Seasoned Electrician bringing 19 plus years of experience in industrial construction. Expert project and team manager with deep understanding of safety, scheduling and codes.
Overview
15
15
years of professional experience
Work History
Substation Superintendent
Cinterra
11.2023 - Current
Reviewed plans and inspected ongoing construction to keep work in line with project goals.
Established successful procedures for day-to-day operations and long-term planning.
Managed complete construction process to maximize quality, cost-controls and efficiency.
Maintained safety onsite and upheld all OSHA regulations.
Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
Skilled at working independently and collaboratively in a team environment.
Worked effectively in fast-paced environments.
Identified issues, analyzed information and provided solutions to problems.
Process Electrician
Equinox Gold
12.2019 - 11.2023
Conducted preventive maintenance on equipment.
Installed new equipment and modified existing equipment.
Responded to fault and wiring issues, identifying hazards and problems.
Safely installed new electrical components, fixtures and motors in addition to testing systems to enhance power flow.
Inspected electrical equipment to assure it was operating correctly.
Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.
Prevented breakdown of systems by routinely inspecting and replacing old wiring and cleaning circuits.
Electrical safety and awareness teacher for all plant operators and staff.
E&I General Foreman
Wanzek Construction, Inc.
05.2019 - 11.2019
Supervised crew of electricians and maintained safe, efficient and structured work environment.
Monitored employee performance and adherence to job specifications to maintain quality standards and high client satisfaction.
Monitored employees to enforce safety and work performance standards.
Communicated with clients to assess needs, provide status reports ad inform of any potential delays.
Maintained detailed records of work activities and notable events.
Electrical General Foreman
TIC
03.2018 - 04.2019
Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes.
Demonstrated ability to assess risk and respond to issues appropriately.
Checked job sites for accuracy, quality and to ensure that all specifications for the project were met.
Identified problems and proposed solutions to management team.
Trained and led talented teams to surpass objectives.
Planned, organized and monitored resources to ensure efficient use of labor, equipment and materials.
Communicated clear expectations and goals to each team member.
15kv termination instructor
Electrical QA/QC
IES Commercial And Industrial
04.2017 - 01.2018
Completed precise measurements using special tools.
Performed visual inspections and non-destructive tests where appropriate.
Supervised a crew of electricians and maintained a safe, efficient and structured work environment.
Maintained positive relationships with all customers.
Used schematic diagrams to plan work.
Electrical Supervisor
Braun Electric
10.2016 - 04.2017
Installed, aligned, and balanced new equipment.
Communicated operational issues and changes to project manager on regular basis.
Safe and efficient testing of 35 kv lines .
Commissioning
Electrical Supervisor
Northern Electric Inc
08.2015 - 09.2016
Planned out of electrical system installation of conduit, wire, power distribution and motor controls.
Ensured the safety of electrical work and systems using test meters.
Read and interpreted electrical, mechanical and architectural drawings and electrical code specifications for wiring layouts.
Worked extended hours on weekday and weekend projects.
Updated service record files on equipment drawings and history.
Electrical Superintendent
Elsberry Contractors
01.2014 - 08.2015
Managed a team of up to 120 electricians, including performance evaluation and scheduling.
Evaluated job scope and determined necessary supplies, timelines and projected expenses.
Communicated with clients to assess needs, provide status reports ad inform of any potential delays.
Maintained job sites in compliance with all safety requirements.
Developed training methods for new electricians to align with company policies.
Completed quality assurance and compliance reviews for every job.
Scheduled projects and planned all required materials, tasks and team assignments.
Monitored employee performance and adherence to job specifications to ensure quality and client satisfaction.
Electrical Supervisor
Western Industrial
12.2011 - 01.2014
Performed load calculation for sizing wire and circuit protection.
Coordinated with vendors to identify and procure appropriate equipment necessary for the project.
Material purchasing
Bidding of electrical jobs.
Man hour unit rates and tracking
Medium voltage work
Medium Voltage Lead
AED
12.2010 - 10.2011
35kv terminations .
Ground resistance testing for all turbines.
VLF testing.
Followed standards and procedures to maintain safe work environment.
Consistently met deadlines and requirements for all wind farms.
Electrical Leadman
Aker Solutions
06.2009 - 12.2010
Installed, maintained and repaired electrical wiring, controls and lighting systems.
Inspected transformers and circuit breakers for malfunctions.
Interpreted drawings, wiring diagrams, flow charts and written descriptions of the project requirements.
Planned motor starter and control installations using codes and specs.
Measured devices, including analyzers, amp meters and volt-ohm meters.
Developed in-depth knowledge of arc flash ratings and standards.