Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jose V. Cruz

Garden Grove,CA

Summary

Pursuing opportunities in a company as that will utilize my diverse knowledge, experience, and skills to become a key team member.

Loyal self-motivated Spanish bilingual professional Ability to work independently and collaboratively . Assembly , Forklift Using hand tools Winding Soldering Framing Plumbing Underground Plumbing Stucco Drywall Electrical Plumbing Know how to read facility layouts and construction drawings, plans.

Overview

1
1
Certification
15
15
years of professional experience

Work History

Foreman/Lead installer

Tiffany Glass & Mirror
01.2025 - Current
  • Use vacuum suction cups for handling glass units, ensure proper cleaning of the frame, and use tools like rubber mallets to secure glazing profiles
  • Window installation requiring meticulous preparation of the rough opening, including ensuring it is square, level, and plumb, and applying flashing tape to prevent water infiltration.
  • Place shims on the sill to ensure the window is level and to create a small gap for insulation.
  • Position the window and secure it with screws or nails, ensuring it is plumb. Avoid over-tightening screws, which can warp the frame.
  • Apply exterior caulk for a watertight seal, install drip cap flashing, and finish with interior trim
  • Glass installation, repair, and replacement services for residential and commercial projects, including windows, doors, and mirrors

Assembler

Medtronic
Irvine, CA
01.2023 - 01.2025
  • Checked the Radial Force of each stent using the MTS Radial Force Machine
  • Measured Thickness of each stent using a Heiden Hain Machine
  • Measured the width of each stent using a Visicon Sierra Machine
  • Inspected stents under microscope for passability, ensuring quality before QC submission.
  • Monitored line clearance and rejected non-compliant stents to maintain product standards.
  • Assisted with measuring integrity of medical Stent devices
  • Tissue Inspection and preparation
  • Package and shipping for all tissue that is processed
  • Tracked inventory of products, ensuring accurate stock levels for efficient operations.
  • Maintained a clean, clutter-free work area

Foreman

SKYEWALLS
Anaheim, CA
01.2021 - 01.2023
  • Lead Installer for 2 years, made sure trucks were stacked up and had enough material for the job.
  • Always on time and made sure crew was set and ready to go with a good energy and vibe.
  • Installed windows using precise measurements and techniques., made sure we had all materials including screws and nothing was damaged and ready to install.
  • Prepared water protection, put protector wrap, aluminum sill pan to make sure water wouldn’t go in.
  • Framing for windows, made sure everything was leveled, plumbed, and squared.
  • Inspected aluminum doors for defects and ensured they met quality standards. made sure they had no scratches and made sure everything was in good shape.
  • Made sure we had all material to install the door.

Fernando Tejeda Construction
Garden Grove, CA
01.2014 - 01.2020
  • Measure and record openings or distances to layout areas where construction work will be performed.
  • Read plans/project, used nail guns, saws, grinders, and every tool necessary for framing with accuracy
  • Handled routine repairs to building such as installing or repairing electrical wiring, plumbing, and drywall
  • Measure, cut, and shape wood
  • Installed windows, doors, roofing and flooring
  • Responsible to work independently or as a team to meet deadlines
  • Maintain a clean and safe work area

Carls Jr
Garden Grove, CA
01.2013 - 01.2014
  • Provided quick accurate service in a team environment
  • Food preparation, cash register
  • Observant of all the safety requirements implemented by the store
  • Restocked condiments, swept and mopped floors
  • Maintained high standards of cleanliness and sanitation
  • Prepared quality products while maintaining proper food safety practices

Party City
Garden Grove, CA
01.2012 - 01.2013
  • Helped customers select products that best fit their personal needs
  • Maintained visually appealing and effective displays for the entire store
  • Kept store clean and maintained neat, Orderly product displays
  • Processed sale transactions accurately and in a timely manner
  • Unloaded trucks, stocked shelves and carried merchandise out on the floor for customers

Education

Contractors License -

07-2026

High School Diploma -

Marie L. Hare High
01-2012

Skills

  • Loyal self-motivated
  • Spanish bilingual
  • Ability to work independently
  • Ability to work collaboratively
  • Forklift
  • Using hand tools
  • Winding
  • Soldering
  • Framing
  • Plumbing
  • Underground Plumbing
  • Stucco
  • Drywall
  • Electrical
  • Know how to read facility layouts
  • Know how to read construction drawings
  • Know how to read plans
  • Team collaboration
  • Attention to detail
  • Time management
  • Electrical assembly
  • Production scheduling
  • Machine operation
  • Manufacturing experience
  • Power and hand tools
  • Pallet loading
  • Production equipment assessment
  • Expert assembler
  • Production line collaboration

Certification

High School Diploma

Timeline

Foreman/Lead installer

Tiffany Glass & Mirror
01.2025 - Current

Assembler

Medtronic
01.2023 - 01.2025

Foreman

SKYEWALLS
01.2021 - 01.2023

Fernando Tejeda Construction
01.2014 - 01.2020

Carls Jr
01.2013 - 01.2014

Party City
01.2012 - 01.2013

Contractors License -

High School Diploma -

Marie L. Hare High
Jose V. Cruz