pd 10 operator and pile pc and torque Tube qc inverter
Aerotek temp agency
01.2019 - 01.2023
I ran an excavator with the vibe hammer attachment for 2 sites for granite for refusals in
Education
Ged -
Paris Junior college
01.2014
Skills
I've been doing solar for 6 years, pile install and quality control I know piles from the ground up from test piles all the way to post install and inverter install I know the tolerances on certain systems as nextracker ati pre-drill and direct drive install I know how to read inverter plans to make sure they are square and are all in the required tolerances I know how to run equipment such as the excavator with the vibe hammer 12k forklift and skid steer I'm a very fast learner and I'm hands on
I do regular checks during production to assess if the output meets required specifications
Testing: Products or materials are subjected to tests to ensure they perform as expected under various conditions
Sampling: A small sample of the product is inspected or tested to make inferences about the entire batch or lot
Standardization: QC ensures that processes, materials, and procedures are standardized to reduce variation and maintain consistency
Corrective Actions: When defects are detected, corrective measures are taken to fix the problems, such as retraining workers or adjusting machinery
Timeline
Operator
ROBCO
03.2025 - 07.2025
Pile foreman, inverter installer, pile qc/ inverter qc for final turnover