Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic
Joseph Spinola

Joseph Spinola

Director of Construction
Morristown,NJ

Summary

Vice President of Operations/Director of Construction with substantial experience and knowledge regarding public works regulations and construction, providing expert direction in all aspects of public works contract construction. Results oriented individual who works efficiently and effectively to complete projects on time and within budget. Thirty-three years in the Heavy Civil Construction Field. Concrete estimation. Blueprint fluency. Project budgeting. Labor Savings of 15-30% per Job. Professional Experience. Proficient in HeavyJob and Raiken. Superb management skills. Safe job site set-up. Cost control. Seasoned Construction professional with exceptional leadership and project management skills. Competent in team, budget and schedule oversight. Develops scopes, checks field activities and updates clients.

Overview

33
33
years of professional experience
8
8
Certificate

Work History

Director of Construction

NYCC/JPL JV
03.2022 - Current
  • Increased project efficiency by streamlining communication and implementing time management strategies.

Reduced construction costs through effective budgeting and negotiation with suppliers.

  • Improved safety records by enforcing rigorous safety protocols and conducting regular site inspections.
  • Completed projects on-time and under-budget by closely monitoring progress and swiftly addressing any issues.
  • Contributed to company growth by identifying new business opportunities, networking with industry professionals, and attending relevant conferences and events.

Director of Field Operations, Northeast Division

Spiniello Companies
12.2020 - 03.2022
  • Review, analyze, and evaluate day to day operations to ensure the best business practices are in place for open cut pipe installation of water and sewer lines
  • Oversee production and purchases to optimize performance versus cost within the team
  • Payroll, budget, equipment, and workforce reviewed daily to make sure each crew has necessary supplies for efficiency and productivity
  • Led consultant services to projects in Baltimore MD, Washington DC, and Bethlehem PA
  • Current Projects: JCMUA - Phase 1-2 sewer and water replacement and rehab $127,000,000
  • Trenton Water Works - Lead replacement projects in Hamilton and Trenton $53,000,000
  • DC Water - Lead replacement project in Washington, DC $26,000,000.
  • Enhanced overall operational efficiency by streamlining processes and implementing new strategies.
  • Reduced expenses for the department by identifying cost-saving opportunities and optimizing resources.
  • Oversaw complex projects from inception to completion, meeting deadlines while maintaining high-quality standards.

Director of Operations

Montana Construction
09.2019 - 12.2020
  • Increased initial daily productivity from 3-5 service replacements to 12-15 service replacements per twelve crews within a two-week timespan
  • Coordination of customer outreach for initial material verification and scheduling
  • Quality assurance leader, inspecting all work to verify compliance and quantity installation per home
  • Review and approve all change order work with job PM's
  • Emergency work performed for 3 New Jersey counties $43,000,000
  • Billing and scheduling foreman for all emergency work
  • City of Newark-Lead Pipe Replacement Project $82,000,000.
  • Improved operational efficiency by streamlining processes and implementing innovative solutions.
  • Led cross-functional teams for successful completion of projects, resulting in increased productivity.

Vice President of Operations

Carbro Constructors Corp.
10.1999 - 09.2019
  • Representative Projects: Long Beach Island - Garden State Parkway
  • Value: $20.2 Million
  • Oversaw the construction of new entry and exit ramps on the GS Parkway, as well as the conception of an additional lane to the north and south bound sides of the GS Parkway
  • Route 30 Expansion - Cooper River
  • Value: $24.3 Million
  • Supervised the expansion of Route 30 alongside the Copper River
  • Work included the installation of six (6) outfalls with flat valves in conjunction with extensive sheeting and cofferdam work along the Cooper River
  • Jersey Shore Outlets - Neptune, NJ
  • Value: $12.3 Million
  • Project which was composed of the erection of a new bridge and exit/entry points to the mall, including parking areas and key walls
  • Route 206 Bypass - Hillsborough, NJ
  • Value: $43 Million
  • Consisted of the construction of the Route 206 Bypass (approximately 1.7 miles of newly constructed roadway) including clearing site, site excavation (260,000 CY), embankment (442,000 CY), storm utilities (22,000 LF), water utilities, sanitary utilities, paving & grading (85,000 SY), six single span bridges over various roads, waterways and operating railroads, a precast arch culvert (144 LF), and miscellaneous site work and restoration
  • Route 7 Wittpenn Bridge - Kearny, NJ (Contract 3)
  • Value: $145 Million
  • NJDOT project consisting of the construction of three sets of concrete footings, columns, and caps
  • Extensive excavation, pile driving, and sheeting operations took place due to the poor nature of the existing ground
  • Concrete forms were also erected to make room for the mass concrete pours that took place for all three types of concrete structures
  • Army Corp
  • Of Engineers
  • Value: $42 Million
  • Project made up of four different segments
  • Segment T involved the formation of 2.2-mile worth of drainage levees with sluice gates, flap valves, and a pump station
  • Segments R-1 through R-3 were composed of sheeting operations, the formation of concrete caps and levee work along with extensive drainage and sanitary work.

Education

Morristown Community College
Morristown, NJ

Skills

  • Site Safety Management
  • Construction Estimating
  • Subcontractor Management
  • Scheduling Expertise
  • Conflict Resolution
  • Quality Control
  • Budget Management
  • Stakeholder Communication
  • Cost Control
  • Design-Build Experience
  • Client Relations
  • Risk Assessment
  • Blueprint Reading
  • Time Management
  • Team Leadership

Certification

  • American Institute of Concrete (ACI) Lifetime Certification
  • 40 Hours Hazardous Waste Operations and Emergency Response Standard (HAZWOPER)
  • OSHA 30 Hour Construction Training Course
  • Traffic Controller Coordinator
  • OSHA Confined Space Entry Certification
  • OSHA Trenching/Excavating Certification
  • US Army Corps of Engineers Construction Quality Management for Contractors
  • Adult CPR & First Aid Certification OSHA
  • Fall Protection Certification
  • NJ Transit Safety Training and Roadway Worker Safety

Additional Information

I am a Director of Construction currently for a Joint Venture working on the East Coast Resiliency project to mitigate flooding and infiltration through all drainage and sewer utilities by way of hydraulic lock gates and overflow chambers.

My experience with all facets of local and federal government agencies as well as MTA, NJ Transit, CSX make me very diversified to handle many facets of job types as well as Civil and private.

Timeline

Director of Construction

NYCC/JPL JV
03.2022 - Current

Director of Field Operations, Northeast Division

Spiniello Companies
12.2020 - 03.2022

Director of Operations

Montana Construction
09.2019 - 12.2020

Vice President of Operations

Carbro Constructors Corp.
10.1999 - 09.2019

Morristown Community College
Joseph SpinolaDirector of Construction