Civil Engineer with over 25 years of experience in high impact infrastructure projects. I have led and completed 20 major developments, ensuring top quality standards, cost efficiency, and timely delivery. Skilled in structural design, material calculation, cost analysis, and quality control. I am proficient with tools like Lulo Win, Project and Excel. As the owner of a construction company specializing in bathroom remodeling, I bring both technical expertise and entrepreneurial insight. My commitment to innovation includes sourcing advanced machinery internationally to optimize production. I am ready to contribute my experience to the U.S. construction industry, driving impactful development.

Overview

32
32
years of professional experience

Work History

Handyman

Prosembol LLc
07.2019 - Current

Specialist in high-end bathroom remodeling with over 5 years of experience transforming residential and commercial spaces into functional, modern and high quality environments.

Founder and manager of my own construction and remodeling company overseeing all aspects of the business, from planning and design to execution and project completion.

Commitment to the highest standards of quality and safety ensuring that each remodel complies with construction regulations and sustainable practices in the United States.

Innovation and use of cutting edge materials that enhance the durability, efficiency, and value of remodeled spaces, aligned whit U.S. market trends.

Focus on client satisfaction and timely completion with a proven track record of successful projects completed on time and within budget.



Electrician Helper

Strada Electric
02.2020 - 07.2020
  • Perform the distribution and installation of power lines, reading and interpretation of plans, installation of electrical accessories, panel assembly (rough and trim)
  • Pulled wire through conduits and through holes in walls and floors.
  • Organized materials and tools in to maintain clean and neat work areas.
  • Helped complete system installations, digging trenches, and breaking up concrete.
  • Improved workplace organization by maintaining a clean and hazard-free environment for all team members during projects.

Civil Engineer Supervisor

Oxxo Commercial
05.2018 - 11.2018
  • Supervision of convenience store, construction projects, structure, general finishes, electrical installations, plumbing.
  • Estimated quantities and material costs during project planning to support budgeting and costing.
  • Supervised construction progress on-site, addressing any discrepancies or issues promptly while maintaining safety protocols.
  • Monitored execution of contract work for compliance with design plans and specifications.
  • Managed quality assurance and laboratory testing for concreting operations.

Engineer Civil Supervisor

Hardblock C.A.
04.2016 - 08.2018

Civil Engineer with extensive experience in supervising and executing large scale industrial projects. Served as the lead supervising engineer from the planning phase to the commissioning of a concrete block factory, overseeing each stage of the project to ensure quality, efficiency, and timely completion. As part of my commitment to excellence, I traveled to China to research and procure the best machinery available on the global market, thereby optimizing the factory's productions capacity. This experience highlights my ability to manage complex projects and my focus on innovative solutions that deliver long term value.

Engineering Project Manager

Prosembol C.A.
10.2000 - 03.2016
  • Development of industrial, housing and educational projects. Planing and execution of civil engineering works. Remodeling of educational structures in general, electrical and sanitary installations, painting.
  • Provided technical leadership for company to effectively steer strategic plans and future projects.
  • Kept projects on schedule and within budget while serving as project leader.
  • Verified construction documentation to meet client requirements and vision.

Engineering Assistant

Aliva Stump C.A.
03.1993 - 10.2002

Generalities Generalities Generalities Generalities Generalities Generalities Generalities Generalities Generalities Generalities Generalities Generalities

  • Execution and supervision of civil engineering projects ensuring compliance with design specifications and project timelines.
  • Material calculations for procurement including precise metric computations for steel, concrete, and form work, ensuring, cost effectiveness and resource optimitation.
  • Expertise in electrical and plumbing installations overseeing all aspects of uti;ity integration for efficient project execution.
  • Quality control management implementing rigorous standards to maintain excellence throughout the construction process.
  • Earthworks management coordinating excavation and grading activities to facilitate effective site preparation.
  • Proficient in project management software susch as Lulo Win, Project, Excel and Word, enhancing productivity and communication throughout project phases.
  • Unit price analysis and project valuation providing detail cost estimates and budgets to support financial decision making.
  • Concrete calculations and design ensuring structural integrity through meticulous engineering practices and innovative design solutions.
  • Formwork design and installation utilizing advanced techniques for effective temporary during construction.
  • Reading and interpreting blueprints translating technical drawings into actionable plans for construction teams.
  • Involvement in High-Impact Projects Payed a pivotal in over 20 of the most significant and iconic projects in my country, where I applied advance engineering principles to maximize project outcomes. My contributions included innovate design solutions, effective resource management, and the implementation of best practices that enhanced both efficiency and sustainability. Through this extensive experience, I have demonstrated my ability to drive complex project to successful completion, significantly contributing to the development of infrastructure and urban landscapes in my Region.


