Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jeffery Mills

Sapulpa

Summary

To contribute to a safe and reliable pipeline operation by utilizing over decades of experience in pipeline inspection, maintenance, and integrity management, with a strong commitment to minimizing downtime and ensuring regulatory compliance. Seeking a position that leverages my expertise in design, construction management, and risk assessment to drive project efficiency, safety, and sustainability. To obtain a position where I can apply my training in mechanical systems, safety compliance, and field maintenance to support efficient and environmentally responsible energy transport.

Overview

19
19
years of professional experience

Work History

Third Party Inspector

Natural Energy Field Services
Sioux Falls
06.2026 - 06.2026
  • Inspection of flange facing and internal piping on a valve change out at PIG Launcher/Receiver, after pigging of 3.6 of 30" and extraction of PIG.
  • Visual and Documentation of 3 torques.

Third Party Inspector

Natural Energy Field Services
El Paso
06.2026 - 06.2026
  • Conducted structural inspections on fabricated equipment to ensure compliance with specifications.
  • Verified equipment construction accuracy according to provided prints.

Quality Analyst Inspector

Parfab Industries INC
Inola
08.2018 - 04.2019
  • All related responsibilities; verifying quality of weld; structural and piping dimensions to prints
  • Calling for NDE;
  • PKG Development and turn in';
  • Testing of welders
  • Application of processes and procedure;
  • Wire ID
  • Logging and data of all pertinent info
  • Reporting to Mark Coday and meetings

Turnaround Coordinator

Holly Refinery
TULSA
01.2018 - 03.2018
  • Responsible for ensuring AB insulation was removed
  • UT's were done at cut point
  • Lead removal
  • Scaffold erected for piping jobs in shutdown before work start
  • Oversaw and directed work to accomplish T/A on time
  • Ensured contractors had all relevant revs and information verifying integrity and compatibility of work
  • Ordered all necessary materials for completion of work
  • Daily progress reports to T/A manager
  • Assisted in planning and procurement
  • Assisted in added scope and walkdowns

Inspector

ParFab
Inola
10.2017 - 11.2017
  • Inspector for a reformer retube job at Pryor Chemical
  • 90% of work was SS and required great deal of NDE per ITPS procedures 100 percent VT, PMI and RT.
  • 10% - 100, PT
  • Building packages for all work performed

Field Service Coordinator

Holly Refinery
TULSA
07.2017 - 09.2017
  • Responsible for learnings, identifying piping scope and reporting of daily scope
  • Mediation between contractor and support contractors
  • Manage scheduling of packages to work during turnaround phases (walking and buying turnover packages)
  • Ensuring contractors has all relevant packages and revisions.

Licensed Pipefitter

TIC Construction
Chouteau
09.2016 - 12.2016
  • Installation of stainless steel Vick/press piping scope and reporting of daily scope.
  • Installation of carbon water utilities and all supports like such

Field Service Coordinator

HOLLY REFINERY
Carver
11.2015 - 03.2016
  • Responsible for learning, identifying piping scope and reporting of daily scope.
  • Mediation between contractor and support contractors.
  • Manage scheduling of packages to work during turnaround phases (walking and buying turnover packages).
  • Ensuring contractor has all relevant packages and revisions.

Planner/Progress Tracker/QA/QC

Strategic Contract Resources
Acworth
02.2015 - 10.2015
  • Working in capital group for CVR Energy at Wynnewood Refinery.
  • Received estimates on capital projects and converted estimates to tracking sheets for daily progress.
  • Assigned electronically P.O.s to contractors for work being done.
  • Daily contact with craft coordinators to ensure accuracy.

Superintendant/QC

Northstar Energy Services
Holyoke
11.2014 - 02.2015
  • Responsible for getting pipe erected, QC direction to input data clerk.
  • Redlines and all other relative activities associated QC/Piping production, hydro's and piping documentation/system turnovers.

QC/QA-Civil and piping

Northstar Energy Services
Cotulla
09.2014 - 11.2014
  • Verification of all concrete pours and packaging.
  • All welder testing and piping weldments and packaging.
  • Final systems buyoff and turnover documentation.

