From 1997-2006 I worked as a laborer and heavy equipment operator at MEC Construction building compressor stations. From 2007-2011 I worked as an Inspector for EQT as a general, then welding, and moving up to a chief. From 2011-present I have been working as a contract project manager for EQT and ETRN where I have oversaw all aspects of pipeline projects…. Routing, assisting with land and enviro permitting, cost estimating, writing full SOWs, putting full bid packages together, all aspects of construction, inspection management, asset records, and NOT close out. From 2011-2015 I worked for McDaniel Technical Services, Inc. as a project manager I oversaw all of the Integrity Segmentation compliance projects, which consisted of launcher and receiver installations, valve replacement projects, OPP installation projects, slide repair projects and Interconnect projects. I worked as a CPM for QIS from 2016-2019 and then when they lost their contract, I moved to Team Environmental and have been there as CPM/chief from 2019 to present day. As a construction project manager 2015-present, I’ve managed major pipeline projects for the EQT and ETRN major construction group. I have been a CPM on the OVC project that consisted of 36 miles of 30” in WV and Ohio, the MOSA-31 project that consisted of 10 miles of 20” in Doddridge County WV, the NIHA-D001 Hammerhead that consists of 45 miles of 30” from Wetzel County WV to Waynesburg PA, the Hammerhead Expansion (MOME-S192 2,000’ 8”, MOME-D192 10,000’ 8”, MOME-007 launcher install, MOHA-D002 1,500’ 16”, MOHA-D005 20,000’ 16”) in Wetzel County WV, and currently working on the OVC Expansion projects that consist of approximately 3.8 miles of new 24-inch-diameter natural gas pipeline (H-326) that paralleled the 30” Hammerhead and 42” MVP pipelines, ~146 feet (0.02-mile) of new eight-inch-diameter natural gas pipeline (H-329), ~0.7-mile of new 16-inch-diameter natural gas pipeline (H-330), ~0.13-mile of new 16-inch-diameter natural gas pipeline (H-330:L01 and H-330:L02 Spur), and ~270 feet (0.03-mile) of new 12-inch-diameter natural gas pipeline (Logansport Spur) in Wetzel County, WV. I have also worked as CPM during this time overseeing 3 full dehy installation projects (Corsair, Strosnider with EQT in Pa and the Miracle Run dehy project with North East Energy in WV.