Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jose Villasenor

Boilermaker, Piper Fitter And Welding Supervisor
Houston

Summary

Results-oriented General Foreman with a strong focus on safety compliance, team leadership, and effective communication. Proven ability to enhance workplace safety and ensure project adherence to specifications.

Detail-oriented professional skilled in job planning and safety inspections. Known for enhancing team performance through effective communication and job coaching. Ready to leverage experience to improve project outcomes and ensure compliance with safety protocols.

Construction professional prepared for challenges of leading workforce to achieve project goals. Known for implementing process improvements that enhance productivity and safety. Valued for collaborative approach and adaptability to evolving project requirements, possessing skills in leadership and problem-solving.

Disciplined General Foreman experienced in scheduling projects, inspecting work and completing pressure tests. Knowledgeable about training, monitoring and evaluating employees and maintaining safety. Expertise in operating both medium and light construction equipment.

Attentive General Foreman with expertise in coordinating supplies, understanding project requirements and training new team members. Hardworking and reliable problem-solver with good organizational and communication abilities. Productive individual well-versed in placing material orders and inspecting completed work.

Dependable Working Foreman experienced in safely managing team of effective employees and contractors. Promoting expertise in organizing resources and tasks.

Knowledgeable General Foreman well-versed in leading [Type] crews to complete jobs within tight deadlines. Delegates assignments, manages schedules and coordinates resources. Excellent planning and problem-solving abilities.

Overview

11
11
years of professional experience
2
2
Languages

Work History

General Forman

Gulfspan Industrial
05.2025 - Current
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Performed job safety analysis on a daily basis to mitigate risks for all workers and visitors to job sites.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Ordered supplies and materials for installation of new work and remodeling of existing systems.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Worked alongside team to accomplish work goals according to schedule.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Completed final walkthroughs at job sites to close out projects.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Inspected equipment and tools used for safe operation.
  • Provided feedback to workers on job performance and safety procedures.

Lead Boilermaker

REPCON
02.2024 - 04.2026
  • Developed strong working relationships with colleagues, fostering a positive team environment that promoted collaboration and open communication.
  • Contributed to plant production goals by keeping piping system withing specs.
  • Communicated effectively with management regarding project timelines, resource needs, and potential challenges.
  • Supported quality control efforts by inspecting completed work for adherence to specifications.
  • Participated actively in safety meetings to maintain awareness of emerging risks or changes in procedures that could affect job performance.
  • Collaborated with other mechanics and tradespeople to troubleshoot issues and complete projects efficiently.
  • Diagnosed mechanical issues in a timely manner, minimizing downtime for critical operations.
  • Ensured proper functioning of piping systems by conducting pressure tests and monitoring performance metrics.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Maintained compliance with all safety procedures from both client and employer.
  • Installation of isolating systems for safe entry on confined spaces to performs inspections and/or repairs as required.
  • Inspected valves; removed, replaced, or installed components to correct operating deficiencies.
  • Cleaned and maintained piping systems and associated equipment to increase efficiency and performance level.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Utilized specialized tools and machinery to complete repairs and installation.
  • Disassemble/Assemble of heat exchangers for inspections and repairs as required.
  • Perform Hydrostatic test (water, diesel,air) to verify pressure holding.

Boilermaker Mechanic

Universal Plant Services
01.2015 - 01.2024
  • Performed disassembling and assembling tasks as needed, ensuring strong connections between components for long-lasting repairs or installations.
  • Enhanced workplace safety with thorough inspections of piping systems, Distillation towers, vacuum towers, drums and vessels, identifying potential hazards and addressing them promptly.
  • Ensured proper functioning of piping and heat hechangers systems by conducting pressure tests and monitoring performance metrics.
  • Completed complex installations of new piping and heat exchangers systems, adhering to manufacturer guidelines and industry best practices.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.
  • Coordinated movement of materials and equipment to job sites.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Participated actively in safety meetings to maintain awareness of emerging risks or changes in procedures that could affect job performance.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Utilized specialized tools and machinery to complete repairs and installation.

Education

No Degree -

North Shore Senior High School
Houston, TX
05.2001 -

Skills

Team leadership skills

English and Spanish fluent

Attendance monitoring

Onboarding and coaching

Job site maintenance

Customer assistance

Hand and power tools

Job planning

Customer relations

Coordinating tasks

Supervisory skills

Verbal and written communication

Safety compliance

Training and mentoring

Team building

Leading teams

Safety protocols

Crew leadership

Inspections

Isometric and P&ID drawings

Timeline

General Forman

Gulfspan Industrial
05.2025 - Current

Lead Boilermaker

REPCON
02.2024 - 04.2026

Boilermaker Mechanic

Universal Plant Services
01.2015 - 01.2024

No Degree -

North Shore Senior High School
05.2001 -
Jose VillasenorBoilermaker, Piper Fitter And Welding Supervisor