Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Certification
Training
Languages
Timeline
Generic

JEREMY SERRANO

BAYTOWN,TX

Summary

Over 18 years of experience working in the Industrial/Chem. Construction Field, as Pipe fitter/fabricator / Foreman/Coordinator Supervisor. Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 10 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.Personable Realtor with exceptional marketing skills and property sales background. Enthusiastic professional with drive and determination to succeed in new residential and business development. Excellent communicator skilled at relating with people at all levels and offering flexibility of working well on teams or individually.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Residential Realtor

JPAR The Sears Group
Houston, TX
Current - Current
  • Ensured timely completion of necessary paperwork, coordinating with various parties throughout transactions for seamless progress towards closing dates.
  • Educated clients about local neighborhoods, schools, amenities, and community features relevant to their housing search criteria.
  • Wrote contracts to outline sales and purchases of properties.
  • Assisted first-time homebuyers in navigating the complexities of the purchasing process, resulting in a smooth transaction experience.
  • Compared recently sold area properties to determine competitive market prices.
  • Arranged for inspections and surveys of sold properties.
  • Performed home evaluations and developed competitive market analysis for individual homes.

Aerospace/Space X Field Supervisor

STI Group
Texas
02.2024 - Current
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Monitored workflow to improve employee time management and increase productivity.
  • Maintained records and logs of work performed and materials and equipment used.
  • Implemented best practices and safe operating procedures.
  • Conducted thorough quality assurance checks on completed work, ensuring compliance with industry standards and client requirements. Assisted with Laser fitments
  • Enhanced site safety by implementing strict safety protocols and conducting regular inspections.
  • Achieved timely completion of projects by coordinating with contractors and ensuring adherence to schedules.
  • Guided employees and contractors in task completion, offering assistance to meet tight deadlines.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Improved construction project efficiency by effectively managing resources and overseeing site operations.
  • Performed risk assessments throughout the project duration to identify potential hazards or obstacles that could affect progress or success.
  • Liaised with subcontractors regarding work progress.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Collaborated effectively with project managers to ensure seamless integration of piping systems into larger construction initiatives, ensuring timely completion of all work.
  • Facilitated smooth operations by efficiently organizing daily work schedules according to client requirements and project deadlines.
  • Maintained open lines of communication with clients throughout the duration of each project, providing updates on progress and addressing any concerns promptly and professionally.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Directed projects according to schedule and quality demands.

Piping Dept. Field Coordinator

PLC Construction
Old Town, Maine & Fort Wayne, Indiana
03.2023 - 11.2023
  • Implemented safety protocols during construction projects, ensuring a safe work environment for all team members.
  • Reviewed engineering drawings for accuracy and compliance with industry standards, minimizing errors in final product installations.
  • Improved project timelines by streamlining communication between various departments involved in pipeline construction efforts.
  • Spearheaded efforts to troubleshoot complex issues related to piping systems, leading to resolution and optimized system performance.
  • Contributed valuable insights during pre-construction phases, refining project scope and expectations for successful outcomes.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.

Journeyman Pipefitter

WorleyParsons
Exxon Baytown TX
01.2022 - 01.2023
  • Fabricated, assembled, installed and maintained piping systems.
  • Ensured safe work environments by strictly adhering to industry safety standards and procedures.
  • Completed complex projects on time through efficient time management and prioritization of tasks.
  • Prevented potential delays in construction schedules by proactively identifying potential hazards or obstacles in the workspace.
  • Established strong working relationships with colleagues across trades for better collaboration during multi-disciplinary projects.
  • Reduced material waste by accurately measuring, cutting, and assembling piping systems.
  • Improved project efficiency by skillfully reading and interpreting blueprints, plans, and specifications.
  • Coordinated movement of materials and equipment to job sites.
  • Increased client satisfaction by maintaining clear communication regarding project progress and addressing concerns promptly.
  • Supervised [Number] apprentices and offered specific recommendations to improve work quality.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Connected piping systems to water heaters, boilers, pumps and auxillary equipment to complete installations.

