AUTOCAD
A professional with over 19 years experience in oil and gas industry . being as inspector in pipeline and installation project and also repair specially on storage tanks.
Full familiarity with documents and tests.
Trained to control welding and process before, after and during welding as a non-destructive test supervisor. Also inspector of tank repair API 653-EEMUA159.
Full familiarity with API 5L &API 2000 also NFPA 10,11
Known as a cheerful and teamwork engineer. Full compliance with safety and current requirements and regulations of the organization. Instructor of personnel
obtained an A+ score in the annual evaluation in the last ten years.
this is my rule any thing can be achieve with effort.
Monitoring the repair process of three 20-million-liter tanks.
Monitoring of pipelines and compliance with implementation plans.
Creating pipelines for emptying and filling tanks in accordance with the standard and calculating the fluid movement speed in the pipe based on the standards of the National Oil Products Distribution Company.
Installing reinforcement pads on the body of storage tanks according to the standard to setup new line.
Monthly inspection of storage tanks include fix, floating roof &internal roof according to API 653& Monitoring
Full familiarity with Calculation of venting storage tank according to API 2000.
Inspection of welding, color conditions and thickness measurement. According to the routine schedule of tanks and pipelines.
Monthly inspection of welding color conditions and thickness measurement. According to the routine schedule of tanks and pipelines.
Visiting the safety valves and checking the test and due dates.
Supervision of welding processes, including before, during and after, and compliance with the manual.
Continuous monitoring of welding devices and requests for relevant certificates.
Testing of welders according to the size and type of welding.
Reading the radiography report and recording in the file.
Managed successful teams of employees and contractors on projects of all sizes.
Conducted root cause analysis investigations into failed components, assisting clients in addressing underlying issues and preventing future failures.
Reduced production costs through effective management of cross-functional engineering teams.
Achieved successful project completion with rigorous scheduling and resource allocation without any damage.
API ISPECTOR
NDT ISPECTOR
AUTOCAD
SOLIDWORK
OFFICE