Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Joel De La Fuente

Brownsville,TX

Summary

Accomplished General Foreman with a proven track record at MasTec, enhancing project efficiency and safety compliance through expert supervision and strategic planning. Skilled in equipment operation and team leadership, I have successfully led diverse teams to complete projects on time, within budget, and above quality standards, achieving a significant improvement in client satisfaction.

Overview

23
23
years of professional experience
1
1
Certification

Work History

General Foreman

MasTec
North Dakota
04.2015 - Current
  • Worked alongside team to accomplish work goals according to schedule.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Demonstrated strong leadership abilities in managing diverse teams to achieve common goals while fostering a positive work environment.
  • Improved project efficiency by effectively delegating tasks and managing a team of skilled workers.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Showcased exceptional adaptability when faced with unexpected project challenges, rapidly adjusting strategies and reallocating resources to maintain progress and minimize delays.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
  • Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
  • Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
  • Assigned daily duties to each employee based upon individual strengths.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Established open lines of communication with clients, providing regular updates on project status and addressing concerns promptly.
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Prepared daily time cards and assisted in preparation of estimates and scope of work statements.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Elevated team morale through the implementation of effective recognition programs that acknowledged outstanding individual contributions.
  • Streamlined workflow processes by introducing innovative tools and techniques that enhanced overall efficiency levels.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Checked equipment to determine if maintenance was required.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Provided feedback to workers on job performance and safety procedures.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Directed projects according to schedule and quality demands.
  • Inspected equipment and tools used for safe operation.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Sourced suppliers and purchased necessary materials for work.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Communicated with stakeholders on job milestones.
  • Created and implemented plans to maximize efficiency of workers.
  • Created and updated schedule for area of responsibility.
  • Optimized resource allocation by monitoring project progress and adjusting schedules as needed to minimize delays or disruptions.
  • Determined manpower requirements, material quantities and equipment needs and supervised completion of final punch list.
  • Implemented quality control measures, resulting in fewer defects and increased client satisfaction.
  • Participated in pre-construction meetings to identify potential challenges and develop proactive solutions.
  • Streamlined documentation processes through the use of digital tools like Excel spreadsheets or project management software applications.
  • Implemented risk mitigation strategies with thorough analysis of potential hazards, environmental impact, and other factors affecting project success.
  • Conducted site inspections to monitor progress, address issues, and ensure compliance with regulatory requirements.
  • Directed field personnel to complete project on schedule, within budget and with quality workmanship conforming to plans and specifications.
  • Leveraged strong communication skills to foster collaboration among team members, resulting in improved problem-solving and decision-making processes.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.

Construction Supervisor

Los Fresnos Construction
Los Fresnos, TX
06.2009 - 04.2015
  • Supervised field crews to maximize quality and work efficiency.
  • Maintained a safe work environment by enforcing company policies, procedures, and regulatory standards throughout each project phase.
  • Completed projects on time and within budget by effectively managing resources and schedules.
  • Reported quality of performance on site to site construction managers.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Increased client satisfaction with clear communication, timely updates, and quick resolution of issues.
  • Ensured compliance with local building codes, regulations, and industry best practices through diligent oversight of all construction activities.
  • Collaborated with architects, engineers, and designers to develop comprehensive plans that met client requirements while adhering to established budgets and timelines.
  • Developed strong relationships with subcontractors, vendors, and suppliers to ensure timely delivery of materials at competitive prices.
  • Mitigated risks by conducting thorough site assessments and implementing appropriate safety measures.
  • Delivered high-quality projects by maintaining a rigorous focus on quality assurance and control throughout the construction process.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Managed change orders professionally, negotiating fair adjustments in scope or cost with clients when necessary.
  • Optimized resource allocation by continuously monitoring progress and adjusting staffing levels as needed.
  • Reduced excess spending by effectively utilizing given resources.
  • Sustained safety protocols, ensuring proper, cost-effective and safe handling and usage of equipment and materials.
  • Enhanced team performance through regular feedback, performance evaluations, and targeted training opportunities.
  • Maintained safe practices and operated within budget constraints by training construction workers on best practices and established protocols.
  • Coordinated successful project handovers by ensuring seamless transitions from construction to operations teams.
  • Conducted post-project evaluations to identify areas for improvement in future initiatives while celebrating successes along the way.
  • Oversaw cost-effective supplier purchases, saving company over $30,000.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Implemented emergency resolution initiatives to reduce process lags.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Sourced suppliers and purchased necessary materials for work.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Inspected equipment and tools used for safe operation.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Communicated with stakeholders on job milestones.
  • knowledge in surveying and reading Blueprints.
  • Installation of underground utilities.
  • Concrete work.