PROJECTS I HAVE WORKED ON


1. Multicentro Empresarial “S” Tower (El Aragüeño)

  • Location: Aragua State -Maracay
  • Start Date: January 1993
  • Ending Date: December 1997
  • Contracting Client: Inversiones El Obelisco S.A.
  • Final Client: Grupo Sindoni
  • Contract Value: $16.975.793,00
  • Construction Area: 50.000 m2
  • Concrete Volume: 21.000 m3
  • Man Hours: 2.160.000

Structures, finishes, facilities of the Multicentro Empresarial “El Aragüeño”.


2. Las Americas Mall (First Stage)

  • Location: Aragua State -Maracay
  • Start Date: July 1993
  • Ending Date: March 1996
  • Contracting Client: Promociones Las Americas C.A.
  • Final Client: Grupo Sindoni
  • Contract Value: $6.730.850,00
  • Construction Area: 90.000 m2
  • Concrete Volume: 16.000 m3
  • Man Hours: 734.400

Earthmoving, structures, electrical and sanitary installations.


3. Las Americas Mall (Second Stage)

  • Location: Aragua State - Maracay
  • Start Date: May 2000
  • Ending Date: November 2000
  • Contracting Client: Promociones Las Americas C.A.
  • Final Client: Grupo Sindoni
  • Contract Value: $3.840.000,00
  • Construction Area: 32.000 m2
  • Concrete Volume: 6.400,00 m3
  • Tons of Steel: 1.024
  • Man Hours: 216.000

Expansion of the Las Americas Mall area. Includes design and construction of the mixed structure (concrete – steel).


4. Capricho III Residences

  • Location: Aragua State - Maracay
  • Start Date: April 1996
  • Ending Date: October 1997
  • Contracting Client: Promociones Trapecio, C.A.
  • Final Client: Grupo Sindoni
  • Contract Value: $294.117,00
  • Construction Area: 3.500 m2

Construction of the first stage of the Capricho III Residences building. It includes temporary installations, earthworks, infra and superstructure and everything related to concrete, formwork and steel.


5. Las Cristinas Construction Camp

  • Location: Bolívar State - km 88
  • Start Date: September 1997
  • Ending Date: March 1998
  • Contracting Client: Minca (70% Placer Dome, 30% CVG).
  • Final Client: Minca (70% Placer Dome, 30% CVG).
  • Contract Value: $10.000.000,00
  • Construction Area: 24.263 m2
  • Concrete Volume: 7.200 m3
  • Man Hours: 360.000

Construction of the Camp for the development of the industrial plant of a gold mine and collection. The Camp will provide service for 4,000 beds and 750 simultaneous meals.


6. Nestle Industrial Complex

  • Location: Aragua State - Santa Cruz
  • Start Date: April 1994
  • Ending Date: April 1998
  • Contracting Client: Nestle de Venezuela, S.A.
  • Final Client: Nestle de Venezuela, S.A.
  • Contract Value: $10.882.350,00
  • Construction Area: 47.700 m2
  • Concrete Volume: 8.700 m3
  • Man Hours: 1.296.000

Civil works of the Nestle industrial complex, consisting of buildings: chocolate factory, cocoa treatment, cocoa warehouse, boiler house, industrial services and technical services.


7. Plaza Mayor Mall – West Wing, First Stage

  • Location: Anzoátegui State - Puerto La Cruz
  • Start Date: August 1993
  • Ending Date: October 1995
  • Contracting Client: Centro Comercial Plaza Mayor, C.A.
  • Final Client: Centro Comercial Plaza Mayor, C.A.
  • Contract Value: $2.261.866,00
  • Construction Area: 14.298 m2
  • Concrete Volume: 4.700 m3
  • Man Hours: 540.000

Reinforced concrete structures.


8. Plaza Mayor Mall – West Wing, Second Stage

  • Location: Anzoátegui State - Puerto La Cruz
  • Start Date: April 1995
  • Ending Date: October 1995
  • Contracting Client: Centro Comercial Plaza Mayor, C.A.
  • Final Client: Centro Comercial Plaza Mayor, C.A.
  • Contract Value: $460.327,00
  • Construction Area: 7.000 m2
  • Concrete Volume: 1.800 m3
  • Man Hours: 108.000

Reinforced concrete structures.


