Summary
Overview
Work History
Education
Skills
Timeline
Generic

Juan Becerra

San Diego,USA

Summary

Dedicated Industry professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Overview

11
11
years of professional experience

Work History

Tech 3

Delphinus Engineering
San Diego, CA
06.2024 - 09.2025

• AFFF Station

• JP5

• Cat 5

• BOF

• Assembled Racks

•Troubleshot and resolved technical issues in equipment to ensure operational efficiency

•Diagnosed and repaired problems with electrical and mechanical systems

•Installed electrical systems

•Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.

•Installed and wired electrical transformers, service panels, and circuit breakers.

•Installed, maintained, repaired, and tested equipment for electricity generation and utilization

  • Read and interpreted electrical, mechanical, drawings and electrical
  • Demonstrated expertise in use of cable reels, stripping tools, to complete fast-paced work.

Technician 2

GDIT General Dynamics
10.2022 - 04.2024
  • Work on COAX, TRIAX
  • MCT S, MCP
  • HELIAX CABLE
  • FIBER
  • BOF
  • CAT 5 both male &female
  • Testing MTCS
  • Inventory equipment
  • Warehouse experience
  • Multi pin connectors
  • Chafing Rings
  • Hangers assemble
  • Remove and install equipment
  • Work on tubes and nylon
  • Work on speakers Red phones
  • Cable team lead
  • Work on JUCA install (canes) for the (CVN-70) Carl Vinson
  • Power panel SYM 955
  • Distribution panel SYM 600
  • Junction Box SYM 400.1
  • Switch SYM804.1
  • Receptacle outlet
  • Switch SYM 780
  • Light incandescent
  • Terminal box SYM 434
  • Remove LRU equipment

Marine Electrician

Huntington Ingalls
San Diego, USA
05.2021 - 03.2022
  • Executed electrical wiring plans for and other electrical systems.
  • Prevented breakdown of systems by routinely inspecting and replacing old wiring and cleaning circuits
  • Replaced and repaired lighting fixtures and electrical control and distribution equipment
  • Remove Equipment from secret spaces
  • Install fiber cables
  • Connected appropriate parts to deliver power to audio and visual equipment.
  • Removing LRU equipment

Mechanical Assembler

Serco
San Diego, USA
09.2014 - 03.2020
  • Read and interpreted blueprints, and drawings to assemble parts and products.
  • Worked with heavy machinery and various power tools when assembling parts.
  • Built containers and packed parts in accordance with detailed packing Specifications
  • Worked on BOF Tiber cable.
  • Built the FT and FO boxes for the BOF fiber cable and also drilling the holes and studs.
  • Worked on different canes installs
  • Worked on CAT 5 male and female
  • Test cat 5 cables from the rack to the box
  • Worked on MCT and MCPS
  • Worked on different kind of cables (CAT 5, Fiber, BOF (fiber), COAX
  • HELIAX, power cables such as D-23 to D-300
  • Worked on Receptacles
  • Power panels (Prep it)
  • Stud-welding for all the cable ways
  • Banding all the cable ways
  • Connectors DB25
  • Unbolt equipment
  • Worked on 5 carriers for stud-welding all the cable ways
  • Packing stuffing tubes
  • Remove LRU equipment

Education

High School - undefined

Lazaro Cardenas
Tijuana

Skills

  • Electrical Wiring and Fixtures
  • Cable management
  • Repair Planning
  • Stud-welding
  • Canes Install

Timeline

Tech 3

Delphinus Engineering
06.2024 - 09.2025

Technician 2

GDIT General Dynamics
10.2022 - 04.2024

Marine Electrician

Huntington Ingalls
05.2021 - 03.2022

Mechanical Assembler

Serco
09.2014 - 03.2020

High School - undefined

Lazaro Cardenas