Overview
Work History
Education
Skills
Timeline
Generic

Esteban Soto

Lincoln,NE

Overview

12
12
years of professional experience

Work History

Foreman

JC Builders, Inc.
09.2019 - 06.2022
  • -Responsibilities included overseeing daily operations at a worksite to ensure the completion of projects in an efficient manner, reading project plans and specifications, supervising and coordinating crew members by effective communication to ensure project completion, ensuring equipment is adequately maintained, regulating safety on-site by making sure safety rules are followed at all times.

Foreman

Lithko Contracting, LLC
03.2016 - 08.2019
  • -Responsibilities included overseeing daily operations at a worksite to ensure the completion of projects in an efficient manner, reading project plans and specifications, supervising and coordinating crew members by effective communication to ensure project completion, ensuring equipment is adequately maintained, regulating safety on-site by making sure safety rules are followed at all times.

Carpenter

Fessler and Bowman
05.2015 - 02.2016
  • -Tasks included installing the concrete formwork foundations in the early stages of a building or other construction projects, and building other wooden structures, such as framing, scaffolding, or molds for filling with concrete. To perform these tasks the utilization of power tools, power saws, and hand tools was needed as well for various tasks such as calculating measurements, cutting materials to the precise measurements needed, and assembly of forms and other wooden structures.

Sub-contractor

Salomon & Associates
10.2013 - 04.2015
  • -Hired contractor tasked with creating rough framing of the structure of the house desired based upon the blueprint. Installed drywall and spackling to finish work that blended seams and Wallwork. Installed subflooring, and worked on roofing by installing shingles, asphalt, metal, and other materials to make the roof weatherproof in order to prevent problems that could lead to later damage.

Crew Leader

84 Lumber Company
07.2010 - 11.2013
  • -Responsibilities included the oversight of the laser projection system entering the measurements for the construction of roof trusses, and verifying the dimensions of precut parts and their correct assembly. Additionally, tasks include assembling building material components such as wall panels, roof, and floor trusses. Processes include insertion or positioning of materials, clamping, splicing, fitting parts, and use of both hand and power tools.

Education

High School - undefined

Shelby High School
Shelby, NC
05.2008

Skills

  • Languages: Fluent in Spanish and English
  • Heavy machinery operation
  • Forklift operation
  • Mini-excavator operation
  • Skid-steer loader operation
  • Power and hand tool proficiency

Timeline

Foreman

JC Builders, Inc.
09.2019 - 06.2022

Foreman

Lithko Contracting, LLC
03.2016 - 08.2019

Carpenter

Fessler and Bowman
05.2015 - 02.2016

Sub-contractor

Salomon & Associates
10.2013 - 04.2015

Crew Leader

84 Lumber Company
07.2010 - 11.2013

High School - undefined

Shelby High School
Esteban Soto