Summary

Performance-driven construction supervisor /builder with 15+ years of comprehensive experience leading teams and operations. Outstanding blueprint and design interpretation and comprehension abilities with excellent communication, budgeting and project management talents. Extensive knowledge of construction sub-trades, construction materials and processes. Adept at managing and coordinating workers, performing various on-site activities, developing schedules and resolving any on-site issues. Construction is all I know and love and wish to continue my development as a person and professional.

Overview

16
16
years of professional experience

Work History

Project Forman

Cmd Endeavors
El Paso, TX
02.2024 - 12.2024
  • Build in residential subdivision installing 12” water main along with later services, fire hydrants and valves . Installed 8” pvc sewer along with casings, manholes and 4” pvc services to residents. Assembled and installed fittings, and valves of various sizes.
  • Pressure and mandrel test all sewer pipe lines installed. Hydrostatic test all water lines installed.
  • Ensured safe work environment by following safety protocols and conducting regular safety inspections on trench excavations . Use proper shoring for deep cuts and soil classification
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Directed projects according to schedule and quality demands.
  • Covered completed pipes with earth or materials and prepared sites for grading.
  • Displayed adaptability by seamlessly transitioning between various types of pipe materials, including PVC, steel, and concrete pipes.
  • Located existing pipes needing repair or replacement using magnetic or radio indicators.
  • Maintained accurate documentation of work completed, including measurements, materials used, and any deviations from initial plans.

Equipment Operator

Constructors Inc
Carlsbad, NM
09.2023 - 02.2024
  • Backfilled for mainline operation using a Cat 320 excavator.
  • Processed material and threw in lifts to spec .
  • Use a mini excavator/skidsteer to backfill for sidewalk and curb/gutter.
  • Maintained and cleaned equipment after each job and inspected. Monitored fuel, oil and water levels of heavy equipment.
  • Followed safety protocols while operating equipment. Adhered to instructions from supervisors and engineers onsite.
  • Operated range of heavy equipment on regular basis .
  • Loaded and moved materials such as dirt and rocks based on specific job needs.

Foreman

Sundt Construction
El Paso, TX
07.2023 - 09.2023

I-10 widening project

  • Form CIP Barrier walls to spec, Pour, strip and face new barrier for imperfections. Paving op, laid out string lines for metal forms using survey offsets. Install headers and support rebar subs in staging rebar deliveries with equipment.
  • Inspect rebar and go thru pre pour checklist, check concrete upon arrivals for right mix and times prior to pours.
  • Lined out the crew , made sure we are properly tooled daily for each operation. Oversaw daily operations at site, keeping team production moving at optimal pace. Prepared and submitted reports on job progress , safety conditions to upper management also tracked and submitted daily times.
  • Inspected completed work to verify quality standards and compliance with criteria. Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Coordinate with TXdot and all other oversight to ensure a great product .

General Foreman

Kiewit Infrastructure Co
Angel Fire, NM
10.2022 - 05.2023

State road NM 434

  • Formed poured and stripped foundations for an aluminum box culvert with 4 wing walls. Install culvert and wing walls over live running creek. Backfill and compacted to road sub-grade.
  • Fabricated gabion rock baskets with specialty air compressed tools to right dimensions. Install baskets in proper order , fill baskets with gabion rock close and secure. Tallest walls were 40’
  • Support bridge deck pours
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time. Worked alongside team to accomplish work goals according to schedule.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.

General Foreman

Kiewit Infrastructure Co
Kermit, TX
01.2021 - 10.2022

Winkler county 115-302 rehab

  • Formed, poured, stripped moment slab approach slabs, CIP coping, and barrier rail .
  • Excavated and installed for 2000’ of 24” RCP with manholes and inlets .
  • Build MOT signs , Execute MOT plan for TXdot and other oversight for road closures and lane changes
  • MOT throughout job was a daily routine, keeping job safe and organized.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions. Reviewed project details to specify correct materials and equipment for job site task.
  • Prepared and submitted reports on job progress and safety conditions to upper management daily.
  • Inspected equipment and tools used for safe operation.