Pipefitter

REF- CHEM IND.
05.2019 - 03.2020
  • Performed various installs and fabrication, walk downs & shutdown work with operations on heaters, flare lines, pipe racks, pumps, and boilers
  • Installed new construction skids, piping supports, and bolt up of 1" up to 24" lines
  • Communicated daily with operations for permits & daily weekly production along with supervision.

Pipefitter

Performance
06.2018 - 03.2019
  • Performed various installs and fabrication, hydro testing, commissioning completion of several packages & isometric drawings to be sold off to client.

Pipe Foreman

Force Corp.
02.2018 - 05.2018
  • Oversee 16 man crew day to day production of fabricating piping for pumps, tank, condensers, chillers, and compressors as well as all piping to & from each vessel
  • Also oversaw cooling water piping & brine piping and all fabrication
  • Received permits from operations and communicated with supervision & engineers on a daily basis
  • Ensured safety was a priority as well as production & craftsmanship.

Pipefitter

Optimized Process Designs
03.2016 - 01.2017
  • Performed various fabrication of 30" up to 112" pipe for propane dehydration unit at Enterprise new facility
  • Also performed various installs of valves and supports.

FabShop Foreman

STI Group
07.2015 - 02.2016
  • Oversee day to day production of fabrication for Capital Maintenance Preturnaround & Turnaround
  • Ensured quality production and safety by following correct and safe procedures
  • Also supervised weld procedures.

Pipe fitter

KBR
11.2014 - 07.2015
  • Performed various installs & fabrications, hydrotest, air test, punchlist completion of several packages for new dual super heaters at Lyondell Channelview facility.

Pipefitter Craftsman

Performance contractors
09.2014 - 11.2014
  • Fabricated spools, cut, grind, and weld pipe spools to specs, per isometric drawings & P&IDs.

Fitter/Fabricator

Force Corp.
01.2014 - 08.2014
  • Installed spools
  • Fabricated welds
  • Ground install skids torque boltup
  • Cut and grind weld to various metal pipe/spools.

Pipefitter

KBR
05.2013 - 10.2013
  • Installed various spool, pumps valves, supports dummy legs, as per isometric drawings
  • Hydrotested various installed lines
  • Fabricated spools as per RFis
  • Cut, grind, fit and weld various pipe carbon steel.

Operator

Coastal Welding Supply
01.2011 - 04.2013
  • Start up and shut down of all high pressure oxygen pumps and liquid argon, oxygen, nitrogen, pumps and manifolds
  • Oversee all shipping and receiving
  • Followed OSHA rules and regulations
  • Forklift operator, shipping receiving supervisor warehouse supervisor
  • Loading & unloading of trucks for daily deliveries
  • Sales.

Fabricator

Tellepson Industrial
11.2009 - 01.2011
  • Installed spools
  • Fabricated welds
  • Grind prep fit & install skids torque boltup
  • Cut and ground weld to various metal and pipe/spools.

Machine Assembler Engine AssembleFitter/Fabricator

LWL inc.
12.2008 - 11.2009
  • Completed N.E.R.D
  • Project at Exxon Mobil
  • Fabricated pipe spools, Hydro tested various lines
  • Provided QC to various welds
  • Inspected completed work done as per engineered ISO drawings and specs.

Driver/Service Tech

Inergy Propane
06.2008 - 12.2008
  • Delivered propane to chemical and residential properties
  • Installed gas lines inspections on call service and running service calls
  • Followed OSHA rules and safety regulations.

I & R Technician

Volt
08.2005 - 01.2008
  • Installed, repaired, troubleshot, on telephone lines aerial and underground
  • Maintained & performed safe work habits
  • Performed QC on various installs and maintenance work
  • Inspected parts and connections for quality standards
  • Completed all documents as necessary using data entry in network: database.

