Summary

Construction Coordinator at Northstar Energy Solutions with expertise in construction scheduling and team leadership. Before that was Superintendent with proven track record in enhancing project efficiency and ensuring compliance through meticulous documentation control. Skilled in labor management, I successfully trained and onboarded new workers, driving project completion ahead of deadlines while maintaining site safety standards. I have been a Superintendent since 2009.

Overview

26
26
years of professional experience

Work History

Construction Coordinator

Northstar Energy Solutions
Grand Prairie, TX
09.2020 - 09.2026
  • Coordinated construction schedules, site communications, and work order updates for active project support
  • Tracked permits, inspections, and compliance documents to maintain organized project records
  • Monitored material deliveries, vendor coordination, and jobsite logistics to support workflow continuity
  • Prepared progress reports, meeting notes, and action items for project team review
  • Assisted field supervisors with issue resolution, scope changes, and daily coordination tasks
  • Supported safe jobsite operations by following procedures, reporting concerns, and coordinating corrective actions
  • Interviewed, hired, and trained new workers.
  • Held construction progress and regular status meetings with project team.
  • Consulted with clients to define objectives and develop scopes.
  • Attended Number on-site meetings with subcontractors and clients per month.
  • Formulated quality assurance and safety standards to comply with construction plans.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.

Superintendent

Champman, Wilbros, Primoris
Denton, TX
05.2008 - 05.2020
  • Directed field crews to maintain safe, efficient execution of pipeline and utility construction activities.
  • Coordinated daily schedules, equipment, and subcontractors to keep projects aligned with production goals.
  • Enforced safety procedures, jobsite compliance, and toolbox talks to support incident-free operations.
  • Reviewed plans, specifications, and work scopes to verify accurate field installation and sequencing.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Maintained safety onsite and upheld all OSHA regulations by Action.

Senior Lineman (Crew Foreman)

Garland Power & Light
Garland, TX
07.2000 - 05.2008
  • Installed and maintained overhead and underground distribution lines, transformers, and service connections.
  • Troubleshot outages and restored electric service through safe, efficient field repairs.
  • Operated bucket trucks, line tools, and testing equipment to support energized and de-energized work.
  • Inspected poles, switches, and equipment to identify hazards and prevent service interruptions.
  • Repaired damaged conductors and hardware during emergency storm restoration response.
  • Coordinated with crew members to execute switching procedures and maintain system reliability.
  • Followed utility safety standards, PPE requirements, and lockout/tagout practices on all assignments.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Removed old poles and hardware and replaced with new equipment.
  • Assisted in emergency storm restoration efforts, restoring power to affected communities as quickly as possible.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.

Education

Drafting, Electrical Technology

South Plains College
Levelland, TX

High School Diploma -

Levelland High
Levelland, TX
1985

Skills

Construction scheduling

Labor management

Documentation control

Construction estimating

Team leadership

Site safety

Tool operation

Hiring and onboarding

Additional Information

I have been in line work for 41 years. I started out in distribution then moved into transmission/substation at the same time doing overhead and underground when I worked at GP&L. Then went straight transmission but last couple of years I have had to do some distribution work. I have done jobs for Oncor, Xecel, Texas-New Mexico, Entergy, AEP, Texas County CO-OP (OK), different Green Energy company's, co-op's.

Timeline

Construction Coordinator

Northstar Energy Solutions
09.2020 - 09.2026

Superintendent

Champman, Wilbros, Primoris
05.2008 - 05.2020

Senior Lineman (Crew Foreman)

Garland Power & Light
07.2000 - 05.2008

Drafting, Electrical Technology

South Plains College

High School Diploma -

Levelland High
John Huckeby