Dedicated pipe layer with extensive experience at Bakers Construction Service, skilled in pipe installation and trenching operations. Proven ability to operate heavy equipment safely while fostering positive working relationships. Successfully minimized project delays through effective problem-solving and adherence to safety regulations, ensuring efficient construction site operations.
Ran front end loader, skid steer, laid pipe, water, sewer and storm drains, done a little bit of grade work, loaded trucks-rock boxes etc, moved dirt with loaders.
Pulled pipe up hill with tractors, ran pipe presses, worked orders and bundled pipe, crane helper.