Summary
Overview
Work History
Education
Skills
Certifications Education
Languages
Timeline
SeniorSoftwareEngineer

Juan A. Lopez

Santa Fe,TX

Summary

With 19 years of experience in the petrochemical plant industry, I possess a strong ability to plan, direct, and coordinate the construction and maintenance of job site structures, facilities, and systems. Excelling in overseeing and participating in project organization, scheduling, and implementation, I have taken on diverse roles and responsibilities. These include fitting and fabricating pipes according to ISO standards, completing retubes of fin fans, exchangers, heaters, and boilers. Moreover, I have successfully coordinated material and logistics for T/A activities and managed piping and mechanical T/A activities. My exceptional multitasking skills enable me to oversee multiple projects simultaneously. Proficient in all Microsoft applications and the Toadfly IPS Planning Tool.

Overview

20
20
years of professional experience

Work History

Mechanical Planner

Austin Industries
01.2025 - Current
  • Formulated precise task plans, leading to better forecasting of manpower and project timelines.

Planner / Coordinator

PTS Advance
01.2023 - 01.2024
  • Collaborated with cross-functional teams to align goals and ensure project success.
  • Optimized inventory control, reducing waste and improving costefficiency.
  • Identified potential risks, implementing mitigation plans to minimize impact on project timelines.
  • Worked directly with production personnel to resolve production scheduling issues and conflicts

Pipe General Forman

Austin Industrial
01.2018 - 01.2023

Directed multiple teams to maintain safety standards and meet production goals.

Construction pipe General Forman

Ohmstede
01.2018 - 12.2018
  • Oversaw all aspects of pipe fabrication from material selection to final assembly while maintaining strict adherence to industry guidelines and client specifications

Pipe Forman

Starcom Construction
01.2015 - 12.2018

Oversaw operations of crews, maintaining consistent focus on performance quality and workplace safety.

Mechanical Forman

JV Driver Construction
01.2014 - 12.2015
  • Mentored junior staff members, providing guidance on best practices and fostering professional growth through targeted feedback.
  • Prioritized safety, conducting regular inspections to ensure compliance with industry standards

Pipe Forman

OPD Construction
01.2013 - 12.2014
  • Created and implemented plans to maximize efficiency of workers.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.

Pipe Forman

S&B Construction
01.2012 - 12.2013
  • Coordinated pre-construction meetings facilitating efficient planning discussions between stakeholders involved critical to successful project execution.
  • Successfully navigated challenging environments such as confined spaces, extreme temperatures, and remote locations to complete pipefitting projects.

Pipe Forman

Zachary Construction
01.2009 - 12.2012
  • Streamlined workflows by identifying areas for improvement in pipe installation, maintenance, and repair processes.
  • Contributed to successful project completion by coordinating tasks among a diverse group of workers with various skill levels.

Pipe Forman

Shaw Construction
01.2008 - 12.2009
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.

Pipefitter

De Jean Construction
01.2005 - 12.2008
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.

Education

High School -

Reagan
Houston, Texas
05.2000

Skills

  • Strong communication skills
  • Time management
  • Team leadership
  • Active listening
  • Cost estimation
  • Maintenance planning
  • Materials and labor costing
  • Skilled maintenance and repair
  • Repair requirements determination
  • Leadership skills
  • Problem-solving abilities
  • Multitasking Abilities
  • Preventive maintenance planning
  • Scheduling and coordination
  • Mechanical design expertise
  • Blueprint reading mastery
  • Technical drawing proficiency
  • Time management abilities

Certifications Education

  • 05/01/00, High School, Reagan, Houston, Texas
  • NCCER Plus Certified Pipe Fitter
  • HASC Basic Plus
  • TWIC

Languages

Spanish
Native or Bilingual
English
Native or Bilingual

Timeline

Mechanical Planner

Austin Industries
01.2025 - Current

Planner / Coordinator

PTS Advance
01.2023 - 01.2024

Pipe General Forman

Austin Industrial
01.2018 - 01.2023

Construction pipe General Forman

Ohmstede
01.2018 - 12.2018

Pipe Forman

Starcom Construction
01.2015 - 12.2018

Mechanical Forman

JV Driver Construction
01.2014 - 12.2015

Pipe Forman

OPD Construction
01.2013 - 12.2014

Pipe Forman

S&B Construction
01.2012 - 12.2013

Pipe Forman

Zachary Construction
01.2009 - 12.2012

Pipe Forman

Shaw Construction
01.2008 - 12.2009

Pipefitter

De Jean Construction
01.2005 - 12.2008

High School -

Reagan
Juan A. Lopez