
I was in charge of receiving the dirt, concrete. I had to screening it and loading it up in containers.
I would also separate it from clean concrete and mixed.
1. I would be pushing material to the excavator so it would be crushed.
2. Load RCA from 5 yards up to 35 yards.
3. Screen RCA.
As a labor I was in charge of helping loading materials for de customer.
Been an operator a had to load and unload the flatbed it could have from cesspool, bricks, pallets of cement and other construction materials. I would also work with the payloader screening sand and loading topsoil, sand, gravel, RCA, and mulch.
And in the front desk I was receiving calls from customer that wanted to order a delivery, and be responsible for despatch for the drivers, I would also help customers with the material they needed for there driveway. Among other things.