Civil Foreman

FD Haul
Brownsville, TX
02.2004 - 03.2009
  • Maintained repairing of shop and filed equipment (Diesel & Gas powered Equipment).
  • Responsible for the care and maintenance of rental equipment.
  • Installation of underground utilities.
  • Able to read blueprints and knowledge of surveying.
  • Worked with pavers to lay down asphalt for roads, driveways, parking lots, and building pads.
  • Ability to work with Oxygen, and Acetylene Gas.
  • Class A CDL License.
  • Conducted thorough pre-construction meetings with clients to establish clear expectations regarding scope, timeline, budget constraints.
  • Ensured safety compliance by conducting regular site inspections and enforcing adherence to regulations.
  • Reduced project delays by effectively managing and coordinating work crews on job sites.
  • Trained new crew members, resulting in increased productivity and reduced error rates on the job site.
  • Led teams in achieving successful completion of complex construction projects, showcasing strong problem-solving skills and adaptability under changing circumstances.
  • Established strong relationships with subcontractors to ensure timely delivery of materials and services at competitive prices.
  • Demonstrated expertise in various construction methods, including concrete forming, steel erection, earthworks, piping installation, and utility connections.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected equipment and tools used for safe operation.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Assistant Project Manager

De-Val Construction, LTD
Brownsville, TX
03.2001 - 08.2003

Assisted project manager in coordinating the construction aspects of building a new 64,000 square foot concrete tilt wall warehouse.

  • Transportation of equipment to the various job site locations.
  • Responsible for the care and maintenance of company and rental equipment.
  • Coordinate with the maintenance crew to report any problem with the operation of assigned equipment.
  • Submit form for the day to account for work hours for all employees.
  • Responsible for purchasing & receiving.
  • Planned, monitored and analyzed project costs to meet financial goals.
  • Assisted in the successful completion of projects by coordinating tasks, monitoring progress, and maintaining documentation.
  • Actively participated in weekly project reviews with senior management to discuss progress updates, challenges faced, potential solutions, and future plans.
  • Led team meetings to assess project progress and plan appropriately to meet delivery targets.
  • Enhanced team collaboration through regular meetings, clear communication, and shared goalsetting.
  • Maintained a safe working environment by enforcing compliance with safety standards, protocols, and regulations at all times.
  • Strengthened relationships with vendors to secure favorable pricing on supplies while ensuring high-quality products were consistently delivered on time.
  • Partnered with project team members to identify and quickly address problems.
  • Identified and resolved risks to minimize project disruption.
  • Conducted detailed project analyses to identify improvement opportunities and implement corrective actions.

Education

No Degree - Business Management

University of Texas At Brownsville
Brownsville, TX
08.2001

High School Diploma -

Gladys Porter High School
Brownsville, TX
05.1999

Skills

  • Equipment Operation
  • Bulldozer, back-hoes, Excavator, Skidsteer and earth moving machinery
  • Class A license, endorsements (Hazmat & Tankers)
  • Supervisory skills
  • Verbal and written communication
  • Crew Management
  • Coordinating tasks
  • Job site maintenance
  • Safety enforcement
  • Site Inspections
  • Team Supervision
  • Daily Planning
  • Crew oversight
  • Blueprint Analysis
  • Hour Tracking
  • Safety practices
  • Documentation skills
  • Effective Communication
  • Work assignments
  • Safety Protocols
  • Project deadlines
  • Project Planning
  • Site coordination
  • Safety Compliance
  • Project site supervision
  • Report Writing
  • Maintenance Management
  • Scheduling jobs
  • Construction supervision
  • Team leadership skills
  • Forklift Operation
  • Team training and support
  • Construction management
  • Strategic Planning
  • Preventive Maintenance
  • Safety meetings
  • Team instructions
  • Producing schedules
  • Valid Texas license
  • Planning projects
  • Equipment monitoring
  • Troubleshooting abilities
  • Productivity logs
  • Gathering supplies
  • Company safety policies
  • Progress Reporting
  • Training and mentoring
  • Timesheet Management
  • Hand and power tools
  • Environmental awareness
  • Construction safety

Certification

  • Forklift Operator Trainer Certifications – Occupational Safety & Health Administration.
  • OSHA Certified
  • CPR/AED Certification
  • Texas Driver's License
  • First Aid Certification

Languages

Spanish
Native or Bilingual
English
Native or Bilingual

Timeline

General Foreman

MasTec
04.2015 - Current

Construction Supervisor

Los Fresnos Construction
06.2009 - 04.2015

Civil Foreman

FD Haul
02.2004 - 03.2009

Assistant Project Manager

De-Val Construction, LTD
03.2001 - 08.2003

No Degree - Business Management

University of Texas At Brownsville

High School Diploma -

Gladys Porter High School
Joel De La Fuente