Summary
Overview
Work History
Skills
References
Timeline
Generic

Jake Behrman

Groesbeck,TX

Summary

Detail-oriented team player with vast experience with AT&T Turf Program. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

20
20
years of professional experience

Work History

Project Manager

Ansco
08.2024 - Current

Currently awaiting new roles with transition of Ansco/BV merger

Integration Manager

Black & Veatch
08.2014 - 08.2024
  • Responsible for all RMR integration activities for AT&T project
  • Developed innovative process to have tower crews perform Script load, Nea testing, and call testing. This has created efficiencies in the RMR market which is very large area. Allowing crews to build and complete sites on their schedule. This process prevents multiple groups on same site which can be several hours from home office.
  • Work with construction team to assure cell sites built per build standards
  • Interface with AT&T RAN design for any issues preventing builds
  • Experience performing SPCTs and civil SOW on cell sites
  • Participant in Design Review Meeting to capture Scope of work for Nokia to Ericsson Modernization project
  • Interface with client for all status updates post construction through On-AIR tasks
  • Coordinated with internal teams to schedule and troubleshoot all issues on site
  • Integration financials
  • Submit POs for all Integration vendors and subs performing troubleshooting
  • Analyze Integration reports
  • Work with crews to correct issues
  • Inform client when integration issues resolved
  • Provided field support for troubleshooting VSWR, PIM, CPRI failures, provisioning, and scripting issues with contractors and integration vendors.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.
  • Worked effectively in fast-paced environments.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Proven ability to develop and implement creative solutions to complex problems.
  • Proven ability to learn quickly and adapt to new situations.

Telecom Construction Manager/Cell Tower Technician

Faith Technologies
04.2010 - 08.2014
  • Manage 8 crews within Colorado/Wyoming
  • Perform all testing and troubleshooting for crews
  • Manage budgets for all projects
  • Manage Build/ tiger teams in RMR market
  • Complete all closeout documents for sites
  • Performed major construction milestone job walks to ensure quality/ accuracy of SOW
  • Provide material that was missed on BOM for crews
  • Closeout out all PO/CO for sites.

Wind Turbine Electrical installation

Sentry Engineering Hunter
05.2011 - 02.2012
  • Electrical installations to Wind Turbines in the Oklahoma market
  • Follow all safety procedures.

Wind Turbine Technician

Vestas Wind Systems A/S
04.2010 - 05.2011
  • Troubleshooting Wind Turbine electronics
  • Main component change outs
  • Operation and Maintenance services.

Wind Turbine Electrical Foreman

AC Electrical
05.2005 - 04.2010
  • Ensure proper safety procedures are followed
  • Plan out daily tasks for crews
  • Make sure all jobs done on time and accurately.

Wind Turbine Electrical Installation

Ventus Energy Systems
09.2004 - 05.2005
  • Electrical Installation splicing / Heavy equipment operator with emphasis on safety.

Skills

  • Netact/ENM
  • AREA
  • Quantum
  • MNRC Hot key
  • NEST
  • SMARTLAUNCH
  • MPILOT/BBT Tools
  • Smart
  • PGDB
  • AOTS
  • Fiber testing/Scoping OTDR
  • PIM testing
  • Sweep Testing
  • TMA commsioning
  • Nokia BBU commissioning
  • Ericsson BBU commissioning
  • Call testing
  • RRH troubleshooting
  • RF Vital analysis and troubleshooting
  • External alarm testing and clearing
  • RET troubleshooting/Commsioning

References

  • Doug Huffman , DH1849@ATT.COM , 760-715-4140
  • Reid Post , RP836C@ATT.COM , 720-838-4228
  • Jose Garcia , JG1712@ATT.COM , 619-395-2301
  • Kevin Jones , Kevin.Jones@ANSCOLLC.COM , 412-956-9361

Timeline

Project Manager

Ansco
08.2024 - Current

Integration Manager

Black & Veatch
08.2014 - 08.2024

Wind Turbine Electrical installation

Sentry Engineering Hunter
05.2011 - 02.2012

Telecom Construction Manager/Cell Tower Technician

Faith Technologies
04.2010 - 08.2014

Wind Turbine Technician

Vestas Wind Systems A/S
04.2010 - 05.2011

Wind Turbine Electrical Foreman

AC Electrical
05.2005 - 04.2010

Wind Turbine Electrical Installation

Ventus Energy Systems
09.2004 - 05.2005
Jake Behrman