Education

Real Estate

Champions School of Real Estate
Houston, TX
2017

Vocational-Technical Education

Lee College
09.1998

High School Diploma/GED -

Ross S Sterling
Baytown, Texas
05.1998

Skills

  • Database Software (Oracle, Access, etc)
  • Data Entry Terminal (PDT, Mainframe Terminal, etc)
  • EMail Software (Outlook, Thunderbird, etc)
  • Internet Browser (Internet Explorer, Firefox, etc)
  • Personal Computers
  • Utility Software (Virus, File Compression, etc)
  • Word Processing Software (Word, WordPerfect, etc)
  • Listing Presentation
  • Buyer Representation
  • Property Management
  • Local Area Knowledge
  • Site coordination
  • Pipe Laying Techniques
  • Team Management
  • Job Site Organization
  • Welding Techniques
  • Project Coordination
  • Piping design
  • Final inspections
  • Inspection Coordination
  • Documentation Review
  • Blueprint Interpretation
  • Computer-Aided Design
  • Dependable and Hardworking
  • Construction safety
  • Multi-Project Coordination
  • Project Planning
  • Team Leadership
  • Effective Communication
  • Quality Assurance
  • Project Management
  • Field Operations
  • Schedule Coordination
  • Operations Planning
  • Task Delegation
  • Quality Control

Accomplishments

Provide detailed planning packages, schedule updates and progressing, and coordinating
services to support multiple sometimes simultaneous projects.
 Support and assist my Project managers in maintaining constant continuity on their projects and
assist in developing change orders and detailed scope orders for project unforeseeable
resolution.
 Support project engineers, and project managers to develop conceptual and detailed planning
packages, required BOM’s, RFI submittals, and execution overwatch to ensure no further
duration delays.Estimating, Planning, Scheduling, Coordinating, Tracking Cost, and Forecasting.
 Responsibilities also included managing our specialty T/A projects group. Ensuring successful
execution of client defined SOW for stationary and rotating equipment, piping, labor, and
materials. Estimated, Clarified, and Managed projects which included fabrication, pre-down
responsibilities, execution phase, and start-up support.

Certification

  • Basic Plus Certification Houston Safety Council
  • TWIC Registration Homeland Security

Training

  • Process tech., Lee College
  • TX Realtor, Champions School of Real Estate, 08/01/2013, 08/01/2014

Languages

English
Full Professional
Spanish
Native or Bilingual

Timeline

Residential Realtor

JPAR The Sears Group
Current - Current

Aerospace/Space X Field Supervisor

STI Group
02.2024 - Current

Piping Dept. Field Coordinator

PLC Construction
03.2023 - 11.2023

Journeyman Pipefitter

WorleyParsons
01.2022 - 01.2023

Pipefitter

REF- CHEM IND.
05.2019 - 03.2020

Pipefitter

Performance
06.2018 - 03.2019

Pipe Foreman

Force Corp.
02.2018 - 05.2018

Pipefitter

Optimized Process Designs
03.2016 - 01.2017

FabShop Foreman

STI Group
07.2015 - 02.2016

Pipe fitter

KBR
11.2014 - 07.2015

Pipefitter Craftsman

Performance contractors
09.2014 - 11.2014

Fitter/Fabricator

Force Corp.
01.2014 - 08.2014

Pipefitter

KBR
05.2013 - 10.2013

Operator

Coastal Welding Supply
01.2011 - 04.2013

Fabricator

Tellepson Industrial
11.2009 - 01.2011

Machine Assembler Engine AssembleFitter/Fabricator

LWL inc.
12.2008 - 11.2009

Driver/Service Tech

Inergy Propane
06.2008 - 12.2008

I & R Technician

Volt
08.2005 - 01.2008

Real Estate

Champions School of Real Estate

Vocational-Technical Education

Lee College

High School Diploma/GED -

Ross S Sterling
JEREMY SERRANO