Summary
Overview
Work History
Education
Skills
Timeline
Generic

John Dubranski

Moscow,PA

Summary

Journeyman electrician for 34 years

General Foreman for 20 years

Project Manager for 15 years

Overseen Multiple similar projects on site at Tobyhanna Army Depot

* TYAD B1C Sub Replacement

* TYAD B11 Switchboard Replacement

Detail-oriented Quality Control Technician adept at reviewing materials and finished items for compliance with specifications and standards. Skilled in reporting and problem-solving with a history of making a positive impact on operations.

Overview

34
34
years of professional experience

Work History

Quality Control Technician

Walsh Electrical Inc.
01.2018 - Current
  • Performed Installation checks on larger switchgear projects. Documented results of installations and reviews.
  • Some Projects completed below.
  • TYAD B1C Sub Replacement.
  • MET Life Data Center Scranton UPS1B replacement.
  • TYAD B11 Switchboard Replacement.
  • Geisinger CMC Expansion.

Project Manager

Walsh Electric Inc
01.2008 - Current
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Prepared and submitted project invoices for review and approval.
  • Managed projects from procurement to commission.
  • Monitored project progress, identified risks and took corrective action as needed.

Journeyman Electrician

Kinback Corporation
09.1989 - 01.2008
  • Worked collaboratively with other mental health professionals to provide consistent care and minimize diversion.
  • Observed and monitored client behavior and responses to treatment.
  • Consulted with other staff members regarding treatment plans as deemed appropriate by team leader.
  • Encouraged patients to discuss experiences in group and individual settings.
  • Completed rough-in, termination, and underground work.
  • Interpreted blueprints, schematics, and diagrams of project requirements and initiated appropriate electrical installations.
  • Read technical drawings, diagrams and project documentation to make accurate decisions about electrical system installations and repair work.
  • Repaired and installed new fixtures, wiring, circuits, and motors.
  • Tested electrical systems and components for continuity, current, voltage and resistance.
  • Trained junior electrical professionals on proper procedures.
  • Adhered to safety protocols, OSHA standards and building codes in installation of systems, operation of equipment, and handling of materials.
  • Performed troubleshooting to determine issues and appropriate action to complete tasks and provide quality installations.

Education

Associate of Arts - Electronic And Fluidtic Technology

Johnson School of Technology
Scranton, PA
06.1987

Skills

  • Specifications Understanding
  • Calibration Standards
  • Compliance Verification
  • Testing Procedures
  • Visual Inspection
  • Testing Protocols
  • Blueprint reading
  • Electrical testing

Timeline

Quality Control Technician

Walsh Electrical Inc.
01.2018 - Current

Project Manager

Walsh Electric Inc
01.2008 - Current

Journeyman Electrician

Kinback Corporation
09.1989 - 01.2008

Associate of Arts - Electronic And Fluidtic Technology

Johnson School of Technology
John Dubranski