Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jordan Liddell

Slidell,LA

Summary

Dynamic professional with extensive experience in flooring installation and kitchen management, notably at Gus's Flooring. Proven ability in staff development and operations management, ensuring high-quality results. Skilled in precise material handling and fostering strong team relationships, consistently achieving project goals under tight deadlines.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Flooring Installer

Independant Contractor
03.2022 - 06.2025
  • Operated hand tools and machines to cut material, secure joints, and achieve proper fit around obstructions in tight spaces for approximately 500,000 square feet.
  • Readied surfaces to accept coverings by sweeping away materials, correcting flows and applying special treatments.
  • Operated sit-down forklift to unload and load carpet rolls and flooring skids into work vans.

Laborer

Apple Construction Co
01.2021 - 02.2022
  • Loaded, unloaded, and moved material between storage and production areas while maintaining approximately $1 billion in material inventory.
  • Managed safe and efficient use of tools and equipment on construction sites.

Kitchen Manager

El Aquila
11.2018 - 04.2020
  • Developed kitchen staff through training, disciplinary action, and performance reviews.
  • Reviewed and analyzed kitchen performance to verify gaps, implemented effective inventory control systems to reduce food spoilage and waste, observed for continuous improvement.

Head Sushi Chef

Panda Palace
07.2015 - 09.2018
  • Oversaw scheduling, inventory management, and supply ordering to maintain a fully stocked kitchen.
  • Trained kitchen staff to perform various preparation tasks under pressure, while maintaining kitchen safety, sanitation, and cooking techniques.
  • Developed and remained accountable for safety, quality, consistency, and adherence to standards.

Floor Technician

Gus's Flooring
02.2012 - 06.2015
  • Installed and repaired hardwood flooring, laminated plastic covering material, and tile in commercial and residential spaces.
  • Assisted with project planning by measuring locations and pieces, marking points, and skillfully cutting materials with hand and power tools.
  • Prepared job sites with scaffolding, shoring, and other support systems to meet project requirements.
  • Boosted team performance by collecting debris, extra materials, and tools to keep work areas clean and organized.
  • Proved successful working within tight deadlines and a fast-paced environment.

Education

GED -

Harrison Central High Schoool
Gulfport, MS
06-2012

Skills

  • Staff and operations management
  • Attention to detail
  • Employee development
  • Relationship building
  • Forklift operation

Certification

  • CSP - Certified Safety Professional
  • OSHA 10 - Occupational Safety and Health Administration

Timeline

Flooring Installer

Independant Contractor
03.2022 - 06.2025

Laborer

Apple Construction Co
01.2021 - 02.2022

Kitchen Manager

El Aquila
11.2018 - 04.2020

Head Sushi Chef

Panda Palace
07.2015 - 09.2018

Floor Technician

Gus's Flooring
02.2012 - 06.2015

GED -

Harrison Central High Schoool