Summary
Overview
Work History
Education
Skills
LANGUAGES
Timeline
Generic

FELIPE GARCIA

Eagle Lake,FL

Summary

Dynamic Asphalt Plant Superintendent with extensive hands-on experience managing 400 and 600 TPH facilities, supported by a solid foundation as a former Asphalt Plant Foreman. Over six years of leadership in driving reliable production, overseeing major equipment installations, and achieving up to 60% RAP in mix designs. Expertise in plant management includes budgeting, capital expenditures, preventive maintenance, and inventory control, consistently reducing downtime through strategic maintenance coordination and vendor partnerships. A proven leader dedicated to training and mentoring teams, fostering a culture of safety and operational excellence while championing continuous improvement and scalable plant performance.

Overview

2
2
Languages
7
7
years of professional experience

Work History

Asphalt Plant Superintendent

S & L Materials Inc
01.2026 - Current
  • Oversaw the day-to-day plant operations consisting of a 400 tph Astec Plant capable of running up to 45% and 60% rap in all mix designs.
  • In charge of budgeting for both locations and assisting the Asphalt Operations Manager in decision making and planning.
  • Trained and mentored plant foreman on safe operating procedures and troubleshooting techniques, improving team confidence and operational consistency.
  • Developed improvement plans for plant reliability and prioritizing initiatives that deliver sustained production goals and clearer KPI tracking.
  • Maintained detailed equipment logs and inspection records to ensure traceability and simplify regulatory reviews while catching wear trends early.
  • Coordinated maintenance windows with operations and vendors to expedite repairs, shortening downtime and preserving production targets.
  • Monitored plant performance and investigated anomalies, implementing corrective adjustments that restore stable operating conditions and minimize rework.
  • Implemented standardized inspection checklists and documents corrective actions to improve traceability, simplifying compliance reviews.
  • Coached junior operators and plant foreman on troubleshooting and decision-making under pressure, building frontline capability and sustaining uptime during peak periods.
  • Spearheaded capacity-planning initiatives to align raw material flows and equipment readiness, enabling consistent production output.
  • Analyzed quality deviation trends and producing measurable improvements in quality consistency and fewer corrective actions.
  • Implemented standardized sampling at key process points to detect quality drift early, enabling timely corrective actions and steadier output.
  • Worked with material vendors for on time delivery of aggregate by rail and truck.
  • Worked closely with the quality control manager on mix quality and mix designs.
  • Scheduled our crusher plant 1200 eagle ultra and it's assigned crew to crush rap at either location.

Asphalt Plant Foreman

S & L Materials Inc
09.2024 - 01.2026
  • Assisted the Asphalt Operations Manager with the planning of S & L Materials’ inaugural asphalt plant.
  • Oversaw all aspects from site construction through the assembly of the state-of-the-art 400 TPH Astec Double Barrel XHR plant, designed to accommodate up to 60% recycled asphalt across all mix designs.
  • Supervised the daily operations of the asphalt plant, monitored production processes, and implemented adjustments to optimize performance and output.
  • Coordinated routine maintenance and repairs of plant equipment and machinery.
  • Developed and maintained preventive maintenance schedules to minimize operational downtime.
  • Monitored and managed inventory levels of raw materials.
  • Worked closely with suppliers to ensure the timely delivery of all necessary materials.
  • Prepared and submitted detailed reports on plant operations and performance for the Asphalt Operations Manager.
  • Provided training, guidance, and support to team members to enhance their skills and overall performance.
  • Conducted regular safety meetings, training sessions, and equipment inspections.

Asphalt Plant Foreman

CWR Contracting Inc
04.2022 - 09.2024
  • Responsible for overseeing the daily operations of a 1997 400 TPH CMI plant and a 2023 600 TPH Astec Plant.
  • Monitored production processes and made necessary adjustments to optimize plant performance and output.
  • Coordinated routine maintenance and repairs of plant equipment and machinery.
  • Developed and maintained preventive maintenance schedules to minimize operational downtime.
  • Led the installation of new equipment, including an 87,000 CFM Herman Grant baghouse, a 20,000-gallon electric heated vertical liquid asphalt tank, a 200-ton Dillman silo, and a rebuilt CMI 400 TPH drag.
  • Oversaw the replacement of CMI Impulse III blending controls with new Astec MPIII blending controls.
  • Monitored and managed inventory levels of raw materials.
  • Worked closely with suppliers to ensure the timely delivery of all necessary materials.
  • Prepared and submitted detailed reports on plant operations and performance to the Asphalt Plant Manager.
  • Collaborated with the Plant Manager on the planning of the plant budget.
  • Provided training, guidance, and support to team members to enhance their skills and overall performance.
  • Conducted regular safety meetings, training sessions, and equipment inspections.
  • Ensured full compliance with all safety, health, and environmental regulations.
  • Worked closely with the QC Manager to ensure the production and sale of high-quality asphalt mix.

Asphalt Plant Operator

CWR Contracting Inc
03.2020 - 04.2022
  • Responsible for operating and maintaining the asphalt plant, ensuring the production of quality asphalt.
  • Monitored the asphalt production process, troubleshooting and making adjustments as necessary.
  • Scheduled production activities to meet customer orders and company requirements.
  • Performed maintenance and repairs on the plant and its components.
  • Kept the plant clean and organized.
  • Performed preventative maintenance on plant equipment.
  • Maintained accurate records and ensured compliance with all applicable regulations.

Asphalt Plant Equipment Operator/ Groundman

CWR Contracting Inc
05.2019 - 03.2020
  • Responsible for the safe and efficient operation of the heavy equipment and working closely alongside fellow team members on a variety of production tasks.
  • Managed equipment to keep the asphalt plant feed while operating.
  • Conducted pre and post equipment inspections.
  • Directed dump truck drivers where to dump materials that are being delivered.
  • Kept the yard clean.
  • Performed general maintenance on the plant.
  • Kept the plant clean and the scales.
  • Kept the parts room clean and organized.
  • Kept the tool room clean and organized.

Education

Diploma -

Roosevelt Academy
Lake Wales, FL
05.2019

Skills

  • Production Planning
  • Time Management
  • Microsoft Office
  • Plant Management
  • Employee Relations
  • Budgeting
  • Resource Planning
  • Resource Allocation
  • Problem Solving
  • Inventory Management
  • Customer Service
  • Capital Expenditures
  • Manufacturing Operations
  • Team Leadership
  • Communication

LANGUAGES

English (Native)
Spanish (Native)

Timeline

Asphalt Plant Superintendent

S & L Materials Inc
01.2026 - Current

Asphalt Plant Foreman

S & L Materials Inc
09.2024 - 01.2026

Asphalt Plant Foreman

CWR Contracting Inc
04.2022 - 09.2024

Asphalt Plant Operator

CWR Contracting Inc
03.2020 - 04.2022

Asphalt Plant Equipment Operator/ Groundman

CWR Contracting Inc
05.2019 - 03.2020

Diploma -

Roosevelt Academy
FELIPE GARCIA