Summary
Overview
Work History
Education
Skills
Timeline
Generic

JOSE RIOS

Pasadena,TX

Summary

Experienced pipefitter offering well-developed skills in managing teams. Pursuing a position in a busy organization where a qualified individual has an understanding of assembling, hydro testing, and installing pipe systems. Detail-oriented individual with exceptional communication and project management skills. Proven ability to handle multiple tasks effectively and efficiently in fast-paced environments. Recognized for taking a proactive approach to identifying and addressing issues, with a focus on optimizing processes and supporting team objectives.

Overview

13
13
years of professional experience

Work History

Pipe Senior GF

Bechtel Construction Company
Port Arthur, Texas
02.2025 - Current
  • PALNG Project, Sabine Pass.
  • Assigned and monitored work assignments for the crew, foreman, and general foreman, assessing physical progress daily.
  • Challenged the crew and General Foreman to achieve clear performance goals and expectations.
  • Cleared obstacles hindering performance to enhance productivity.
  • Entered labor charges into payroll system daily to ensure accurate tracking.
  • Managed work orders and reported progress accurately to the Planning Department.
  • Oversaw parts and materials assigned to Work Orders, ensuring efficient utilization.
  • Monitored performance metrics and reported findings to Area Manager and Directors.
  • Collaborated with Planning on production control projects to optimize resource allocation.
  • Plan a 3-week look-ahead and a 90-day look-ahead.

Pipe Foreman

Turner Industries
Pasadena, USA
10.2024 - 02.2025
  • Company Overview: Dow Poly7 Project, Freeport, Tx
  • Observe and correct unsafe behavior
  • Oversaw pipe fabrication and installment per drawings and specs
  • Manage audit books to ensure cost and material are being meet
  • Ensure all employees obey all safety rules
  • Delivered exceptional results under tight deadlines by prioritizing tasks, delegating responsibilities, and overseeing all aspects of pipe installation projects from start to finish
  • Developed strong relationships with subcontractors, ensuring timely completion of work while maintaining high-quality standards
  • Reviewed and approved employee time reporting
  • Maintained open lines of communication with clients throughout the duration of each project, providing updates on progress and addressing any concerns promptly and professionally.
  • Dow Poly7 Project, Freeport, Tx

Pipefitter AGF

S&B Engineers and Constructors
Pasadena, USA
11.2021 - 10.2024
  • Company Overview: Bryan Mound Strategic Petroleum Reserve LE2 Project located in Freeport, TX
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations
  • Supported fellow team members in their tasks, fostering a collaborative work environment that prioritized both safety and efficiency
  • Followed safe work practices, which included fall protection and personal protective equipment
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems
  • Installed new systems and connected piping to existing components by welding, bolting and threading
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods
  • Optimized material usage by accurately measuring and calculating required materials for each project, minimizing waste
  • Maintained high-quality standards through consistent attention to detail while fitting pipes according to building code requirements
  • Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality
  • Reduced project completion time by interpreting blueprints, sketches, and specifications to accurately plan pipefitting installations
  • Assisted in achieving project deadlines through effective organization of work assignments and prioritization of tasks based on urgency
  • Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project
  • Threaded pipes using piping machines
  • Measured, threaded, and cut materials to correct angles
  • Constructability / job preplanning.
  • Bryan Mound Strategic Petroleum Reserve LE2 Project located in Freeport, TX

Pipefitter AGF

S&B Engineers and Constructors
Deer Park, USA
08.2019 - 10.2020
  • Completed Frac 11 located at Enterprise in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter AGF

S&B Engineers and Constructors Ltd
Deer Park, USA
01.2018 - 01.2019
  • Completed Frac 6 located at Lone Star NGL in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter AGF

S&B Engineers and Constructors Ltd
Deer Park, USA
06.2017 - 01.2018
  • Completed Frac 5 located at Lone Star NGL in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter GF

S&B Engineers and Constructors Ltd
Deer Park, USA
10.2016 - 06.2017
  • Completed Chevron Phillips Ethylene located in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter GF

S&B Engineers and Constructors Ltd
Deer Park, USA
01.2016 - 09.2016
  • Completed Frac 4 located at Lone Star NGL in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter GF

S&B Engineers and Constructors Ltd
Deer Park, USA
11.2014 - 01.2016
  • Completed ETP Frac 3 located at Lone Star NGL in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter Foreman

S&B Engineers and Constructors Ltd
Deer Park, USA
02.2014 - 11.2014
  • Completed Mariner South X-Port Frac at Lone Star NGL located in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter Foreman

S&B Engineers and Constructors Ltd
Deer Park, USA
08.2013 - 02.2014
  • Completed Chevron CB1 Hexene Project located at Chevron Phillips in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Pipefitter Foreman

S&B Engineers and Constructors Ltd
Deer Park, USA
03.2012 - 08.2013
  • Completed Frac 1 & 2 located at Lone Star NGL in Mount Belvieu
  • Oversaw all pipe fabrication and installment including creating a field fab spread sheet on excel
  • Managed movement of materials and equipment to different job sites
  • Read and interpreted specifications, diagrams and blueprints for job
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining
  • Observed safe work rules, including fall protection and PPE
  • Oversaw 250 apprentices, answered questions and provided feedback on work
  • Manage audit books and overlooking cost and material.

Education

GED -

Windham Education Center
Beeville, TX
04.1996

Skills

  • Excel spreadsheet
  • Word
  • Bleu Beam
  • Navisworks
  • P&ID interpretation and understanding
  • Hydro testing and procedures
  • Rigging fundamentals
  • NCCER Pipe Fitting #5501797
  • Problem resolution and solving
  • Job constructability and planning
  • Pipe installation
  • Pipe Fighter Program
  • Etrax and Citrix

Timeline

Pipe Senior GF

Bechtel Construction Company
02.2025 - Current

Pipe Foreman

Turner Industries
10.2024 - 02.2025

Pipefitter AGF

S&B Engineers and Constructors
11.2021 - 10.2024

Pipefitter AGF

S&B Engineers and Constructors
08.2019 - 10.2020

Pipefitter AGF

S&B Engineers and Constructors Ltd
01.2018 - 01.2019

Pipefitter AGF

S&B Engineers and Constructors Ltd
06.2017 - 01.2018

Pipefitter GF

S&B Engineers and Constructors Ltd
10.2016 - 06.2017

Pipefitter GF

S&B Engineers and Constructors Ltd
01.2016 - 09.2016

Pipefitter GF

S&B Engineers and Constructors Ltd
11.2014 - 01.2016

Pipefitter Foreman

S&B Engineers and Constructors Ltd
02.2014 - 11.2014

Pipefitter Foreman

S&B Engineers and Constructors Ltd
08.2013 - 02.2014

Pipefitter Foreman

S&B Engineers and Constructors Ltd
03.2012 - 08.2013

GED -

Windham Education Center