Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jose Magallon

Meter Installer
Sacramento,CA

Summary

Punctual, reliable, and quick learner, looking to advance further into the electrical trade. With over seven years in the construction, electric, and utility field I am looking to bring my skills and assets to an exciting new environment where I can learn and solidify my career. I bring prior knowledge using various hand, power, and heavy construction tools and equipment and am looking forward to learning more. With a heavy mindset of safety and new growth potential, I look forward to adding my skills and assets to the team.

Overview

1
1
Certification
7
7
years of professional experience

Work History

Electric Meter Installer

Utility Partners of America
04.2025 - 03.2026
  • Safely drive to work orders as dispatched on Ensight app
  • Advise customer of meter upgrade and answer any questions they may have
  • Verify main breaker sizing, meter form, class, and voltage
  • Test line and load side voltages to ensure proper operating voltage using a voltage tester
  • Test and inspect meter socket jaws for hot sockets
  • Report any abnormal operating conditions to supervisor
  • Upgrade customers' legacy meters to new Riva electric meters

Lead Solar Installer

Spectrum Energy Development
06.2020 - 04.2025
  • Used drawings, schematics, and instructions to properly install PV systems in accordance with local codes and standards
  • Lead team to complete projects while remaining productive and safe
  • Checked electrical installation for proper wiring, polarity, grounding, and integrity of terminations
  • Test for proper voltage using multimeter
  • Dug trenches, laid conduit, ran PV wiring, backfilled trench and compacted earth to prepare for new construction
  • Install wire and electrical conduit from roof, inverters, load center, AC disconnect, meter to terminal box
  • Met with contractors and city inspectors to review completed work
  • Troubleshot and repaired faulty systems

Solar Installer

Vitro Renewable Energy
09.2019 - 04.2020
  • Install roofing racking system for solar panels
  • Wire micro-inverters/ Optimizers
  • Carried solar modules to roof for installation
  • Dug trenches and laid underground conduit
  • Mount solar equipment on walls
  • Commissioned solar equipment

Education

High School Diploma - undefined

Florin High School
Sacramento, CA
05-2017

Skills

  • Familiar with electric testing equipment
  • Ability to learn company applications for work order dispatch
  • Safety and team oriented
  • Strong ability to communicate and collaborate with others
  • Able to utilize various hand and power tools

Certification

CPR/AED, Standard First Aid, and Bloodborne Pathogens (BLS)

Timeline

Electric Meter Installer

Utility Partners of America
04.2025 - 03.2026

Lead Solar Installer

Spectrum Energy Development
06.2020 - 04.2025

Solar Installer

Vitro Renewable Energy
09.2019 - 04.2020

High School Diploma - undefined

Florin High School
Jose MagallonMeter Installer