Summary
Overview
Work History
Skills
Certification
Languages
Timeline
Generic

Joel A. Anzor

Bakersfield,California

Summary

Seeking an opportunity to apply my pile, mechanical, logistics, and module know-how and solar construction experience with an organization that will allow me to contribute long term. Completed projects ranging on both sides of the scale from small single-MW jobs all the way up to a 350MW and everything in between. Motivated by a strong desire to complete projects safely, on time and on budget without cutting corners. If giving the opportunity I would bring my 10yrs of industrial solar/utility scale solar experience to the table as well as have all the connections and resources i gathered to add value as a team.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Construction Superintendent

Juwi
07.2024 - Current
  • JSI_X1 system 180MW
  • Managed subcontractors effectively, ensuring timely completion of tasks and high-quality workmanship.
  • Drove project objectives on day-to-day operational level by working closely with clients, decision-makers and vendors.
  • Delivered projects ahead of schedule by developing efficient construction processes and coordinating teams effectively.
  • Enhanced safety on job sites by conducting regular inspections and enforcing compliance with OSHA regulations.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Increased customer satisfaction by maintaining open lines of communication, addressing concerns promptly, and ensuring quality work throughout the project lifecycle.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.

Mechanical Superintendent

Rosendin Electric
12.2022 - 07.2024
  • 260MW NexTracker Horizon Gen- 1 system
  • Management over Pile subcontractor
  • Direct p.o.c and subcontractor coordinator
  • Providing environmental, logistical, and safety support internally or through our vendors
  • Continuous updates with schedule, material health checks, production and quality reports
  • Established internal and external meetings pertaining to RFI, site/field impacts, manpower quality, schedule, reviewing contracts and site specifics, Three week look ahead and conducting office, teams, or zoom meetings with sub, internal and external as needed
  • Coordinate between subcontractor and engineers to assure all specs are met and inspections meet qualifications
  • Coordinated with clients on final walks and sign offs pertaining to piles and rack
  • Management over mechanical Subcontractor
  • Coordinate with NXT CM site rep with all site inspections, NCR's, CDR's, material inspections, counts, material handling, material matrix , quarantine zones, and RFI's
  • Management of all site dumpster 13 total
  • Management over recycling vender for our Pallets, glass, aluminum, copper, and steel
  • Manage our self performing pile pull testing team and can effectively test up to 40 tests at 3 tests types per pile
  • Helped establish local support for module offloading and established a organized flow with our stage teams
  • Time and cost code entry both / non union

Asst. Superintendent - Piles/Mechanical/Logistics

SOLV Energy
11.2022 - 12.2022
  • 75MW NexTracker Gen-1 system
  • Support mentor and train GF's and foreman to maintain top safety environment around every scope assigned directly and indirectly
  • P.O.C for 2 projects at the same time
  • All mechanical and pile coordination regarding manpower, equipment, deliveries, scheduling, hiring and training
  • Directed temp agency in the direction where support was needed
  • Utilized Sunscreens to log and document daily field progression , field impacts and punch items lists
  • Gave 2 week look ahead for production teams
  • Strong focus on assuring pile install sub contractor finished on schedule
  • 150MW ATI Gen-2 system
  • Helped hire 3 GF's to help lead out piles, mechanical, and logistics
  • Hired 30 solar talented skilled laborers as well as 3 CDL drivers to join directly with SolvEnergy Maxing out the 80% local /20 % travelers contract
  • Implemented a true self perform pile install structure
  • P.O.C for all equipment on scopes assigned, equipment management, equipment transportation, call off's and scheduling
  • Maintained excellent relationships with the electrical, fencing, swppp & civil scopes allowing us to help avoid potential field impacts as well as scheduling issues
  • Build out a ATI specific tool conex as well as a pile equipment tools and parts conex for the 30 PD10's units we had on site

Self-perform Pile Install Supervisor

McCarthy Building Co.
07.2022 - 10.2022
  • 260MW+ Project NexTracker Horizon system
  • 40,000 Monster Piles ranging between 15' and 25' total 80,000 site wide.
  • Pile machine training, maintenance calls with venders, schedule training classes as needed
  • Directly hiring manpower for my tasks
  • Management over logistics with vendors and in-house tasks such as offloading/ staging / shakeout, lay-downs as needed
  • Material count, pre offload inspections and uploading BOL's
  • Established a self-perform QA/QC and remediation team with unique means and methods to comply 100% with the blueprints while staying within every tolerance
  • Locate local vendors to help with machine impacts and or supply materials or fluids as needed and or keep up with online orders as well as schedule maintenance accordingly


Self-perform Racking Supervisor

SpartanCos. Oil and energy companies
03.2022 - 07.2022
  • 180MW ATI system
  • Managed about 60-80 guys
  • Create a full understanding on self-performing ATI trackers on the companies first solar project
  • Trained the general foreman and leads to read blueprints, understand torque values and spacing
  • Built a logistics team to manage delivery's, offloading, escorting, lay down staging or direct drops as needed
  • Used Procore to keep track of all quality issues, punch list items and walk throughs with the clients
  • Managed time for all employees accordingly to the adequate cost code
  • Attended both in-house and client meetings regarding schedule, budgets, manpower, safety and all other meeting types pertaining to my scope
  • Helping establish a foundation for Pile driving,Mechanical and Module install methods

Pile Supervisor / Self Performance

PCL Construc5on
04.2021 - 02.2022
  • 200MW
  • 75k piles
  • Served as PCL's first direct-hired, self-perform pile machine instructor and foundation coordinator for solar projects
  • Responsibilities included toolbox talks and machine maintenance
  • Conducted pile machine training with easily understandable techniques for both experienced and newer solar construction employees
  • Logged production and man hours along with expenses
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.

