations.
Collaborated with team members in order to complete tasks efficiently within set deadlines.
Stayed up-to-date on industry standards pertaining to pipeline construction techniques.
Monitored pipeline pressure levels daily using specialized instruments like gauges or meters.
Tested newly installed pipelines for functionality prior to connecting them with other systems.
Measured and marked pipes for cutting and threading and demonstrated knowledge and skills in safe rigging practices.
Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
Used and maintained fusion equipment and pipefitting hand tools.
Threaded pipes using specified machinery.
Recognized various materials used in piping systems and displayed working knowledge of material handling techniques.
Managed movement of materials and equipment to different job sites.
Bent, fitted and brazed pipes according to specifications.
Fabricated and positioned screw pipe, socket weld pipe and stainless steel tubing.
Assembled and secured pipes, tubes and fittings according to specifications and welded, soldered and threaded joints.
Cut diverse pipe sizes and lengths to prepare for installation.
Performed pipe fabrication, installation and fitting according to proper specifications.
Cut openings in walls and floors to accommodate pipe and pipe fittings.
Cut and beveled piping using cutting torches, saws and threading machines.
Identified and located required tools prior to starting each project.
Inspected installations to repair leaks and make adjustments to pipes.
Filled piping systems with water and air to test for leaks.
Inspected and tested installed systems to isolate and identify faults.
Modified piping systems with task-specific tools to complete preventive maintenance.
Operated backhoe to dig trenches for water and sewer pipe.
Set alignment and grade using laser.
Filled pipes with sand or resin to prevent distortion for proper installation.
Laborer
Jr Davis Construction
Kissimmee, FL
02.2010 - 12.2020
Loaded and unloaded materials onto or from pallets, trucks, or other vehicles using a forklift.
Maintained accurate records of inventory levels and product locations in the warehouse.
Assisted with basic maintenance tasks such as sweeping, mopping, painting, and cleaning.
Worked with team members to ensure efficient workflow throughout the day.
Transported heavy items from one location to another using hand trucks or carts.
Stacked and arranged products on pallets according to size and weight requirements.
Unloaded freight from containers and organized them for storage in designated areas.
Performed regular checks of equipment for proper operation and safety compliance.
Followed all safety procedures when handling hazardous materials in the laboratory setting.
Organized tools, supplies, and equipment needed for specific jobs according to instructions provided by supervisor.
Prepared surfaces prior to painting by sanding, scraping, patching holes, and filling cracks with putty or plaster.
Installed insulation into walls using blow guns or similar tools while adhering to safety guidelines.
Cleaned work area after job completion ensuring all debris is properly disposed of.
Inspected finished projects for quality assurance purposes before handing off to customer.
Lifted objects weighing up to 50 pounds without assistance when necessary.
Operated various power tools such as drills and saws safely while following manufacturer's instructions.
Ensured that all personal protective gear was worn at all times while on the job site.
Repaired damaged drywall sections including taping joints and applying texture coats as needed.
Poured concrete foundations for structures such as buildings or bridges according to blueprints provided.
Assembled scaffolding around construction sites for use by laborers during high-rise building projects.
Performed physical activities requiring heavy lifting, walking and standing for long periods of time.
Completed variety of physical labor tasks.
Understood and followed oral and written directions.
Maintained clean, safe working environment by removing debris from job site prior to shift completion.
Operated and maintained a variety of equipment including hand and power tools.
Collaborated with team members to complete assigned tasks and meet tight deadlines.
Met company and OSHA safety guidelines for work site operations to minimize worker risk.
Loaded and unloaded daily material shipments, keeping products organized and secure to prevent damage and optimize handling.
Used picks and shovels to dig, spread and level dirt and gravel.
Performed repetitive assembly tasks with hand and power tools and automated equipment.
Sorted and placed materials or items on racks, shelves or in bins to keep warehouse organized.
Performed regular servicing and preventive maintenance on assigned equipment.
Lubricated and cleaned machinery and tools.
Mixed, poured, and spread concrete, asphalt gravel and other materials.
Cut materials into specified sizes for installation using tile cutters and power saws.
Prepared items for transportation installing bracing, padding and strapping to prevent damage.
Utilized two-way radios and hand signals to coordinate communication between equipment operators.
Applied caulking compounds by hand or caulking guns to protect against entry of water or air.
Joined, wrapped, sealed and bedded sections of underground pipe and pipe penetrations.
Prevented water leakage or rust by covering exposed nailheads with roofing cement or caulking.
Performed demanding physical work over extended periods and modeled positive attitude.
Understood how to operate and maintain job site equipment safely and for maximum productivity.
Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
Displayed high standards for quality workmanship and routinely double-checked work.
Cleaned or prepared construction sites to eliminate hazards.
Gained independent working skills and guided and mentored less experienced team members.
Operated equipment with strong focus on safety and ground communication.
Worked productively as lead or helping team member to drive customer satisfaction.
Loaded or unloaded building materials to distribute machinery or tools.
Demonstrated best safety practices working at heights and lifting various objects.
Inspected sites before and after construction projects.
Learned and mastered skilled trade specialties under guidance of expert mentors.
Assisted with diverse construction challenges to help team and customer.
Measured, marked or recorded openings or distances to construction layout areas.
Coordinated phases of construction projects from inception to completion.
Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
Lubricated, cleaned or repaired machinery or equipment.
Controlled traffic passing near, in or around work zones.
Positioned, aligned or sealed concrete wall sections or pipes.
Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
Performed site activities required of green-certified construction practices.
Accountant - Accounts Payable and Treasury at Gemstone Real Estate Development LLCAccountant - Accounts Payable and Treasury at Gemstone Real Estate Development LLC