Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Hector Loya

Panama City

Summary

Seasoned Construction Site Manager with comprehensive understanding of project planning and execution. Strong knowledge of construction methodologies, materials, and regulatory guidelines ensures high standards of site safety. Proven leadership abilities enable effective coordination of multi-disciplinary teams to deliver projects on time and within budget. Demonstrated success in improving operational efficiency, reducing costs, and maximizing productivity at previous job roles.

Knowledgeable leader with record of accomplishment on diverse construction projects. Translates directives of architects, constructions managers and clients into actionable on-site directives to consistently meet project demands. Expert in tackling problems head-on and maintaining strict standards.

Overview

21
21
years of professional experience
4
4
years of post-secondary education

Work History

Construction Site Manager

Uni-Systems Engineering
Minneapolis
05.2024 - 07.2025
  • Coordinated and managed construction projects from start to finish, ensuring that all work was completed on time and within budget.
  • Managed personnel working on-site including assigning specific tasks based upon individual skill sets.
  • Maintained daily logs detailing information such as weather conditions, number of workers present at a given time period, material deliveries received on-site.
  • Provided guidance to laborers regarding job duties and responsibilities.
  • Resolved any issues or problems encountered during construction activities through effective communication with contractors and other stakeholders involved in the project.
  • Supervised subcontractors in their performance of tasks related to the project.

Sign Installer

Easternsigntech
Burlington
02.2021 - 09.2024
  • Read blueprints or drawings to determine materials needed for installation projects.
  • Installed signs on walls, buildings, poles, windows, and other structures according to specifications.
  • Collaborated with team members on complex sign installations requiring multiple people.
  • Installation of Video Led display for NFL,NHL,NBA NCAA.
  • Demo- of existing sign and video boards
  • Measured precise locations for sign installation using tape measures or laser levels.
  • Lifted heavy objects into place with hoists or cranes when necessary.
  • Maintained accurate records of job progress throughout each project's duration.
  • Completed daily reports detailing labor hours and material costs incurred per job.
  • Removed existing signage from surfaces while preserving the integrity of the surface.
  • Operated a variety of tools including saws, drills, grinders, routers, sanders, ladders and lifts.
  • Assembled signage components such as posts and frames with nuts and bolts.
  • Utilized appropriate safety equipment such as hard hats and gloves during installations.
  • Studied blueprints, drawings, and specifications to determine layout of work.
  • Set up hoisting equipment to lift and place structural steel items.
  • Aligned and connected structural components to create safe, long-lasting results.
  • Fabricated steel frames, columns, beams and girders according to blueprints or instructions from supervisors.
  • Positioned steel units, aligned holes and inserted temporary bolts while checking alignments and joining steel parts.
  • Operated cranes appropriately to hoist metal components into required areas.

Ironworker General Foreman

Local 263
Arlington
02.2004 - 11.2020
  • Developed plans for upcoming jobs based on customer specifications.
  • Ordered materials for the job sites as needed and tracked inventory levels.
  • Performed layout calculations to determine the correct size of steel beams or columns required for each project.
  • Inspected equipment on job sites to ensure it was functioning properly and safely operated.
  • Monitored daily operations at the job site to ensure all tasks were completed according to schedule.
  • Enforced safety guidelines among ironworker crews by conducting regular inspections.
  • Oversaw welding activities at job sites to ensure that they met quality standards.
  • Trained new employees on proper installation techniques and safety protocols.
  • Managed a team of ironworkers to ensure safe and efficient completion of projects.
  • Worked closely with subcontractors to complete projects on time and within budget.
  • Ensured compliance with safety regulations and company policies.
  • PCI Precast Installation
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Module Glass installation

Education

JIW - Journeyman Ironworker

Local 263 Apprenticeship
Arlington, TX
02.2004 - 05.2006

APlus Cert - Computer Networking

ATI
Dallas, TX
01.2000 - 08.2001

Skills

  • Project management
  • Blueprint interpretation
  • Construction scheduling
  • Safety compliance
  • Quality control
  • Team leadership
  • Problem solving
  • Attention to detail
  • Employee training
  • Labor management
  • Site safety management
  • Site inspections
  • Commercial construction expert
  • Construction equipment
  • Power and hand tool operation
  • Interpreting blueprints
  • Project schedule adherence
  • Team collaboration
  • OSHA safety requirements
  • Current OSHA 30
  • Logistics coordination
  • Current TWIC card
  • Current 3g unlimited welding certification

References

References available upon request.

Timeline

Construction Site Manager

Uni-Systems Engineering
05.2024 - 07.2025

Sign Installer

Easternsigntech
02.2021 - 09.2024

Ironworker General Foreman

Local 263
02.2004 - 11.2020

JIW - Journeyman Ironworker

Local 263 Apprenticeship
02.2004 - 05.2006

APlus Cert - Computer Networking

ATI
01.2000 - 08.2001