Dynamic leader in electrical commissioning with a track record of enhancing team productivity by over 30%. Expertise in strategic planning, problem-solving, and maintaining high safety and quality standards ensures successful project execution. Strong mentor with a focus on fostering collaboration and process improvement across teams.
Perform commissioning and startup testing on industrial power and control systems.
Executed CT, DRLO, PI, DAR, winding resistance, and ductor tests on breakers, transformers, and switchgear to ensure compliance and reliability.
Diagnosed relay protection schemes and confirmed operational integrity of switchgear, breakers, and motors to enhance system safety.
Finalized commissioning documentation, test reports, and QA/QC records, ensuring alignment with client specifications and regulatory standards.
·Assist and verify all NETA Testing-Shall be owned by the EC and completed by a NETA Certified party on required equipment
· Inspect all procedures like Megger tests on cabling per customer specification or NEC requirements (whichever is more stringent)
·Ensure all (Vendor and Trade Partner) Documentation and Test reports shall be uploaded to the approved Cx or QA tracking software (Cx Alloy) prior to applying for a RTE Permit. All documentation to be reviewed and approved by the EM.
Completed insulation resistance test reports for Megger and WRT equipment, verifying compliance with safety standards and enhancing equipment reliability.
Maintained detailed torque logs to ensure compliance with engineering specifications.
Compiled MV VLF testing reports to assess condition of high voltage cables, contributing to proactive maintenance and risk mitigation.
Obtained calibration certifications to ensure compliance with manufacturer specifications and regulatory requirements.
Conducted quality inspections and finalized documentation for L1 and L2 processes, ensuring adherence to project standards and regulatory requirements.
Confirm all individuals working on de-energized/locked out equipment are task specific Qualified based on the points below or an equivalent qualified electrical safety training.
· Gray Commissioning Teamshall notify the customer Construction Manager, customer Commissioning, customer CPI Project Manager (if applicable), third-party commissioning vendor, LLE vendor, and controls contractor of the scheduled equipment FOD inspection date(s).
· The FOD schedule shall include ALL individual pieces of equipment and what date they will be inspected. The FOD schedule will align with the Grays overall energization schedule ensured by the commissioning team.
· All OFCI/CFCI equipment and interior compartments shall be FOD’d.
· Complete the FOD checklist in QA/Cx Software. Must be signed and turned into QA/Cx software prior to energization.
· The FOD inspections shall be completed within 24 hours before the equipment is energized.
Energy Marshall Approves the Final FOD Completion and applies Tamper seal.
§ Equipment Requested to be Energized
§ Walk down system and previously applied LOTO
§ Roles & Resp.
§ Verify Proper Training(NFPA 70E,QEW,LOTO,First Aid/CPR)
§ Means of communication during energization
§ Verify downstream equipment is in a safe operating condition
§ Shock/Limited/Restricted Approach Boundaries
§ Labels(I.E. Arc Flash, Equipment ID, Energized Equipment labels,Fed To/From)
§ Means of Rescue, i.e. Shepards Hook
§ Review of MOP dry run to ensure clarity.
Supervised contractors on electrical commissioning at Texas and Kansas sites, ensuring compliance with safety and quality protocols while managing commissioning and testing projects.
UNITED STATE MILITARY VETERAN
Served 4 years in the United States Marines.
NFPA70-E
OSHA10
Industrial Electrical NCCR