Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Francisco Javier Melendez Jr

Penitas

Summary

My objective is to continue growing in my experience as an I&E personal, to one day achieve the goal of becoming a project manager while keeping safety and integrity at the top of my daily practices.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Electrician Lead Man

ISC
04.2025 - Current
  • Electrician Leadman in a polymer chemical plant.
  • My key responsibilities are to conduct walk thrus with the foreman, General foreman and superintendent. To analyze work area. Conduct safe practices for our wire pulls. Ensure the safety of our personal and that the Goal was achieved.
  • Conducted wire pulls with a group of 16 Guys. Set up guys for wire pull and directed them by locating certain race ways, or cable trays to pull on. Ensured all proper safety measures were taken aswell.
  • Conducted wire pulls of wire gauges, from 7/C #12 & up to 35kv.
  • Did proper paperwork as pull sheets, fall assesments /working at heights. Water /Heat stress logs and production sheets.

Electrician Leadman

Bechtel
12.2024 - 04.2025
  • Electrician Leadman in a LNG Refinery.
  • Installed cable bust duct system and pulled all high voltage cable through the system. While completing 100% of system
  • Installed cable tray 12-36 inch tray. Insured everything was fastened and according to code.
  • Did loop checks and punch list on all cabling for An MCC. Prepped cabling for all switch gear.
  • Knocked out windows below said MCC and installed Rox Blox and ensured cables were sealed and fastened properly.

Foreman Electrician

MMR Constructors
05.2024 - 12.2024
  • Foreman in at a spire substation and Gas refinery plant
  • Foreman responsible for a crew of 20 Wire pullers/punch list crew. This included journeyman and helpers. My duties were to lift out my crew and ensure our production goals for the day were met. While working safe and also hitting everything to it proper code and specs.
  • Would analyze prints and work area’s and plan for the day and its projects and while also planing ahead for future dates.

Foreman Electrician

W industries
12.2023 - 05.2024
  • Foreman in an Offshore rig / platform.
  • My responsibilities were to Run a crew of 18 Wire pullers.
  • Conducted meetings with our superintendent and project manager for priority pulls and also daily production pulls.
  • Walked down work areas and advised 2 Leadman and the crew on which race ways cables were going to be pulled thru.
  • Made sure that all cable was properly pulled with enough footages to land on proper landing place. Also assured all cable was properly secured & Tagged
  • Ordered cable spools and ensured proper staging areas for cable spools.
  • Did production sheets and assured our daily production goals were met by preparing the day before for the following days cable runs.
  • Ensured all cable pulls were done in a safe manner and that all cable pull crew had proper documentation to work at heights and proper pull sheets. While also conducting all my foreman documentation as well.

Instrument Technician

Space x
01.2022 - 10.2022
  • Instrument tech at a SpaceX launch facility and SpaceX fuel storage tank farm
  • Conducted preventive maintenance programs to maintain optimal performance of all instruments.
  • Calibrated, tested and adjusted flowmeters to ensure accurate readings.
  • Provided technical support to operations personnel regarding instruments.
  • Conducted installation of instruments while doing 100% completion by installing proper, conduit, cable tray and supports for said instruments while also running proper cabling and doing proper terminations.
  • Did loop checks and proper test on all instruments such as flow meters, transmitters, densitometers, RTD and MOV valves.
  • Worked along side engineering for proper installation and future projects.

I&E Technician

W&k industrial
11.2020 - 12.2021
  • I&E tech at Tesla gigafactory, project in automations, battery Cell and a Tesla clean room.
  • Tested newly installed instrumentation systems to ensure proper performance before start up operations began.
  • Installed conduit and cable tray with all proper grounding and bonding.
  • Did knock outs on panels and also installed said panels.
  • Ran proper cabling to all Rio panels and instruments. Also terminated both in the Rio panels and instruments.
  • Did proper loop checks and test the instruments for proper scaling and proper readings.
  • Read blueprint and followed the proper descriptions for blueprints.

Electronics Technician

Schaumburg/Liberty oilfield services
01.2020 - 10.2021
  • Electronics technician for Frac fleet
  • Identified and diagnosed malfunctioning electronic components, systems, and equipment.
  • Read proper line schematics to make sure all terminations were done properly and in there proper spots
  • Performed preventive maintenance on equipment. Did loop checks and proper calibration on instruments.
  • Did PLC and DCU updates and programming. To ensure proper firmware was uploaded for proper equipment.
  • Assisted frac crew with all electronic and electrical problems, which included troubleshooting, install and calibration.

Electrical Apprentice

MMR
04.2019 - 12.2020
  • Installed duct banks with pvc conduit
  • Assisted journeyman in conduit runs and cable tail ins
  • Assisted journeyman on cable tray runs
  • Ran heat trace system on all piping, And did heat trace terminations.
  • Did duct banks systems and grounding grids.

Electrical Apprentice

Saulsburry industries
12.2018 - 03.2019
  • Installed conduit with its proper supports and specs.
  • Assisted in cable tray installation
  • Assisted with heat trace and duct banks systems
  • Assisted with grounding and also ground grids.
  • Manufactured supports for proper installation.

Electrician apprentice

S&B plant services
08.2017 - 12.2018
  • Assisted journeyman with grounding and bonding
  • Learned proper use of power tools.
  • Learned to use 535 threading machine, Chicago bender, 747 & 555 bender.
  • Learned to strip cables and identify cables.
  • Learned how do knock outs
  • Also learned to identify electrical material and what they are used for

Education

High School - undefined

La Joya High School
La Joya, TX

Skills

  • Electrical troubleshooting
  • Conduit installation
  • Safety compliance
  • Team leadership
  • Project planning

Certification

  • Nccer # 27170918
  • Tdlr #459527

Languages

Spanish: Professional

Timeline

Electrician Lead Man

ISC
04.2025 - Current

Electrician Leadman

Bechtel
12.2024 - 04.2025

Foreman Electrician

MMR Constructors
05.2024 - 12.2024

Foreman Electrician

W industries
12.2023 - 05.2024

Instrument Technician

Space x
01.2022 - 10.2022

I&E Technician

W&k industrial
11.2020 - 12.2021

Electronics Technician

Schaumburg/Liberty oilfield services
01.2020 - 10.2021

Electrical Apprentice

MMR
04.2019 - 12.2020

Electrical Apprentice

Saulsburry industries
12.2018 - 03.2019

Electrician apprentice

S&B plant services
08.2017 - 12.2018

High School - undefined

La Joya High School