Pile Driving Supervisor

McCarthy Building Co.
05.2020 - 03.2021
  • Supervised pile driving operations
  • Project 260MW NexTracker
  • 80k posts installed
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.
  • Increased team productivity by implementing efficient workflows and setting clear expectations for staff members.

General Supervisor Piles and Equipment

Ames Construction
01.2020 - 05.2020
  • Supervise 13 GAYKS with integrated GPS systems along with 3 PD10R'S
  • Manage approximately 50 laborers on the project
  • Log production and report all inspection sheets, Job Hazard Analysis (JHA), and any other Requests for Information (RFI)
  • Ensure all equipment operational and available
  • Interact with clients/customers as needed
  • Projects include:
  • 280MW (Indiana)
  • Two 20MW (North Carolina)

Construction Manager / Site Coordinator

RPCS
01.2019 - 01.2020
  • Worked 4 individual single MW projects and helped out on 1 100MW project (all in California) ATI tracking systems. Managed between 10-20 employees as needed.
  • Responsible for completing project in a safe yet productive manner and training employees to boost efficiency for the best ROI possible
  • Worked within budget while managing tools, equipment, rentals, direct hires and temp hired employees
  • Maintained schedule and logged attendance
  • Delivered oversight of all subcontractors
  • Followed up with foreman and leads ensuring paperwork was submitted as needed including daily JHA's, equipment inspections, BOL tracking
  • Communicated and transferred RFI's to the customer on a regular schedule
  • Setup team meeting with foreman and task leads to plan daily and weekly milestones
  • Inspected job sites continuously to ensure build was in compliance and the employees were working in a safe environment that met OSHA standards

Logistics Coordinator / Offload & Staging Foreman

DKD Electric L.L.C.
02.2018 - 11.2018
  • Supervised over 60 construction workers, Project was 350MW (Odessa, Texas) and had over 10 different wattage types First Solar series 6, deliveries, BOL's, inventory, NexTracker.
  • Updated all impacts and updates at the POD meeting every morning.
  • POC with FirstSolar logistics and helped establish a plan that allowed us to offload about 40 trucks a day
  • Responsible for machinery maintenance on both offload and staging teams
  • Made sure leads and foreman understood blueprints and layouts
  • Organized forklift operators and assigned teams by wattage types/ blocks to ensure efficient offload near array while minimizing reallocations.
  • Instructed skid team on how to efficiently stage boxes by mod counts to help ease the installs team and avoid over walking


Pile Driver Instructor / Task Foreman / Mechanical Foreman

McCarthy Building Co.
01.2015 - 01.2018
  • Did 14 total project in colorado including a few for the Denver international airport. All project ranged between 20Mw and100MW.
  • Supervised pile teams, production, and maintenance
  • Trained Operators with proper techniques to improve quality and boost production
  • Helped establish a better understanding of laser setup, grade matching, and masking using tripods or pile mounts and the different ways to setup to grade
  • Trained pile Riggers to setup string line and stakes uniformly to simplify task
  • Trained teams with different techniques such as how to measure out missing pins and replace them avoiding re-surveying and back charges
  • Supervise teams assuring they understand embedment and reveal of pile to find the best shot for production on whole blocks vs per tracker
  • Helped establish a better understanding of pile layout and galvanized pile dimensions
  • Trained operators how to swap out damaged hydraulic hoses, add extensions to the mass, fill and check CO2 levels, swap out anvil, proper greasing and greasing points and how to locate batteries to jump start pile machine
  • Responsible for training leads and mechanical team in understanding the task given such as torque values, proper installation methods, proper component setup and proper usage of tools
  • Contributed to cost savings by optimizing pile lengths through careful planning and calculation prior to installation.
  • Ensured all torque marks had four points of contact being thread, nut, washer, and component
  • Worked on approximately 20 projects ranging in scope from 20-30MW including a few larger
  • Demonstrated adaptability in adjusting to varying job site conditions, implementing alternative piling methods when necessary.

Skills

  • Bilingual (Spanish) - Management - Logistics - Sub contract managment - Procore - Sunscreens - Exact Time - Teams - Bim 360 - Plangrid - Bluebeam

Certification

  • OSHA 10
  • OSHA 30
  • Class 7 forklift certification
  • Rigging certification

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Construction Superintendent

Juwi
07.2024 - Current

Mechanical Superintendent

Rosendin Electric
12.2022 - 07.2024

Asst. Superintendent - Piles/Mechanical/Logistics

SOLV Energy
11.2022 - 12.2022

Self-perform Pile Install Supervisor

McCarthy Building Co.
07.2022 - 10.2022

Self-perform Racking Supervisor

SpartanCos. Oil and energy companies
03.2022 - 07.2022

Pile Supervisor / Self Performance

PCL Construc5on
04.2021 - 02.2022

Pile Driving Supervisor

McCarthy Building Co.
05.2020 - 03.2021

General Supervisor Piles and Equipment

Ames Construction
01.2020 - 05.2020

Construction Manager / Site Coordinator

RPCS
01.2019 - 01.2020

Logistics Coordinator / Offload & Staging Foreman

DKD Electric L.L.C.
02.2018 - 11.2018

Pile Driver Instructor / Task Foreman / Mechanical Foreman

McCarthy Building Co.
01.2015 - 01.2018
Joel A. Anzor