Summary
Overview
Work History
Education
Skills
Timeline
Generic

John Moore

Joplin,MO

Summary

I started at General Mills as a temporary employee in September of 2013. I worked in the plant, primarily assigned to Line 6 1st Shift, for 10 months, before reaching my maximum hours limit. In November of 2014 I was called back in and hired as a full time employee.

In my time in the plant I have been on line 6 for the majority of my time, but have spent some time on other lines, where I have always spent time learning to run the different sheeters, and have worked as Sheeter Operator for most lines when staffing needed it.

Overview

9
9
years of professional experience

Work History

Production Utility

General Mills
Jolon, CA
11.2014 - Current

Worked as a member of multiple teams over the last ten years.

Been trained as a Back Up Sheeter Operator on Line 6, since 2016.

Have worked as Sheeter Operator on Line 7 Sheeter due to low staffing.

Education

High School Diploma - General

South Iron High School
Annapolis, MO
05.2011

Skills

  • Quality Control Standards
  • Health and safety compliance
  • Equipment Operation
  • Production Reporting
  • Machine setup
  • Preventive Maintenance
  • Equipment optimization
  • Equipment Calibration

Timeline

Production Utility

General Mills
11.2014 - Current

High School Diploma - General

South Iron High School
John Moore