Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Languages
Timeline
Summary
Generic

James Peppers

Live Oak

Summary

James has 36+ years of experience in Construction and Management. As a result of three decades of experience in this field, he has demonstrated his abilities with various management to successfully meet specific company goals in a positive and efficient way. His experience has given him a unique ability to motivate those individuals to be team players and for them to perform the duties assigned to them in a very proficient manner.

Overview

1
1
Certification

Work History

Project Superintendent

Irby Construction
  • Handled scheduling of subcontractors and staff to complete projects within required timeframes.
  • Conducted regular site inspections to assess progress, address issues, and maintain quality control throughout the project lifecycle.
  • Worked with inspectors, workers and client, to conduct weekly status updates for FPL
  • Monitored project milestones and adjusted scheduling to meet deadlines on Chipola and Fourmile sites.

Electrical Superintendent

TRC
  • Supervised crew of electricians and maintained safe, efficient and structured work environment.
  • Over seen electrical installations over two projects.
  • Evaluated job scope and determined necessary supplies, timelines, and projected expenses.
  • Managed performance evaluation and scheduling of electrical team members.

E&IC Construction Manager/ General Superintendent

Wood
  • Responsible for 3 projects located in Centertown Kentucky. Commissioned all the MCC's, VFD's , DCS system, motors, and all the package units within the 3 Building’s EIC of all construction and installation of Waste Water Treatment, Dewatering Gypsum and SDA System. Tracked all EC dates per turnover packages. Supported both the field craft and subcontractor with all drawings and documentations. Redlined all drawings and implemented them into the system on the completion of each project. Worked closely with EIC quality control to ensure all installation met OSHA/NEC standards. Coordinated loop checks, 3rd party inspections. Prepared EIP for LOTO program and lead all LOTO for all 3 Buildings.

E&IC Engineer/ E&IC Construction Manager

Wood
  • Responsible for 3 projects located in Charleston, Tennessee. Commissioned all the MCC's, VFD's , Delta V system, motors, and all the package units within the 3 plants EIC of all construction and installation of HDK-Reaction, HDK-Packaging and HCL generation. Tracked all EC dates per turnover packages. Supported both the general contractor and subcontractor with all drawings and documentations. Redlined all drawings and implemented them into the system on the completion of each project. Worked closely with EIC quality control to ensure all installation met OSHA/NEC standards. Coordinated loop checks, 3rd party inspections, and SIS testing. Prepared EIP for LOTO program and lead all LOTO for all 3 plants.

Electrical Superintendent

PCL Construction
  • Areas of responsibility include work with safety supervisor to identify and resolve HSSE issues involving direct forces. Conduct and confirm incident investigations. Hold General foreman and foreman accountability for all aspects of safety, construction, material management, and productivity. Risk, Opportunity, Obligation, understanding and familiarizing staff with contract documents and resolving disputes. Assisting in the development in project execution plan. Planning site logistics, work plans and project schedule. Monitor and execute project construction plan and schedule. Ongoing coordination and expediting of sit requirements via subcontracts, material, construction equipment and labor. Develop and ensure compliance with quality control plans for own forces and subcontract work. Conducting pre-punch inspections, final inspections and expediting follow up on deficiencies and warranty work. Verify material purchases, equipment and labor time keeping. Monitor and contribute to cost controls and forecasting. Maintain positive client relations. Mentor, coach and train field supervisor and personnel.

E&IC Engineer/ Coordinator

Hargrove Engineer
  • Responsible for 2 projects located in Charleston, Tennessee. Commissioned all the MCC's, VFD's , Delta V system, motors, and all the package units within the 2 plants EIC of all construction and installation of CS-reaction and HCL generation. Tracked all EC dates per turnover packages. Supported both the general contractor and subcontractor with all drawings and documentations. Redlined all drawings and implemented them into the system on the completion of each project. Worked closely with EIC quality control to ensure all installation met OSHA/NEC standards. Coordinated loop checks, 3rd party inspections, and SIS testing.

EIC Engineer / Coordinator

PCL Construction
  • Directed the Installation of VFD's coil induction heaters and the VFD's for all three Compressors and the associated instruments and controls and Fast Tim System. Directed and oversaw all the installation of power and controls and instrumentation's of the Big Bag Unloading Station and conveyor system. Directed the installation of the G201 MCC and all associated controls and profi-buss system and DCS cabinets to the interconnects and fiber optics to all charm boxes throughout CS reaction. Directed the installation of all lighting transformers and power panels associated with lighting thru out CS reaction. Worked closely with quality control to ensure all installation was installed per spec and Codes.

E&IC Superintendent

PCL Construction
  • Assembled electrical and electronic systems and prototypes according to engineering specifications and codes, using hand tools and measuring instruments. Maintain, troubleshoot, and repair electrical instruments according to plant specifications Lead a team to ensure all PM's were done in a safe and timely manner Highly skilled in electrical control systems Worked closely with quality control to ensure the installation was installed per job specifications and codes. Ensured all documentations and red lines were turned over to the customer in an efficiently manner.

Superintendent

CEC Construction
  • Managed staff, prepared work schedules and assigned specific duties Reviewed and interpreted plans, blueprints, site layouts, specifications, or construction methods to ensure compliance to legal requirements and safety regulations Inspected and monitored construction sites to ensure adherence to safety standards, building codes, and specifications Maintain daily logs and supplement records Train, directed and supervised other construction sites Inspected and monitored construction sites to ensure adherence to OSHA, ANSI and NEC codes.
  • Projects include but not limited to: cogeneration plants, combined cycle plants, juice plants, trash Burners, turbines: simple cycles, polysilicon plant, refineries, water treatment, high and low voltage terminations 15k and 5k, low voltage controls, instrumentation and DCS systems.

Education

High School Diploma -

Interlocking High
Interlocking FL.

Skills

  • Critical thinking
  • Project management
  • Project safety
  • Safety procedures
  • Quality control
  • Material procurement
  • Budgetary controls
  • Environmental awareness
  • Site inspections
  • Construction supervision
  • Effective written and verbal communication
  • Subcontractor supervision
  • OSHA trained

Accomplishments

  • Help Manage a construction budget of more than $[75,0000].
  • Led over 8 projects that were all completed within budget and on schedule.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Supervised team of 80 staff members.
  • Collaborated with team of 20 in the development of BREC.

Certification

  • OSHA 30 Training - [Timeframe]
  • NCER+ License - [Timeframe]

Languages

English
Full Professional

Timeline

Superintendent

CEC Construction

Project Superintendent

Irby Construction

Electrical Superintendent

TRC

E&IC Construction Manager/ General Superintendent

Wood

E&IC Engineer/ E&IC Construction Manager

Wood

Electrical Superintendent

PCL Construction

E&IC Engineer/ Coordinator

Hargrove Engineer

EIC Engineer / Coordinator

PCL Construction

E&IC Superintendent

PCL Construction

High School Diploma -

Interlocking High

Summary

  • Years of Experience 36+
  • Industries
  • EIC/Construction
  • Types of Facilities
  • Production Facilities
  • Power Plants
  • Paper Mills
  • Chemical Plants
  • Juice Plants
  • BESS System
  • Project management
  • Construction management
  • Front End Engineering
  • Solor
  • Project scheduling