Summary
Overview
Work History
Education
Skills
Timeline
background-images
Fredrick Baldwin

Fredrick Baldwin

Missouri City,TX

Summary

Dedicated construction professional with experience at 2 Cords Construction, excelling in problem-solving and time management. Proven ability to enhance project efficiency through meticulous attention to detail and effective teamwork. Skilled in drywall installation and power tools, consistently delivering high-quality results while maintaining a safe and organized work environment.

Overview

5
5
years of professional experience

Work History

General Laborer

People Ready Temp Agency
01.2020 - Current
  • Maintained clean and organized worksites, minimizing hazards and promoting a safe working environment.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Demonstrated strong work ethic, completing physically demanding tasks under varying conditions.
  • Performed general housekeeping and cleaning tasks.
  • Completed tasks efficiently for timely project completion within set deadlines.
  • Improved worksite safety by consistently adhering to established protocols and regulations.
  • Enhanced team morale through positive attitude, mutual support, and fostering a collaborative atmosphere during challenging projects.
  • Assisted in the successful completion of various construction projects through diligent labor and attention to detail.
  • Cleaned and maintained tools, equipment and worksites.

Construction Worker

2 Cords Construction
09.2022 - 11.2024
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.
  • Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.

Education

Voc Nursing - Nursing

St. Philip's College
San Antonio, TX
01.1987

Skills

  • Heavy lifting
  • Problem-solving
  • Time management
  • Attention to detail
  • Hand and power tools
  • Safety procedures
  • Organization
  • Debris and trash removal
  • Tool and equipment maintenance
  • Basic carpentry
  • Power tools proficiency
  • Demolition work
  • Flooring installation
  • Drywall installation
  • Residential construction
  • Door installation
  • Scaffolding setup
  • Drywalling
  • Measuring and cutting
  • Loading and unloading
  • Warehouse organization
  • Manual dexterity
  • Punctuality and reliability
  • Fence building
  • Tile setting
  • Hand tools operation
  • Janitorial tasks
  • Willingness to learn
  • Job site cleanup
  • Hand-eye coordination
  • Complex Problem-solving
  • Trash collection

Timeline

Construction Worker

2 Cords Construction
09.2022 - 11.2024

General Laborer

People Ready Temp Agency
01.2020 - Current

Voc Nursing - Nursing

St. Philip's College
Fredrick Baldwin