Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

JAVIER RODRIGUEZ

Hidalgo,TX

Summary

Adept at equipment installation and fostering teamwork, I enhanced worksite safety and efficiency at INPRODUCTION, achieving significant process improvements. My expertise in power tools operation and adaptability in diverse conditions led to commendable project completions, underscoring my commitment to excellence and customer satisfaction. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Reliable individual with the desire to be physically challenged in construction environments. A skilled Scaffolder known for lending a hand wherever needed. Offering effective communication skills coupled to make quick decisions on the fly. Safety-conscious Scaffolder with a background building temporary stadium seating for sporting events. Willing to be challenged while taking on new responsibilities. Considered a valuable team player with organizational and time management skills.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Installation Technician/Lead Scaffold Builder

INPRODUCTION
05.2024 - 07.2024
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Actively participated in team meetings, contributing valuable input toward process improvements and increased productivity.
  • Diagnosed and troubleshot system faults, identifying equipment issues and resolutions.
  • Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Completed installations within deadlines, adhering to company policies and safety guidelines.
  • Worked with diverse types of weather and ground conditions.
  • Spread out articles or materials and examined for holes, tears and other defects.
  • Trimmed cut or torn fabric using scissors or knives and stitched trimmed edges together.
  • Evaluated equipment to determine if it needed to be repaired or replaced.
  • Followed all company guidelines regarding safety procedures when out in field.
  • Assembled and disassembled tiered seating for public events.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.

Journeyman Scaffold Builder

BrandSafway
03.2024 - 04.2024
  • Maximized client satisfaction by promptly addressing their concerns regarding scaffold design or placement during construction projects.
  • Enhanced safety measures by conducting regular inspections and maintenance checks on scaffolding equipment.
  • Maintained a clean worksite to minimize hazards and ensure compliance with OSHA regulations.
  • Completed projects within deadline by prioritizing tasks, managing resources, and addressing potential issues proactively.
  • Streamlined the construction process by collaborating closely with other trades involved in the project, such as electricians, painters, and carpenters.

Journeyman Scaffold Builder

BrandSafway
10.2023 - 11.2023
  • Increased worker productivity by consistently providing secure platforms for various construction tasks.
  • Conducted thorough inspections of erected scaffolds to guarantee stability and compliance with safety regulations.
  • Showcased expertise in rigging equipment use, ensuring safe lifting procedures during material handling processes.
  • Contributed to company reputation for excellence in service with consistent attention to detail when assembling complex scaffold configurations.

Journeyman Scaffold Builder

BrandSafway
08.2023 - 09.2023
  • Garnered recognition for exceptional craftsmanship through the consistent delivery of high-quality scaffold construction within allotted time frames.
  • Conducted thorough inspections of erected scaffolds to guarantee stability and compliance with safety regulations.
  • Enhanced job site safety by meticulously constructing and dismantling scaffolding structures according to industry standards.
  • Demonstrated versatility in constructing diverse types of scaffolds such as suspended, rolling, tube-and-coupler systems for various projects needs.
  • Maintained a clean and organized work area, contributing to a safe and efficient job site for all personnel.

Remodeling Carpenter

South West Renovation Elite Llc.
04.2022 - 07.2023
  • Reduced material waste with precise measurements and efficient use of resources during woodworking tasks.
  • Streamlined project timelines by effectively delegating tasks to team members based on individual strengths.
  • Expedited project completions by accurately estimating labor requirements for each job site assignment.
  • Implemented innovative carpentry techniques to improve efficiency while maintaining superior results.
  • Demonstrated versatility in handling diverse remodeling projects including kitchens, bathrooms, home additions, decks, and flooring installations.
  • Elevated client satisfaction rates with clear communication throughout the remodeling process, addressing concerns promptly and professionally.

Journeyman Scaffold Builder

Excel Modular Scaffold
07.2019 - 02.2020
  • Increased worker productivity by consistently providing secure platforms for various construction tasks.
  • Garnered recognition for exceptional craftsmanship through the consistent delivery of high-quality scaffold construction within allotted time frames.
  • Conducted thorough inspections of erected scaffolds to guarantee stability and compliance with safety regulations.
  • Enhanced job site safety by meticulously constructing and dismantling scaffolding structures according to industry standards.