QC Inspection

Performance Contractors
Meridian
01.2014 - 05.2014
  • STO walk down and NDE walk downs to sell to client.
  • Pre and Post hydro.
  • Integrity of physical piping package.

General Foreman

J.V. Industrial Companies
Ardmore
10.2013 - 11.2013
  • Constructed new LPG distribution piping in refinery.
  • Responsible for time completion. Finished ahead of schedule.

Foreman

Blackburn Construction
Tulsa
07.2013 - 09.2013
  • Construction of $7 million new light ends.
  • Plant and Runoff water tank and piping system.
  • Held a lot of responsibility from overseeing piping, walking down and verifying process piping, to working hands-in-hand with QC.

Foreman

P2S
Salt Lake City
02.2013 - 05.2013
  • Shutdown, Alky unit, Tesoro Refinery.
  • Responsible for pre-turnaround fab shop, verification of piping systems, opening up new work, walk down of systems Hydro's, turnover, selling completed work packages.
  • Heavy QC involvement. Job completed ahead of schedule.

Progress Tracker

Wynnewood Ok., S.C.R. Inc.
Wynnewood
09.2012 - 11.2012
  • Tracking progress of work activities through duration of shutdown.
  • For input into Primevera software. Information used for scheduling and manpower meetings.

Piping Superintendent

PSI Inc.
Carlsbad
06.2012 - 11.2012
  • New construction of Amine and Methanizer gas Plant.
  • Responsible for all piping related functions; working off of P&IDs.
  • Field routing, materials, planning, organizing, redlining, manpower reqs., progress tracking, reporting, estimating, quality, pipe meetings and flow of work.
  • Doubled productivity through duration of project.

General Foreman

RCI Contractors
LaPlace
12.2011 - 06.2012
  • Oversaw four Foremen and related crews.
  • Responsible for all piping related functions, under Superintendent.
  • Set records for piping spools installed, diameter inches of weld and overall productivity.
  • Lead safety training and progress of projects with documentation.

Piping Foreman

RCI
Tulsa
12.2010 - 07.2011
  • Piping connections of Holly's two refineries, separated by highway and railroad (16"and 2" pipe).
  • Ran fab shop and fabricated piping for runs. Supervised construction and tie-ins.

Lead Pipefitter

JV
Enid
10.2010 - 11.2010
  • Shutdown at Terra Nitrogen Plant.

Lead Pipefitter

P2S
Catoosa
09.2010 - 10.2010
  • Shutdown at Terra Nitrogen Plant.

Pipefitter

Repcon
Woodward
05.2010 - 08.2010
  • Terra Nitrogen Plant-Construction of new ISBC unit.

Piping Manager

Jackson & Jackson
Vicksburg
04.2010 - 05.2010
  • Lube and oil piping and high/low pressure steam hookups on three new installed steam turbines.

Pipefitter

P2S
Salt Lake City
12.2009 - 03.2010
  • Tesoro turnaround and pre-down. Repipe new reactors and associated piping.

Piping Foreman

OCE Mechanical
Tulsa
09.2009 - 12.2009
  • Worked Mechanical piping for new six story building.

Piping Foreman

P2S
Martinez
05.2009 - 08.2009
  • Shell refinery shutdown from new plenums and flooring, all new piping to two exiting heaters.

Project Lead Pipefitter

O.C.E. Mechanical LLC
Tulsa
12.2008 - 03.2009
  • Lead fitter/welder on specific piping projects. Including steam header, gas piping and heating/cooling water.

Piping Foreman

Tuner Industries
Rawlins
10.2008 - 11.2008
  • Supervised construction and installation of transfer lines for new heater install at Sinclair refinery, as well as new oil & steam piping to unit.

Lead Pipefitter

JV Industrial
Skiatook
09.2008 - 11.2008
  • Lead fabricator at JV's pipe shop. Fabricated piping spools according to ISO's.

General Foreman/Piping

PMSI Inc.
Costa Mesa
02.2008 - 07.2008
  • All facets of hands-on supervision and administrative in pipe routing and engineering in 750 megawatt power plant scrubber rebuild.

Lead Pipefitter

JV Ind.
La Porte
01.2008 - 02.2008
  • Shutdown in El Paso, TX. Ran two new 24" std. carbon cooling water lines in rack.