General Foreman

Kiewit Infrastructure Co
Corpus Christi, TX
06.2019 - 12.2020

GCGV Exxon petrochemical plant

  • Worked nights hauling out day shift spoil piles and hauling in lime treated material for dayshift to continue backfilling. Excavated trenches and large footings. In charge of 1 D8 dozer, 1 349 excavator, 7 730 haul trucks, 2 bobcats.
  • Also cut v-ditch to grade, formed poured and stripped concrete v-ditch’s.
  • Mixed and Poured epoxy grout between foundations and modules.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals. Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Scheduled and supervised maintenance and repair of equipment, and grounds. Worked with specialized teams to accomplish all objectives and achieve goals. Highly strict safety culture had to adhere to .
  • Delivered project updates to superintendent and detailed issues that could halt work progress.

Foreman

Kiewit Infrastructure Co
El Paso, TX
05.2017 - 05.2019

Border west expressway project

  • Built forms for CIP coping and level up . Formed, poured and stripped coping and level up . Also F/P/S moment slab. Set coping on top of MSE walls using an 315 excavator with 2 way rigging setup. Mixed grout and set pedestrian rail up top of coping in areas .
  • Coordinate with subcontractors and other crews to maintain good access for concrete trucks.
  • Analyzed project blueprints and specifications for my operations. Delegated assignments based on plans, project needs, and knowledge of individual team members. Coordinated materials to maintain steady flow and meet productivity objectives.
  • Supervised field crews to maximize quality and work efficiency. Verified and submitted team timesheets.
  • Developed and implemented safety policies and procedures to establish clear guidelines for safe work practices and comply with regulations.

Foreman

Benning Construction Company
El Paso, TX
01.2016 - 05.2017

Wendy’s / Cinnabons new builds

  • Formed poured and stripped curb and gutter, build driveways and other landscaping (rock, mulch, planted trees).
  • Interior work included sheet rock, metal framing, FRP, installation of fixtures (false fireplace, bathroom stalls, mirrors)
  • Inspected completed work to verify quality standards and compliance with criteria.

Labor Carpenter

Carstensen Construction
Grand Forks, ND
10.2013 - 12.2015

500k gallon concrete water reservoir

  • Built a 120’ x 80’ double mat foundation 4 outside walls 15 ‘ tall, 1’ thick walls, 3 interior baffle walls and a lid with aluminum hatches and ladders
  • Installed metal water pipes and valves, backfilled and compacted to spec.
  • Built all CIP inlets , sidewalks, curb and gutter.
  • Alsoconcrete paved Main Street
  • Demonstrated close attention to detail to verify quality and accuracy of work. Planned and executed work with proper tools and materials to maximize productivity.

General Laborer

Sj Louis
Sacramento, CA
09.2008 - 07.2013
  • Built cast in place structures
  • Built forms with layouts for snap ties
  • Installed and tied all #9,10 rebar going vertically and horizontal.
  • Installed main line pipe (labor)
  • Backfill for mainline
  • Operate low-key in bore pit

Education

High School Diploma -

Chapin High School
El Paso, TX
05.2007

Skills

  • Bi-lingual
  • Fast learner
  • Safety Oversights
  • Dedicated Work Ethic
  • Critical Thinking
  • Judgment and Decision-Making
  • Effective Communication
  • Time Management
  • Attention to Detail
  • Site Supervision
  • Crew Safety Meetings
  • OSHA Regulations
  • Task Delegation
  • Leadership and Vision
  • Materials Take-Offs
  • Blueprint and Schematic Understanding
  • Foundation Construction
  • Framing, form setting, finish Carpentry
  • Concrete Finishing
  • Equipment operator 10 years
  • Hand and Power Tools
  • Physical Fitness

Timeline

Project Forman

Cmd Endeavors
02.2024 - 12.2024

Equipment Operator

Constructors Inc
09.2023 - 02.2024

Foreman

Sundt Construction
07.2023 - 09.2023

General Foreman

Kiewit Infrastructure Co
10.2022 - 05.2023

General Foreman

Kiewit Infrastructure Co
01.2021 - 10.2022

General Foreman

Kiewit Infrastructure Co
06.2019 - 12.2020

Foreman

Kiewit Infrastructure Co
05.2017 - 05.2019

Foreman

Benning Construction Company
01.2016 - 05.2017

Labor Carpenter

Carstensen Construction
10.2013 - 12.2015

General Laborer

Sj Louis
09.2008 - 07.2013

High School Diploma -

Chapin High School
Jason K Bond