Summary
Work History
Education
Skills
Languages
Accomplishments
Timeline
Generic

Guillermo Leon

Miami,FL

Summary

Hardworking professional well-versed in handling materials, operating machinery and supporting overall team and project needs. In-depth knowledge of compliance mandates governing site and worker safety. Focused on helping complete skilled work under deadlines. Capable Construction Laborer experienced in operating and maintaining equipment to support job site needs. Physically strong and fit with good time management abilities and dexterity to support skilled work. Determined Construction Worker with solid experience filling various roles on projects. Detail-oriented approach to meeting team and project needs on time. Knack for basic carpentry, roofing and materials management.

Work History

Construction Worker

GLF Construction
Miami, FL
02.2024 - 06.2024
  • Ensured compliance with local codes regarding building regulations.
  • Maintained accurate records documenting project progress throughout duration of each job.
  • Built temporary supports during construction processes such as shoring up beams or columns until they are set in place permanently.
  • Followed blueprints or engineering plans to determine the best methods of assembling structures.
  • Repaired damaged structures with appropriate materials including wood and metal components.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Mixed concrete, mortar and other materials to prepare building material.
  • Operated a variety of tools to excavate, move and grade earth for foundations, trenches and roads.
  • Coordinated with other workers onsite to ensure efficient completion of tasks.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Installed formwork for concrete structures according to specifications.
  • Collected and removed debris from work sites to maintain team productivity and minimize safety hazards.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Addressed and resolved on-site problems to keep teams on-task and avoid development of larger concerns.
  • Sustained safety protocols to maintain secure, proper handling of equipment and materials.
  • Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
  • Positioned, aligned or sealed concrete wall sections or pipes.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Lubricated, cleaned or repaired machinery or equipment.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Operated equipment with strong focus on safety and ground communication.

Education

High School Diploma -

24 de Febrero
Cuba
06-2019

Skills

  • Material Transport
  • Materials Loading
  • Demolition
  • Resource Management
  • Worksite preparation
  • Power Tool Operation
  • Team-oriented and dependable
  • Asphalt Paving
  • Window Installation
  • Blueprint Interpretation
  • Safety and compliance
  • OSHA
  • Carpentry
  • Team Collaboration
  • Flooring Installation
  • Construction
  • Blueprint Reading
  • Electrical Installation
  • Framing
  • Equipment Maintenance
  • Truck loading
  • Site preparation
  • Building codes and regulations
  • Project Planning
  • Construction management
  • Safety policies and procedures
  • Dimensions and Measurements
  • Maintenance Management
  • Critical Thinking
  • Materials Management

Languages

Spanish
Native/ Bilingual
English
Professional

Accomplishments

  • Employee of the Month; 2 months consecutively

Timeline

Construction Worker

GLF Construction
02.2024 - 06.2024

High School Diploma -

24 de Febrero
Guillermo Leon