Lead Pipefitter

Wanzek Construction
Fargo
11.2007 - 12.2007
  • Lead Pipefitter on a Bio-diesel plant in Guymon Ok., Piped major portion of pre-treat facility and hydro/air tests of finished piping.

Lead Pipefitter

JV Ind.
La Porte
09.2007 - 11.2007
  • Shutdown at Terra Nitrogen Plant. Relined 101 boilers, installed and demo'ed other piping.
  • Over saw crew and related functions.

Lead Pipefitter

Wanzek Construction
Fargo
05.2007 - 07.2007

Licensed Pipefitter

Industrial Tradesmen
Jenks
06.2017
  • Installed supports
  • Punch out of work

Lead Pipefitter

P2S
Stockton
05.2009
  • Tube & Value replacement and general maint. Responsibilities.

Pipe Foreman

P2S
Sugarland
08.2007
  • Shutdown at Terra Nitrogen. Over saw crew. Related functions and installed new liners on boilers and demo/installation of piping.

Education

Bachelor of Science - Management

Western Intl. University
Phoenix, AZ

Certificate - Project Management

Villanova University
Tampa, FL

Skills

  • Workflow Regulation
  • Pipefitting
  • Welding
  • QA/QC
  • NDT testing
  • Project Management
  • Lean Six Sigma

Timeline

Third Party Inspector

Natural Energy Field Services
06.2026 - 06.2026

Third Party Inspector

Natural Energy Field Services
06.2026 - 06.2026

Quality Analyst Inspector

Parfab Industries INC
08.2018 - 04.2019

Turnaround Coordinator

Holly Refinery
01.2018 - 03.2018

Inspector

ParFab
10.2017 - 11.2017

Field Service Coordinator

Holly Refinery
07.2017 - 09.2017

Licensed Pipefitter

Industrial Tradesmen
06.2017

Licensed Pipefitter

TIC Construction
09.2016 - 12.2016

Field Service Coordinator

HOLLY REFINERY
11.2015 - 03.2016

Planner/Progress Tracker/QA/QC

Strategic Contract Resources
02.2015 - 10.2015

Superintendant/QC

Northstar Energy Services
11.2014 - 02.2015

QC/QA-Civil and piping

Northstar Energy Services
09.2014 - 11.2014

QC Inspection

Performance Contractors
01.2014 - 05.2014

General Foreman

J.V. Industrial Companies
10.2013 - 11.2013

Foreman

Blackburn Construction
07.2013 - 09.2013

Foreman

P2S
02.2013 - 05.2013

Progress Tracker

Wynnewood Ok., S.C.R. Inc.
09.2012 - 11.2012

Piping Superintendent

PSI Inc.
06.2012 - 11.2012

General Foreman

RCI Contractors
12.2011 - 06.2012

Piping Foreman

RCI
12.2010 - 07.2011

Lead Pipefitter

JV
10.2010 - 11.2010

Lead Pipefitter

P2S
09.2010 - 10.2010

Pipefitter

Repcon
05.2010 - 08.2010

Piping Manager

Jackson & Jackson
04.2010 - 05.2010

Pipefitter

P2S
12.2009 - 03.2010

Piping Foreman

OCE Mechanical
09.2009 - 12.2009

Piping Foreman

P2S
05.2009 - 08.2009

Lead Pipefitter

P2S
05.2009

Project Lead Pipefitter

O.C.E. Mechanical LLC
12.2008 - 03.2009

Piping Foreman

Tuner Industries
10.2008 - 11.2008

Lead Pipefitter

JV Industrial
09.2008 - 11.2008

General Foreman/Piping

PMSI Inc.
02.2008 - 07.2008

Lead Pipefitter

JV Ind.
01.2008 - 02.2008

Lead Pipefitter

Wanzek Construction
11.2007 - 12.2007

Lead Pipefitter

JV Ind.
09.2007 - 11.2007

Pipe Foreman

P2S
08.2007

Lead Pipefitter

Wanzek Construction
05.2007 - 07.2007

Bachelor of Science - Management

Western Intl. University

Certificate - Project Management

Villanova University
Jeffery Mills