Overview
Work History
Education
Skills
Timeline
Generic

Gabriel R Mendoza

Denton,tx

Overview

7
7
years of professional experience

Work History

Operator

ROBCO
03.2025 - 07.2025
  • Operated machinery efficiently to meet production schedules and maintain workflow consistency.
  • Monitored equipment performance, identifying and resolving issues to minimize downtime.
  • Collaborated with team members to ensure adherence to safety protocols and procedures.
  • Conducted quality checks on products, ensuring compliance with industry standards.
  • installed inverters and battery storage systems for the bess sites that we were getting

Pile foreman, inverter installer, pile qc/ inverter qc for final turnover

Aerotek/granite
06.2024 - 02.2025
  • Supervised daily operations, ensuring compliance with safety protocols and project specifications.
  • Coordinated workforce activities, optimizing resource allocation for increased productivity.
  • Trained new team members on equipment usage and safety standards, enhancing team efficiency.
  • Conducted regular inspections of tools and equipment to maintain operational readiness and safety standards.

pd 10 operator/ pile qc inverter, installer pile pc, post installer

Blattner Energy
06.2023 - 06.2024

pd 10 operator and pile pc and torque Tube qc inverter

Aerotek temp agency
01.2019 - 01.2023
  • I ran an excavator with the vibe hammer attachment for 2 sites for granite for refusals in

Education

Ged -

Paris Junior college
01.2014

Skills

  • I've been doing solar for 6 years, pile install and quality control I know piles from the ground up from test piles all the way to post install and inverter install I know the tolerances on certain systems as nextracker ati pre-drill and direct drive install I know how to read inverter plans to make sure they are square and are all in the required tolerances I know how to run equipment such as the excavator with the vibe hammer 12k forklift and skid steer I'm a very fast learner and I'm hands on
  • I do regular checks during production to assess if the output meets required specifications
  • Testing: Products or materials are subjected to tests to ensure they perform as expected under various conditions
  • Sampling: A small sample of the product is inspected or tested to make inferences about the entire batch or lot
  • Standardization: QC ensures that processes, materials, and procedures are standardized to reduce variation and maintain consistency
  • Corrective Actions: When defects are detected, corrective measures are taken to fix the problems, such as retraining workers or adjusting machinery

Timeline

Operator

ROBCO
03.2025 - 07.2025

Pile foreman, inverter installer, pile qc/ inverter qc for final turnover

Aerotek/granite
06.2024 - 02.2025

pd 10 operator/ pile qc inverter, installer pile pc, post installer

Blattner Energy
06.2023 - 06.2024

pd 10 operator and pile pc and torque Tube qc inverter

Aerotek temp agency
01.2019 - 01.2023

Ged -

Paris Junior college
Gabriel R Mendoza