9. Plaza Mayor Mall, Third Stage

  • Location: Anzoátegui State - Puerto La Cruz
  • Start Date: February 1999
  • Ending Date: April 2000
  • Contracting Client: Centro Comercial Plaza Mayor, C.A.
  • Final Client: Centro Comercial Plaza Mayor, C.A.
  • Contract Value: $1.080.258,00
  • Construction Area: 6.500 m2
  • Concrete Volume: 1.800 m3
  • Man Hours: 302.400

Reinforced concrete structures.


10. Loma de Niquel Plant (Buildings)

  • Location: Miranda State - Las Tejerías
  • Start Date: May 1998
  • Ending Date: June 2000
  • Contracting Client: Minera Loma de Niquel, C.A. (Grupo Minorco).
  • Final Client: Minera Loma de Niquel, C.A. (Grupo Minorco).
  • Contract Value: $5.400.000,00
  • Construction Area: 11.000 m2
  • Concrete Volume: 3.200 m3
  • Tons of Steel: 470
  • Man Hours: 945.000

Buildings for the nickel processing plant.


11. Orinoco Iron (Buildings)

  • Location: Bolívar State - Ciudad Guayana
  • Start Date: April 1998
  • Ending Date: October 1999
  • Contracting Client: Orinoco Iron, C.A. (Sivensa - BHP Australia).
  • Final Client: Orinoco Iron, C.A. (Sivensa - BHP Australia).
  • Contract Value: $10.500.000,00
  • Construction Area: 16.920 m2
  • Concrete Volume: 11.000 m3
  • Man Hours: 1.004.400

Various buildings in the Briquette Plant.


12. Hotel Italo

  • Location: Aragua State -Maracay
  • Start Date: February 1995
  • Ending Date: December 1996
  • Contracting Client: Hotel Italo
  • Final Client: Hotel Italo
  • Contract Value: $2.794.117,00
  • Construction Area: 5.500 m2

Piloting, screens, infrastructures and superstructure of the 3rd stage of the Hotel Italo (64 rooms). Masonry, finishes and equipment.

Education

Bachelor of Civil Engineering -

UNIVERSIDAD AUTONOMA DE QUERETARO (REVALIDA)
QUERETARO, MEXICO
06.2018

Bachelor of Civil Engineering -

INST UNIVERSITARIO POLITECNICO SANTIAGO MARINO
VALENCIA, VENEZUELA.
08.2010

ELECTRICAL TECHNICIAN -

ESCUELA TECNICA INDUSTRIAL (ETI)
LA VICTORIA, VENEZUELA
07.1988

Skills

*Strategic planning of large scale infrastructure projects, focusing on resource optimization and timely delivery

  • Construction management
  • Cost Estimates

*Comprehensive coordination and management of all construction project phases, from initial design and conception to final execution

*Accurate budgeting and cost control ensuring the financial viability of each project through detailed analysis and cost-saving strategies

*Supervision and leadership of multidisciplinary teams fostering a collaborative and highly efficient work environment

*Advanced interpretation of blueprints and technical specifications with the ability to translate complex concepts into practical, effective solutions

*Expert handling of modern construction tools and technologies including design and project management software

*Effective communication and superior interpersonal skills facilitating coordination with staff, contractors, and stakeholders at all levels

*Negotiation and conflict resolution skills with contractors and suppliers, maintaining professional relationships that optimize results

*Development of sustainable construction practices applying green building principles and energy efficiency to meet environmental standards

*Adaptability and proactivity in high - pressure environments results oriented with a proven record of successful project completions

Timeline

Electrician Helper

Strada Electric
02.2020 - 07.2020

Handyman

Prosembol LLc
07.2019 - Current

Civil Engineer Supervisor

Oxxo Commercial
05.2018 - 11.2018

Engineer Civil Supervisor

Hardblock C.A.
04.2016 - 08.2018

Engineering Project Manager

Prosembol C.A.
10.2000 - 03.2016

Engineering Assistant

Aliva Stump C.A.
03.1993 - 10.2002

Bachelor of Civil Engineering -

UNIVERSIDAD AUTONOMA DE QUERETARO (REVALIDA)

Bachelor of Civil Engineering -

INST UNIVERSITARIO POLITECNICO SANTIAGO MARINO

ELECTRICAL TECHNICIAN -

ESCUELA TECNICA INDUSTRIAL (ETI)
Jose Roman