Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jason Casillas

Wichita Falls,Texas

Summary

Motivated, adaptive, machine operator, with 10+ years experience, and a production technician with 5+ years experience. Highly skilled in machine troubleshooting, diagnosing, and repairing maintenance related issues. A proven track record of identifying and resolving quality control issues. A leader with project management experience, and a strong work ethic. Fast leaner with mechanic, electrical, plumbing, and carpentry knowledge. Ability to take apart and rebuild appliances

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

18
18
years of professional experience

Work History

Production Technician

Sealed Air Cryovac
09.2006 - 06.2023
  • Oversee,troubleshoot, diagnose, and complete rmaintenance related issues on up to 29 machines at a time for 12 hour periods.
  • Calibrated machines to maintain required productivity levels and adherence to quality standards.
  • Suggested and implemented new ideas to improve quality, reduce cost, and support production work environment.
  • Prioritize those repairs based on order mix and customer needs keeping a strong focus on safety, quality, and time management while reducing downtime on up to 50%.
  • Executed continuous improvement initiatives to streamline production processes.
  • Fix, align, and tighten/loosen belts/sensors on the conveyor system for smooth and consistent operation.

Concrete Worker

Perez concrete
06.2006 - 09.2006
  • Was hired for this job with no experience. 
  • Quickly learned how to frame and design the form for the given area. 
  • Use math to put the dimensions of the area being worked on, to figure out how much concrete to order. 
  • Find the best consistancy of concrete for the pour and the job to meet customers needs. 
  • Use a variety of trials to spread, smooth and finish the concrete to get the job done 

Pipe Layer

Bowles Construction
07.2005 - 06.2006
  • As the pipe laye, i started the day implementing 5s that i learned by getting all rhe shovels and tools needed for the day. 
  • Use hand signals to communicate with my escavator operator to let him know what I needed and how much.
  • Eyeball and estimate the grade of my ditch to ensure the levelness of the pipe I'm laying. 
  • Ensure the quality and placement of my joints so that there are no leaks. This is most important so that there are no future and costly repairs. 
  • Use a tape measure and level to install large valves (from 6"=36") and fire hydranrs. 

Education

Diploma -

Rider High School
Wichita Falls TX
05-2002

Skills

  • Analytical Skills
  • Creative Problem Solving
  • Maintenance and Repair
  • Training and Development

Timeline

Production Technician

Sealed Air Cryovac
09.2006 - 06.2023

Concrete Worker

Perez concrete
06.2006 - 09.2006

Pipe Layer

Bowles Construction
07.2005 - 06.2006

Diploma -

Rider High School
Jason Casillas