Overview
Work History
Timeline
Generic

GREGORY J. TANSEY

Bridgewater,Massachusetts

Overview

40
40
years of professional experience

Work History

Town Engineer

Town of Bridgewater
Bridgewater, Massachusetts
01.2021 - Current
  • Responsible for building Bridgewater’s Engineering Division of the DPW and managing the department.
  • Duties include:
  • Training, Managing, overseeing, and keeping the Assistant Town Engineer productive
  • Preparing the DPW Engineering Division’s annual budget and tracking
  • Preparing Municipal Roadway Layout Line surveys using Total Station Survey Instruments and other surveys using GPS Receiver Instruments
  • Preparing Plans and specifications for Municipal Roadway Improvement Projects having MassDOT Prequal requirements up to 1.5 M
  • Performing MassDOT procurements for municipal projects
  • Performing Drainage analysis using HydroCAD Software
  • Performing topographic surveys using Lidar points imported through Global Mapper and Civil 3D software
  • Performing Dam Breach Inundation Analysis for Emergency Action Plans
  • Performing Subdivision and Site Plan Technical Reviews for the Planning Board
  • Development Bridgewater’s Municipal Infrastructure Digital As-built Plan

Director of Engineering Services

Ross Engineering Company, Inc.
Norwell, MA
01.1997 - 01.2022
  • Responsible for day-to-day operation, design, and review activities among the professional staff.
  • Duties include:
  • Soil evaluation and percolation testing
  • Design and permitting of site plans for commercial projects
  • Design of residential and commercial septic systems including pressure-dosed and alternative technology systems
  • Preparation of contract specifications
  • Peer review services for the Town of Whitman for Site Plans and Definitive Subdivisions

Engineer

Camp Dresser & McKee, Inc.
Cambridge, MA
01.1992 - 01.1997
  • Performed extensive earthwork and utility pipeline designs utilizing computers and SOFTDESK (DCA) software
  • Designed landfill closure and grading plans and volume calculations
  • Prepared site plans for the Ismailia Wastewater Treatment Plant in Egypt
  • Checked and edited plans for completeness, accuracy and feasibility
  • Offered guidance, instruction and training to co-workers

Engineer

Tighe & Bond, Inc.
Westfield, MA
01.1990 - 01.1992
  • Performed construction inspections of sewer, water, and gas lines
  • Wrote specifications for watermain and sanitary sewer projects
  • Prepared Existing Facilities Permit Application Report (EFPA)
  • Prepared hydrological reports for landfills
  • Performed pre- and post-development stormwater analysis.
  • Designed leachate collection systems for landfills

Engineer

DeFeo, Wait, and Associates, Inc.
Raynham, MA
01.1988 - 01.1990
  • Prepared site plans for residential and commercial developments
  • Performed drainage studies and culvert analysis
  • Designed storm water collection and infiltration systems
  • Prepared Environmental Notification Forms (ENF).

Engineer

Briggs Associates, Inc.
Rockland, MA
01.1986 - 01.1988
  • Performed field surveys
  • Developed topographical plans
  • Reduced field notes
  • Designed roadway layouts, septic systems and drainage systems.

Timeline

Town Engineer

Town of Bridgewater
01.2021 - Current

Director of Engineering Services

Ross Engineering Company, Inc.
01.1997 - 01.2022

Engineer

Camp Dresser & McKee, Inc.
01.1992 - 01.1997

Engineer

Tighe & Bond, Inc.
01.1990 - 01.1992

Engineer

DeFeo, Wait, and Associates, Inc.
01.1988 - 01.1990

Engineer

Briggs Associates, Inc.
01.1986 - 01.1988
GREGORY J. TANSEY