Journeyman Scaffold Builder

Apache Industrial Services
10.2018 - 06.2019
  • Conducted thorough inspections of erected scaffolds to guarantee stability and compliance with safety regulations.
  • Showcased expertise in rigging equipment use, ensuring safe lifting procedures during material handling processes.
  • Enhanced job site safety by meticulously constructing and dismantling scaffolding structures according to industry standards.
  • Increased worker productivity by consistently providing secure platforms for various construction tasks.
  • Ensured project deadlines were met by coordinating with contractors on scaffold requirements.

Scaffold Foreman

Turner
05.2018 - 09.2018
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Maintained accurate inventory of materials, ensuring timely delivery to job sites and minimizing downtime.
  • Maximized crew productivity by effectively delegating tasks based on individual strengths and abilities.
  • Collaborated with project managers to develop detailed plans for scaffolding requirements, ensuring proper support for construction projects.
  • Increased customer satisfaction levels by successfully handling client concerns and providing timely updates on project progress.
  • Enhanced worksite safety by conducting thorough inspections and addressing potential hazards.
  • Inspected scaffold erections for condition and compliance with standards.
  • Improved scaffold stability with diligent inspection of connections, supports, and bracing systems.
  • Decreased accidents on the job site by enforcing strict safety protocols and providing ongoing training for team members.
  • Verified all scaffolding materials were stored safely and securely.
  • Built custom scaffolding structures to specifications for diverse applications.
  • Inspected scaffolding for safety and structural integrity before each use.

Journeyman Scaffold Builder

BrandSafway
02.2018 - 03.2018
  • Demonstrated adaptability in responding to varied work conditions including extreme heights or tight spaces while maintaining high performance standards.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
  • Verified all scaffolding materials were stored safely and securely.
  • Followed OSHA regulations and safety standards when installing and working with scaffolding.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.

Journeyman Scaffold Builder

T.G.E
03.2017 - 02.2018
  • Ensured project deadlines were met by coordinating with contractors, architects, and engineers on scaffold requirements.
  • Conducted thorough inspections of erected scaffolds to guarantee stability and compliance with safety regulations.
  • Showcased expertise in rigging equipment use, ensuring safe lifting procedures during material handling processes.
  • Enhanced job site safety by meticulously constructing and dismantling scaffolding structures according to industry standards.
  • Demonstrated versatility in constructing diverse types of scaffolds such as suspended, rolling, tube-and-coupler systems for various projects needs.
  • Streamlined material transport by setting up hoists, netting, planks, and guardrails in strategic locations around scaffolding structures.
  • Maintained a clean and organized work area, contributing to a safe and efficient job site for all personnel.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Verified all scaffolding materials were stored safely and securely.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Built custom scaffolding structures to specifications for diverse applications.
  • Inspected scaffolding for safety and structural integrity before each use.

Education

High School Diploma -

Lyford High School
Lyford, TX
05.1991

Skills

  • Equipment Installation
  • Power Tools Operation
  • Worksite safety
  • Customer Service
  • Outdoor installations
  • Work Inspection
  • Basic Carpentry
  • Following safety practices
  • Teamwork and Collaboration
  • Time Management
  • Self Motivation
  • Adaptability

Certification

  • Scaffolding Certification NCCER,- 3/7/2017

Languages

English
Full Professional
Spanish
Professional Working

Timeline

Installation Technician/Lead Scaffold Builder

INPRODUCTION
05.2024 - 07.2024

Journeyman Scaffold Builder

BrandSafway
03.2024 - 04.2024

Journeyman Scaffold Builder

BrandSafway
10.2023 - 11.2023

Journeyman Scaffold Builder

BrandSafway
08.2023 - 09.2023

Remodeling Carpenter

South West Renovation Elite Llc.
04.2022 - 07.2023

Journeyman Scaffold Builder

Excel Modular Scaffold
07.2019 - 02.2020

Journeyman Scaffold Builder

Apache Industrial Services
10.2018 - 06.2019

Scaffold Foreman

Turner
05.2018 - 09.2018

Journeyman Scaffold Builder

BrandSafway
02.2018 - 03.2018

Journeyman Scaffold Builder

T.G.E
03.2017 - 02.2018

High School Diploma -

Lyford High School
JAVIER RODRIGUEZ