Field leader focused on constructible piping plans, MOP support, and coordinated execution for mission-critical mechanical projects. Reads drawings, resolves field constraints, and assigns crews to productive work while maintaining safe, orderly progress across retrofits, equipment replacements, testing, and startup.
Work History
Pipe Foreman
5 Months
AIRCO MECHANICAL | 06.2026 - Current
Supervised pipe crews for AIRCO MECHANICAL mechanical jobsite installations.
Developed field routing, work sequences and resource requirements; participated in coordination meetings and supported methods of procedure (MOPs) for controlled execution.
Integrated into active projects for complex or special-attention piping and equipment assignments; assessed existing conditions, consulted site foremen and superintendents, and established constructible next steps without disrupting ongoing work.
Coordinated daily tasks with project managers, trades, and site supervisors.
Reviewed blueprints and specifications for piping layouts and field work.
Foreman
1 Year
JACK LAURENCE | 06.2025 - 06.2026
Planned phased chiller and pump replacement at San Antonio emergency-management facility, adding isolation to maintain one chiller in service while the other side was replaced and hydrotested. Completing both changeouts without rental cooling.
Planned AHU and piping installation in operating AT&T server room under limited-access and existing-equipment constraints.
Developed installation sequences for operating-facility retrofits from field walk and incomplete or unavailable installation drawings, identifying access, material, labour and shutdown needs.
Field Foreman / Superintendent
5 Years 4 Months
WAY MECHANICAL | 02.2020 - 06.2025
Directed hydronic installation with approximately 15–20 craft personnel at peak, coordinating controls and insulation interfaces with the plumbing and ductwork superintendents and GC.
Built floor-by-floor pull plans from GC schedules and rolling 3- and 6-week look-aheads; reviewed man-hours, RFIs and equipment-status logs with the PM and adjusted manpower transfers or additions to match available productive work.
Aligned crews through daily stretch-and-flex, JSA discussions and work-permit reviews, and coordinated equipment setting, lift MOPs, pressure testing, flushing, chemical treatment and startup/commissioning interfaces.
Coordinated detailers, fabricators and vendors around installation priorities through drawing, fabrication, delivery and schedule communication, and escalated developing constraints to management.
Responded to fan-box package delays by completing mains and runouts, providing isolation near tie-ins and hydrotesting available piping so insulation and identification work could advance before final connections.
Managed fifth-floor piping delivery change by securing staging area and redirecting crews to hanger installation and equipment layout with available shop drawings and hanger materials.
Improved crew effectiveness by assigning workers to roles suited to demonstrated strengths and coaching four helpers into more advanced piping tasks, restoring prior consistent labor performance.
Led hydronic scope across project coordination efforts.
Led J. Irwin gas-storage project, managing approximately 10–15 rig welders at peak and overseeing welder testing and qualifications; completed lead-foreman and pipefitting assignments on other industrial installations.
Contributed innovative ideas and solutions to enhance team performance and outcomes.
Collaborated with coworkers to accomplish goals and address issues related to products and services.
Completed day-to-day duties accurately and efficiently.
Foreman / Supervisor
8 Years
VICTORIA A/C | 01.2006 - 01.2014
Directed piping, controls and insulation work, including ductwork oversight, on Brandeis and Brennan high-school projects; coordinated approximately 40–60 workers at peak across assigned scopes.
Led foreman duties with Zachry / Black & Veatch at Calaveras Power Plant; advanced as pipefitter with KCI Constructors on Quantum Ethylene Project.
Education
High School Diploma
McCollum High School | San Antonio, TX | 05-1982
Skills
Workforce supervision
Pipe plan sequencing
Blueprint analysis
Project planning
Fabrication oversight
Documentation review
Inspection coordination
Blueprint interpretation
Shutdown planning
System testing
Permit coordination
Field issue resolution
Risk mitigation
Preventive maintenance
Personal Information
Title: MECHANICAL SUPERINTENDENT | HYDRONICS & CENTRAL PLANTS
Availability: Available for Nationwide Travel
LEADERSHIP & PROJECT DELIVERY
Foreman development & crew coaching
Collaborative pull planning
Man-hour and manpower reviews
3- & 6-week look-aheads
Schedule recovery and constraint management
Detailer / fabricator / vendor coordination
MOPs, RFIs and constructability
JSA / permits / field safety
Hydronic testing and commissioning readiness
MECHANICAL & MISSION-CRITICAL-RELEVANT EXPERIENCE
Chilled- and hot-water distribution; chillers, boilers, pumps, AHUs, coils, chemical feed, makeup water, expansion tanks, controls and insulation interfaces; project scopes varied.
Carbon-steel and other piping systems, equipment connections, valves, supports, fabrication and fit-up; mechanical-room piping up to 20 inches across career assignments.
Controlled shutdowns and isolation, hydrostatic testing, flushing, treatment, startup readiness and turnover coordination in operating facilities. Related CRAH and chilled-water experience on smaller data-center/server-room installations in foreman roles.
LEADERSHIP APPROACH & TECHNOLOGY
Set one direction, bring field expertise into the plan, make responsibilities clear and coach people into greater capability. Respond to disruptions with measured decisions, safe alternatives and transparent communication; build a productive jobsite where the team takes pride in the work. | Procore